EPML00899613 · EVA COPPER MINE PTY LTD
Minerals environmental authority EPML00899613 (EVA COPPER MINE PTY LTD), Granted. 270 conditions indexed. Holds PRC plan P-PRCP-100761331.
- Status
- Granted
- Holders
- EVA COPPER MINE PTY LTD
- Tenures
- ML90162; ML90163; ML90164; ML90165; ML90166
- PRC plan
- P-PRCP-100761331 · effective 2026-08-31
- How it was read
- Numbered conditions
- Register
- Register record · Instrument PDF
Conditions
270 numbered conditions read from the current instrument. Page numbers link into the register PDF.
- A1
This Environmental Authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm.
- A2
No more than 20 million tonnes of gold and copper ore is to be processed at the licensed place in a year.
- A3
In carrying out the mining activity the holder of this Environmental Authority must comply with Schedule A - Table 1 (Authorised Mining Activities). Schedule A - Table 1 (Authorised Mining Activities) Maximum Area Coordinates of Disturbance Mine Domain Mine Feature Tenure (GDA2020 MGA zone 54) (ha) 112 Easting Northing 45 Little Eva Pit ML90165 22 410716 7772013 Turkey Creek Pit ML90165 17 Bedford North Pit ML90164 44 412430 7771536 Bedford South Pit ML90164 142 Lady Clayre Pits (four total) ML90162 44 414992 7767735 Blackard Pit ML90164 85 Mining area Scanlan Pit ML90162 45 414972 7766212 Waste Rock Little Eva WRD ML90165 19 Dump Bedford North WRD ML90164 49 409780 7752577 Processing area Bedford South WRD ML90164 55 Lady Clayre ML90162 188 412521 7765478 Ore Stockpile Blackard West WRD ML90164 88 Blackard South WRD ML90164 412299 7754333 Scanlan WRD ML90162 43 411662 7772520 Process Plant infrastructure area ML90165 8 4 415558 7767270 Concentrate Storage and Handling ML90165 23 Shed 415329 7766234 ML90165 26 Temporary Concentrate Stockpile 410102 7753093 ML90164 28 Mine infrastructure area ML90164 52 411448 7766332 Power plant infrastructure area ML90162 15 412881 7763529 ROM Stockpile ML90164 512 412119 7755195 Little Eva and Turkey Creek LGO ML90165 stockpile ML90162 145 41167 7771166 ML90163 Blackard ROM stockpile ML90164 411767 7771185 ML90165 411804 7771204 412123 7770991 411407 7770736 411621 7771593 411834 7771681 Blackard LGO stockpile 411772 7765395 Scanlan and Lady Clayre ROM 411220 7765523 stockpile Tailings Storage 411340 7753966 Facility (TSF) TSF 412843 7769353 Clean and MAW Clean and MAW drains 412641 7770343 drains 412207 7762678 413228 7765140 411955 7754471 412667 7763059 413094 7765796 411756 7772040 412765 7769381 412255 7770406 Permit OFFICIAL Environmental Authority EPML00899613 Maximum Area Coordinates of Disturbance Mine Domain Mine Feature Tenure (GDA2020 MGA zone 54) (ha) ML90165 36 Easting Northing Northern MAW Dam ML90165 5.52 411204 7773048 Temporary MAW void1 (within Little Eva Pit) ML90164 30 410756 7771715 Blackard Northern MAW Dam ML90164 37 MAW dams and Blackard Southern MAW Dam ML90165 14 411957 7766999 storage TSF MAW Dam ML90164 15 413247 7764438 Bedford MAW Dam ML90162 27 411190 7770494 Turkeys Nests Scanlan MAW Dam ML90162 14 415481 7766773 Lady Clayre MAW Dam ML90162 1 412456 7755166 Southern ROM Dam ML90165 0.6 410482 7752688 Northern MAW Dam Turkeys Nest ML90165 0.5 411588 7753947 Turkey Creek Pit Turkeys Nest ML90165 0.5 411052 7772774 Turkeys Nest 2 (Core Farm) ML90165 0.5 412341 7772246 Turkeys Nest 3 (TSF) 413351 7770987 413028 7770432 MAW release RP1 - Northern MAW Dam ML90165 - 410837 7773142 points RP6 - Scanlan MAW Dam ML90162 - 413509 7756518 Watercourse RP9 - Lady Clayre MAW Dam 412466 7753519 diversion Cabbage Tree Creek, Blackard ML90162 - 409421 7773689 Creek and unnamed tributary of 411166 7773689 Blackard Creek Diversions and ML90165 136 409421 7770126 buffer land 411166 7770126 Scanlan Pit unnamed tributary ML90162 5 Flood protection Little Eva Pit Levee and buffer land ML90165 63 409596 7773325 411212 7773325 levee 409596 7770766 411212 7770766 Scanlan Pit Levee ML90162 5.2 412322 7753993 409579 7752253 Lady Clayre Pit Levee ML90162 1 412572 7771935 412378 7764753 Flood protection Turkey Creek Bund ML90165 0.3 413232 7764871 bund Blackard Bund 1 411559 7770764 Blackard Bund 2 ML90164 0.7 411752 7770852 411563 7770860 ML90164 0.9 417241 7769353 Process Area Process Water Pond ML90165 1.5 water storages Raw Water Pond Site Runoff Pond ML90165 1.3 ML90165 1.5 South-east basin (Accommodation ML90166 1 Sediment Village) retention basin North-east basin (Accommodation ML90166 1 417295 7769638 Village) Clean water Blackard Western Clean Water Dam ML90165 5 412281 7764679 dams 408955 7772045 Pump and transfer stations 408120 7773480 410931 7774960 Water NBPB001 ML90164 8 410834 7775449 production bores NBPB002 ML90165 410426 7775024 NBPB003 410267 7774894 NBPB004 410829 7774558 NBPB005 1 No associated MAW release point 2 Located within maximum area of disturbance for Little Eva Pit (112 ha) Permit OFFICIAL Environmental Authority EPML00899613 Maximum Area Coordinates of Disturbance Mine Domain Mine Feature Tenure (GDA2020 MGA zone 54) (ha) ML90165 Easting Northing ML90165 120 WEB01PB ML90162 14 409798 7774328 WEB02PB ML90163 WEB05PB ML90164 287 406383 7774557 WEB05SPB ML90165 WEB06PB ML90166 1 409110 7768894 WEB07PB ML90165 14.5 WEB08PB ML90166 409110 7768894 WEB09PB ML90162 59 408534 7773080 Solar farm and BESS ML90163 409366 7772456 Solar farm access and powerline ML90164 10 easement ML90165 408200 7771607 ML90166 5.6 25.2 407753 7773742 To be 1.9 advised 5.6 407179 7772808 5.1 Solar Farm ML90165 407894 7773193 ML90165 1 411480 7770698 ML90165 0.6 Access and haul roads ML90165 1.5 - - ML90164 4 Magazine and explosives facility ML90166 4 413633 7772239 Accommodation Village ML90166 417150 7769500 ML90166 Ancillary Powerlines ML90166 Infrastructure ML90166 - - Integrated waste management To be advised To be advised facility at least 2 at least 2 Laydown area Tailings Storage Facility and months prior to months prior to Process Plant Laydown construction. construction. Sewage Little Eva Laydown Treatment Plant Little Eva Access Laydown 411787 7770673 (STP) Turkey Creek Laydown Bedford laydown 410487 7772146 Material borrow STP 411184 7771782 pit 412265 7772415 STP disposal area 1 415026 7766700 Topsoil 407179 7772808 Stockpiles STP disposal area 2 407894 7773193 411480 7770698 Concrete aggregate borrow pit area 416054 7771551 Construction material borrow pit area 416793 7770664 Clay material borrow pit area (North) ML90165 91 408698 7772822 Clay material borrow pit area (South) ML90165 59 407392 7771357 Little Eva and TS010 ML90165 29 411061 7770976 Turkey Creek Pit 412711 7771406 mining area TS011 ML90164 0.22 411037 7772294 TS028 415382 7769911 Mine Access TS012 Road 410916 7765314 7766760 Blackard Pit TS026 ML90163 411216 mining area TS029 ML90164 103 Permit OFFICIAL Environmental Authority EPML00899613 Maximum Area Coordinates of Disturbance Mine Domain Mine Feature Tenure (GDA2020 MGA zone 54) (ha) Easting Northing TS031 411390 7767457 TS034 411938 7763135 TS035 412195 7766764 TS037 412599 7762281 TS041 413086 7764809 Bedford Pit TS046 ML90164 32 413470 7764993 mining area TS049 ML90162 23 414780 7767578 Scanlan Pit TS050 414955 7767067 mining area TS051 ML90162 8 415015 7766591 Lady Clayre Pit TS052 415109 7765889 mining area TS053 ML90164 40 415437 7766527 TS054 ML90165 415503 7766203 Tailings Storage Facility TS039 ML90165 30 412856 7756180 Solar farm area TS021 ML90165 25 410170 7752873 Clay borrow pit TS025 410730 7752986 area TS027 ML90163 410947 7769492 TS030 411342 7769678 Ancillary TS033 ML90164 12 411893 7770741 infrastructure TS036 412314 7768595 area TS043 ML90165 413108 7770656 TS044 413164 7768553 TS048 414499 7769462 TS013 407451 7772200 TS014 407803 7771213 TS015 409205 7772062 TS006 417206 7770584 TS007 417099 7770139 TS008 417079 7769717 TS016 409661 7774415 TS024 410597 7769501 TS032 411520 7774031 TS038 412736 7760949 TS040 413033 7758911 TS042 413107 7767679 TS045 413207 7772980 TS047 413580 7772136 ML90162 ML90163 Exploration Exploration ML90164 30 - - ML90165 ML90166 Maintenance of Measures, Plant and Equipment
- A4
The holder of this Environmental Authority must: (a) install measures, plant and equipment necessary to ensure compliance with the conditions of this Environmental Authority; (b) maintain such measures, plant and equipment in a proper condition; Permit OFFICIAL Environmental Authority EPML00899613 (c) operate such measures, plant and equipment in a proper manner; and (d) ensure all instruments and devices used for the measurement and monitoring of any parameter under any condition of this environmental authority are properly calibrated. Monitoring and Reporting
- A5
Except where specified in another condition of this environmental authority, all monitoring, monitoring data, records and reports required by this environmental authority or related to environmental management of the activities must be: (a) carried out by an appropriately qualified person; (b) kept for a period of not less than five (5) years; (c) provided to the administering authority in the specified format within ten (10) business days of a request; and (d) undertaken in accordance with the most recent version of any applicable standard or guideline for the activity.
- A6
The following information must be recorded in relation to all monitoring required under a condition of this environmental authority: (a) the date and time when the sample/measurement was taken; (b) the location where the sample was taken; and (c) any other pertinent details of relevance to interpreting the sampling results (i.e., stream flow, wind conditions, atmospheric conditions, locations of blasting, or any unusual observations such as odour or colouration). Risk Management
- A7
The holder of this Environmental Authority must develop and implement a risk management system for mining activities which conforms to the Standard for Risk Management (ISO31000:2009) or the latest edition of the Australian Standard for Risk Management prior to commencement of mining activities. Emergency Response/Contingency
- A8
The holder of this Environmental Authority must develop and implement an emergency response/ contingency plan to respond to emergency events and incidents prior to commencement of mining activities. The emergency response/contingency plan must address the following matters as a minimum: (a) response procedures to be implemented to prevent or minimise the risk of environmental harm arising from emergency events and incidents; (b) response procedures to minimise the extent and duration of environmental harm caused by an emergency event or incident; (c) the practices and procedures to be employed to restore the environment or mitigate any environmental harm caused; (d) the resources to be used in response to an emergency event or incident; (e) procedures to investigate the cause of any emergency events or incidents, including releases, and remedial actions to reduce the likelihood of recurrence of similar events; (f) the provision and availability of documented procedures to staff attending any emergency event or incident to enable them to effectively respond; (g) training of staff that will be called upon to respond to emergency events or incidents to enable them to effectively respond; (h) timely and accurate reporting of the circumstance and nature of emergency events or incidents to the administering authority in accordance with conditions of this Environmental Authority; (i) procedures for accessing monitoring points during emergency events or incidents; and (j) procedures to notify any potentially impacted stakeholder who may be affected by the emergency event or incident. Permit OFFICIAL Environmental Authority EPML00899613 Notification
- A9
The holder of this Environmental Authority must notify the administering authority by telephone and email as soon as practicable but within twenty-four (24) hours, after becoming aware of any incident, exceedance or release of contaminants not in accordance, or reasonably expected to be not in accordance with the conditions of this Environmental Authority.
- A10
The notification in condition (A9) must include, but not be limited to, the following: (a) the Environmental Authority number and name of the holder; (b) the name and telephone number of the designated contact person; (c) the location of the incident, exceedance or release; (d) the date and time of the incident, exceedance or release; (e) the time the holder of this Environmental Authority became aware of the incident, exceedance or release; (f) where known: (i) the estimated quantity and type of substances involved in the incident, exceedance or release; (ii) the actual or potential cause of the incident, exceedance or release; (g) a description of the nature and effects of the incident, exceedance or release including environmental harm and/or nuisance caused, threatened, or suspected to be caused by the incident, exceedance or release. (h) any sampling conducted or proposed, relevant to the incident, exceedance or release; (i) immediate actions taken to prevent and/or mitigate any further environmental harm and/or environmental nuisance caused by the incident, exceedance or release; (j) what notification of stakeholders who may be affected by the incident, exceedance or release has occurred/is being undertaken.
- A11
The holder of this Environmental Authority must notify the occupiers or registered owners of affected land and any other potentially impacted stakeholder as soon as reasonably practicable after becoming aware of any incident, exceedance or release that has the potential to impact on environmental values or breaches any condition of this Environmental Authority concerning releases of contaminants to the environment.
- A12
Within ten (10) business days following the initial notification of an incident, emergency, or receipt of monitoring results, whichever is the latter, further written advice must be provided to the administering authority, including the following: (a) results and interpretation by an appropriately qualified person of any samples taken and analysed; (b) outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and (c) proposed actions to prevent a recurrence of the emergency or incident. Complaints
- A13
The holder of this Environmental Authority must record all environmental complaints received about the mining activities including: (a) name, address and contact number of the complainant; (b) time and date of complaint; (c) reasons for the complaint; (d) investigations undertaken; (e) conclusions formed; (f) actions taken to resolve the complaint; (g) any abatement measures implemented; and (h) person responsible for resolving the complaint.
- A14
The holder of this Environmental Authority must, when requested by the administering authority, undertake relevant specified monitoring within a reasonable timeframe nominated or agreed to by the administering authority to investigate any complaint of actual or potential environmental harm. The results of the investigation (including an analysis and interpretation of the monitoring results) and abatement measures, where Permit OFFICIAL Environmental Authority EPML00899613 implemented, must be provided to the administering authority within ten (10) business days of completion of the investigation, or no later than ten (10) business days after the end of the timeframe nominated by the administering authority to undertake the investigation. Community
- A15
The holder of this Environmental Authority must establish, promote and maintain easily accessible lines of communication between residents, stakeholders and landowners reasonably expected to be affected by the mining activity to ensure that environmental impacts are identified and managed. This must begin at least six (6) months prior to the commencement of mining activities, and include but not be limited to the following: (a) regular meetings with all relevant stakeholders at intervals of not more than six (6) months; and (b) the establishment of a consultative committee with representation of all relevant stakeholders that meet at regular intervals as determined by the committee. Third Party Reporting
- A16
The holder of this environmental authority must: (a) within one (1) year of the commencement of mining activities, obtain from an appropriately qualified person a report on compliance with the conditions of this Environmental Authority; (b) obtain further such reports at regular intervals, not exceeding three (3) yearly intervals, from the completion of the report referred to above; and (c) provide each report to the administering authority within ninety (90) days of its completion. Exploration
- A17
All exploration activities carried out at the licensed place must comply with each of the Standard Environmental Conditions contained in the most recent version of the Eligibility Criteria and Standard Conditions for Exploration
- A18
Where a condition of this Environmental Authority refers to a matter addressed in the Eligibility Criteria and Environmental Authority prevails. Transition to New Standards
- A19
Where a condition of this Environmental Authority requires compliance with a standard, guideline or policy published externally to this Environmental Authority and the standard, guideline or policy is amended or changed subsequent to the issue of this Environmental Authority, the holder of this Environmental Authority, unless otherwise agreed to by the administrating authority, must: (a) comply with the amended or changed standard, guideline or relevant legislation within two (2) years of the amendment or change being made, unless a different period is specified in the amended standard, guideline, policy or relevant legislation; and (b) continue to remain in compliance with the previous standard, guideline or policy until compliance with the amended or changed standard, guideline or policy is achieved. END OF CONDITIONS FOR SCHEDULE A Permit OFFICIAL Environmental Authority EPML00899613 SCHEDULE B - AIR General
- B1
Unless authorised by this Environmental Authority, the release of noxious or offensive odour, dust or any other airborne contaminant resulting from the mining activity must not cause environmental harm. Bulk Material Handling Management
- B2
The holder of this Environmental Authority must ensure that vehicles used for transporting bulk materials on or from the licensed place have appropriate load preparation to prevent the spillage and/or loss of particulate matter and/or windblown dust during transport. Air Quality - Dust Deposition
- B3
The holder of this Environmental Authority must conduct the mining activity in such a manner so as not to cause any exceedance of the limits identified in Schedule B - Table 1 (Dust Deposition Trigger Levels and Limits) at or beyond the boundaries of the licensed place. Schedule B - Table 1 (Dust Deposition Trigger Levels and Limits) Air Quality Indicator Measurement Period Trigger Level1 Limits 4 -g/m2/day - Arsenic and its compounds as arsenic4 Annual average 2 -g/m2/day - - Cadmium and its compounds as cadmium4 Annual average 330 -g/m2/day6 - 1206 mg/m2/day7 Copper and its compounds as copper4 Annual average Monthly average Total insoluble matter (insoluble analysis and particulate matter deposition rate)3 1. Trigger levels based on First General Administrative Regulation Pertaining to the Federal Emission Control Act (Technical Instructions on Air Quality Control - TA Luft) (Table 6 page 29). 3. Monitored in accordance with the most recent version of Australian Standard AS3580.10.1 Methods for sampling and analysis of ambient air - Determination of particulate matter - Deposited matter - Gravimetric method. 4. Metals analysis is to be carried out in accordance with a methodology, sufficient to produce representative results capable of comparison against the respective limits and trigger levels. 5. Determined based on TA Luft lead deposition guidelines and the HIL A soil investigation levels from NEPC (1999) Table 5-A 6. Based on the New Zealand Ministry for Environment Good Practice Guide for Assessing and Managing for Environmental Effects of Dust Emissions (Table 7.1) 7. The dust deposition limit is calculated over a nominal month as per AS/NZS3580.10.1 of 2003 (or more recent editions).
- B4
In the event of monitoring results showing an exceedance of any of the trigger levels specified in Schedule B - Table 1 (Dust Deposition Trigger Levels and Limits) at or beyond the boundaries of the licensed place, the holder of this Environmental Authority must: (a) complete an investigation to identify the cause of the exceedance; (b) if the investigation shows that the exceedance is not attributable to the mining activity then no further action is required and this must be advised to the administering authority within one (1) month; or (c) if the investigation shows that the exceedance is attributable to the mining activity provide a written report to the administering authority within one (1) month of the date of the monitoring results showing an exceedance, outlining: (i) details of the investigations carried out; (ii) details of the environmental impacts observed; and (iii) actions taken to prevent environmental harm.
- B5
If monitoring indicates the limits in Schedule B - Table 1 (Dust Deposition Trigger Levels and Limits) have been exceeded at a sensitive place or commercial place as a result of a mining activity, then the holder of this Environmental Authority must immediately implement dust abatement measures to ensure that dust emissions generated by the mining activity no longer exceed the levels specified in Schedule B - Table 1 (Dust Deposition Trigger Levels and Limits). Permit OFFICIAL Environmental Authority EPML00899613
- B6
Prior to the commencement of mining activities, the holder of this Environmental Authority must develop and implement a dust deposition monitoring program to monitor the deposition of contaminants in dust generated by the mining activity in the receiving environment and the actual and potential environmental impacts as a result of that deposition. At a minimum, the program must include: (a) a description of the sources, locations and predicted quantity of contaminants in air emissions generated by each mining activity carried out at the licensed place; (b) collection of contaminants in dust deposition samples specified in Schedule B - Table 1 (Dust Deposition Trigger Levels and Limits) at the monitoring locations and at the frequency specified in Schedule B - Table 2 (Air Quality Monitoring Program - Dust Deposition) and Schedule J - Plan 2 - Air Quality Monitoring Locations; (c) annual assessment of the environmental harm caused by dust deposition on the receiving environment and performance against air quality trigger levels and limits specified in Schedule B - Table 1 (Dust Deposition Trigger Levels and Limits); and (d) a sufficient number of impact monitoring and reference locations, constructed in accordance with Australian Standard 3580.1.1:2007 Methods for the sampling and analysis of ambient air - Guide to siting air monitoring equipment, to enable scientifically justifiable conclusions on the level of impact from mining activity. Schedule B - Table 2 (Air Quality Monitoring Program - Dust Deposition) Monitoring Location Description Coordinates Monitoring Frequency (GDA2020 MGA zone 54) Easting Northing AQ1 South of Lady Clayre 411201 7752961 AQ3 Roseby Homestead 413635 7754700 Monthly AQ7 Village/Access road1 416940 7768915 AQ8 Access road1 416906 7770938 AQ9 Bedford1 415830 7764580 1. Monitoring sites must comply with Australian Standard 3580.1.1:2007 Methods for the sampling and analysis of ambient air - Guide to siting air monitoring equipment.
- B7
Prior to implementation, the dust deposition monitoring program required by condition (B6) must be certified that it meets the requirements of this Environmental Authority by an appropriately qualified person.
- B8
A copy of the dust deposition monitoring program required by condition (B6) must be provided to the administering authority on request. Air Quality - Particulate Matter
- B9
The mining activity must not cause particulate matter to exceed the following levels when measured at any sensitive place or commercial place: a) a concentration of particulate matter with an aerodynamic diameter of less than 10 micrometres (PM10) suspended in the atmosphere of 50 micrograms per cubic metre over a 24-hour averaging time and 25 -g/m3 as an annual average, when monitored in accordance with the most recent version of either: i. Australian standard AS3580.9.8 - Methods for sampling and analysis of ambient air: Determination of suspended particulate matter- PM10 continuous direct mass method using tapered element oscillating microbalance analyser; ii. Australian standard AS3580.9.11 Methods for sampling and analysis of ambient air, Method 9.11: Determination of suspended particulate matter -- PM10 beta attenuation monitors; or iii. An alternate method of monitoring PM10 which complies with the performance specifications detailed in other Australian Standards for PM10 and agreed to in writing by the administering authority. Permit OFFICIAL Environmental Authority EPML00899613 Air Quality Monitoring Program
- B10
At least twelve months prior to the commencement of mining activities at Scanlan and Lady Clayre, the holder of this Environmental Authority must develop and implement an air quality monitoring program for the air quality indicators specified in condition (B3) at the monitoring locations and at the frequency specified in Schedule B - Table 3 (Air Quality Monitoring Program - Particulate Matter) and Schedule J - Plan 2 - Air Quality Monitoring Locations. Schedule B - Table 3 (Air Quality Monitoring Program - Particulate Matter) Monitoring Location Description Coordinates (GDA2020 MGA zone 54) Easting Northing Monitoring Frequency Compliance AQ3 - Roseby Homestead1 413635 7754700 PM10: continuous Reference AQ1 South of Lady Clayre1 411201 7752961 1) Monitoring sites must comply with Australian Standard 3580.1.1:2007 Methods for the sampling and analysis of ambient air - Guide to siting air monitoring equipment. Trigger Action Response Plan (TARP)
- B11
As part of the air quality monitoring program required by condition (B10), the holder of this Environmental Authority must develop a Trigger Action Response Plan (TARP). The TARP must include, but is not limited to: (a) Identification of proactive and reactive trigger levels for PM10 concentrations, including: i. Proactive triggers to identify and mitigate potential air quality impacts before they occur. ii. Reactive triggers to respond to exceedances of PM10 concentration thresholds. (b) A description of the actions to be taken when trigger levels are exceeded, including the alteration, reduction, or cessation of project activities to minimise adverse air quality impacts. (c) Procedures for reviewing and adapting project activities based on air quality monitoring data and the effectiveness of implemented actions. (d) A mechanism for regular review and updating of the TARP to ensure its ongoing effectiveness and alignment with best practice air quality management. (e) How detailed records of air quality monitoring data, trigger exceedances, and actions taken in response to exceedances will be maintained.
- B12
Prior to implementation, the air quality monitoring program required by condition (B10) and the associated TARP required by condition (B11) must be certified that they meet the requirements of this Environmental Authority by an appropriately qualified person.
- B13
For the duration that the air quality monitoring program required by condition (B10) is in effect, the holder of this Environmental Authority must provide by 1 June each year, a report to the administering authority, detailing: (a) Results of the air quality monitoring. (b) Instances of trigger exceedances and the corresponding actions taken. (c) Any updates or amendments made to the air quality monitoring program. Air Quality Monitoring Requirements
- B14
Samples taken for air quality monitoring specified in this Environmental Authority must be collected and analysed in accordance with the requirements of the administering authority's latest edition of the Air Quality Sampling Manual, or more recent editions or supplements to that document as are published by the administering authority, unless otherwise agreed by the administering authority in writing. Permit OFFICIAL Environmental Authority EPML00899613 Concentrate Management
- B15
Storage of mineral concentrate must only occur in defined areas and for the purposes specified in Schedule B - Table 4 (Mineral Concentrate Storage Areas). Schedule B - Table 4 (Mineral Concentrate Storage Areas) Coordinates Name (GDA2020 MGA zone 54) Purpose Easting Northing Storage of mineral concentrate and load out for transport offsite within a fully enclosed shed as Concentrate storage and 411767 7771185 per Condition B16. handling shed Temporary and emergency storage area for mineral concentrate. Footprint 40 x 10 m. Temporary concentrate stockpile 411804 7771204
- B16
Buildings or structures used for the storage, stockpiling and loading of mineral concentrate must incorporate the following dust control measures as a minimum: (a) all necessary openings and vents in the buildings or structures (other than doorways and access ways) must be covered with filter media or other equivalent dust control measures; (b) cladding of the buildings or structures must be securely affixed and free of any unnecessary holes; (c) all doorways and access ways in the buildings or structures must be fitted with doors; (d) all doors in the buildings or structures must remain closed except when being used for access or egress; (e) all doors, doorways and access ways in the buildings or structures must be maintained in such a condition that doors, when closed, provide a seal against the release of mineral concentrate to the receiving environment; (f) transfer of mineral concentrate to vehicles and containers must be carried out in a manner that minimises the likelihood of any release of mineral concentrate to the atmosphere and waters; and (g) transfer of mineral concentrate along conveyor belts must be designed and operated in a manner that prevents the release of mineral concentrate to the atmosphere and waters.
- B17
The interior of all mineral concentrate storage, stockpiling and loading buildings or structures must be maintained under negative air pressure sufficient to prevent release of mineral concentrate from the buildings or structures.
- B18
Condition (B17) does not apply if the holder of this Environmental Authority can demonstrate to the satisfaction of the administering authority that the requirements of condition (B16) achieve an acceptable environmental performance.
- B19
The buildings and structures in place at the licensed place for the storage, stockpiling and loading of mineral concentrate must be constructed and maintained to withstand a Category 2 cyclone.
- B20
The construction and state of the buildings and structures in place at the licensed place for the storage, stockpiling and loading of mineral concentrate must be checked for compliance with condition (B16) by an appropriately qualified person at least once every three (3) years.
- B21
A truck and front end loader wash bay must be installed and maintained as part of the fully enclosed mineral concentrate storage and loading facility for cleaning machinery before exit from the storage and loading facility to prevent the movement of mineral concentrate outside the storage and loading facility. Permit OFFICIAL Environmental Authority EPML00899613 House-keeping Procedure
- B22
A whole of site housekeeping procedure must be developed and implemented which must include, but not be limited to: (a) the completion of periodic inspections of the licensed place including all structures, plant, equipment and trafficked surfaces to identify and remove exposed mineral concentrate that may be mobilised by wind, water or equipment movement; and (b) an ongoing cleaning and maintenance schedule to minimise any potential release of mineral concentrate and to ensure there is no build-up of mineral concentrates over time in areas where it may be mobilised. Weather Station
- B23
The holder of this Environmental Authority must establish and maintain a permanent meteorological station to continuously measure and record wind speed, wind direction, temperature and daily rainfall volume prior to the commencement of mining activities.
- B24
The permanent meteorological station must be installed in accordance with the latest edition of the Bureau of Meteorology guideline Observation specifications No.2013.1 Guidelines for the positioning and exposure of meteorological instruments and observing facilities.
- B25
The holder of this Environmental Authority must record, compile, evaluate and keep all monitoring records obtained from the permanent automatic meteorological station. Point Source Releases to Air
- B26
Point source emissions of contaminants to air must: (a) only occur from the release points specified in Schedule B Table 5 - Release points (air); and (b) comply with the Minimum Exit Gas Temperature specified in Schedule B Table 5 - Release points (air); and (c) comply with the Minimum Release Height specified in Schedule B Table 5 - Release points (air); and (d) comply with the Minimum Efflux Velocity specified in Schedule B Table 5 - Release points (air). Schedule B - Table 5 - Release points (air) Release Description Locations Source description Minimum Minimum exit Minimum point (power release gas efflux Easting Northing height generation (GDA2020 (GDA2020 temperature velocity unit) MGA z54) MGA z54) (m)1 (oC)1 (m/s)1,2 Power plant infrastructure area Diesel Up to 75 generator units RP1 thermal 411408 7770738 for a total production of 3.2 479 59 (Air) power 75MW of electricity station 1 - Minimum release height (m), Minimum exit gas temperature (-C) and Minimum efflux velocity (m/s) must be measured for each power generation unit. 2 - Minimum exit gas temperature (-C), based on preliminary calculations.
- B27
Point source emissions of contaminants to air must not exceed the contaminant release limits specified in Schedule B Table 6 - Contaminant limits (air). Schedule B Table 6 - Contaminant limits (air) Contaminant Release point g/kWh Minimum monitoring frequency1 CO RP1 3.52 All release points must be monitored during NOx RP1 0.672 commissioning of the generators and once per 0.032 year thereafter. PM RP1 1. Within 3 months of commencing operation of the generators listed in Schedule B - Table 5 - Release points (air), the Environmental Authority holder must conduct air emission monitoring to demonstrate compliance with air emission limits listed in Schedule B Table 6 - Contaminant limits (air). 2. Based on best practice standards, US and EU emission standards for non-road diesel engines, and emissions standards specific to generator sets where they exist and recommended by the National Clean Air Agreement. Permit OFFICIAL Environmental Authority EPML00899613
- B28
An appropriately qualified person(s) must conduct and keep records of a monitoring program of contaminant releases to the atmosphere at the release points, frequency and for the contaminants specified in Schedule B Table 6 - Contaminant limits (air) and which complies with the most recent edition of AS4323.1 Stationary source emissions method 1: Selection of sampling positions, and the most recent edition of the administering authority's air quality sampling manual. END OF CONDITIONS FOR SCHEDULE B Permit OFFICIAL Environmental Authority EPML00899613 SCHEDULE C - LAND AND REHABILITATION General
- C1
Unless authorised by this Environmental Authority, contaminants that will or may cause environmental harm must not be directly or indirectly released to land.
- C2
Any spillage of wastes, contaminants or other materials must be cleaned up promptly. Such spillages must be cleaned up using methods that minimise the impact of the release of wastes, contaminants or materials to land, except where the relevant Material Safety Data Sheets (MSDS) specify otherwise. Rehabilitation Objectives
- C3
Land disturbed by the mining activity must be rehabilitated in accordance with Schedule C - Table 1 (Rehabilitation Requirements). Schedule C - Table 1 (Rehabilitation Requirements) Mine Domain Mine Feature Rehabilitation Goal Rehabilitation Objectives Mining Area Little Eva Pit Residual void with no post mining use Turkey Creek Pit Waste Rock Dump Safe, stable, non-polluting and self- Native vegetation and habitat sustaining. Processing area Bedford North Pit Residual void with no post mining use ROM and ore Bedford South Pit Residual void with no post mining use stockpile Lady Clayre Pits (four pits) Residual void with no post mining use Blackard Pit Residual void with no post mining use Dams and water management Scanlan Pit Safe, stable, non-polluting and self- infrastructure Native vegetation and habitat sustaining Little Eva WRD Native vegetation and habitat Safe, stable, non-polluting and self- Bedford North WRD Low intensity grazing sustaining Bedford South WRD Low intensity grazing Lady Clayre WRD Low intensity grazing Safe, stable, non-polluting and self- Blackard West WRD sustaining Blackard South WRD Scanlan WRD Safe, stable, non-polluting and self- Process Plant infrastructure sustaining area Mine infrastructure area Safe, stable, non-polluting and self- Power plant infrastructure sustaining area ROM stockpile Little Eva and Turkey Creek LGO stockpile Blackard ROM stockpile Blackard LGO stockpile Scanlan and Lady Clayre ROM stockpile Clean water and MAW drains Northern MAW Dam Blackard Northern MAW Dam Blackard Southern MAW Dam Tailings Storage Facility MAW Dam Permit OFFICIAL Environmental Authority EPML00899613 Mine Domain Mine Feature Rehabilitation Goal Rehabilitation Objectives Ancillary Bedford MAW Dam Waste Encapsulation Facility Safe, stable, non-polluting and self- Infrastructure Scanlan MAW Dam with native grassland sustaining Surface Water Lady Clayre MAW Dam Low intensity grazing Diversion Southern ROM Pad MAW Safe, stable, non-polluting and self- Levees Dam Native vegetation and habitat sustaining Bunds Process Water Pond Native vegetation and habitat Borrow pits Raw Water Pond Native vegetation and habitat Safe, stable, non-polluting and self- Site Runoff Pond Low intensity grazing sustaining South-east basin Safe, stable, non-polluting and self- North-east basin sustaining Blackard Western Clean Safe, stable, non-polluting and self- Water Dam sustaining Northern MAW Dam Turkeys Safe, stable, non-polluting and self- Nest sustaining Turkey Creek Pit Turkeys Nest Turkeys Nest 2 (Core Fam) Turkeys Nest 3 (TSF) Tailings Storage Facility (TSF) Powerlines Access and haul roads Magazine and Explosives storage facility Integrated waste management and landfill facility Accommodation Village Sewage Treatment Plant STP disposal area 1 STP disposal area 2 Cabbage Tree Creek, Blackard Creek and unnamed tributary of Blackard Creek Diversions and buffer land Scanlan Pit unnamed tributary diversion Little Eva Pit Levee and buffer land Scanlan Pit Levee Lady Clayre Pit Levee Turkey Creek Bund Blackard Bund 1 Blackard Bund 2 Concrete aggregate borrow pit area Construction material borrow pit area Clay material borrow pit area (North) Clay material borrow pit area (South) Permit OFFICIAL Environmental Authority EPML00899613 Mine Domain Mine Feature Rehabilitation Goal Rehabilitation Objectives Laydown areas Safe, stable, non-polluting and self- Tailings Storage Facility and Low intensity grazing sustaining Topsoil Stockpiles Process Plant Laydown Low intensity grazing Little Eva Laydown Safe, stable, non-polluting and self- Exploration Little Eva Access Laydown sustaining Borefields Turkey Creek Laydown (Production bores) Bedford Laydown Safe, stable, non-polluting and self- Little Eva and Turkey Creek sustaining Pit mining area Safe, stable, non-polluting and self- Mine Access Road sustaining Blackard Pit mining area Bedford Pit mining area Scanlan Pit mining area Lady Clayre Pit mining area Tailings Storage Facility area Solar farm area Clay borrow pit area Ancillary infrastructure area Exploration Low intensity grazing Northern borefield Low intensity grazing Graben borefield
- C4
Rehabilitation must commence progressively as areas become available.
- C5
Within four years after the commencement of mining activities, the holder of this Environmental Authority must commence trials to establish suitable capping systems for infrastructure on the licensed place including but not limited to the tailings storage facility and all waste rock dumps.
- C6
Within six years after the commencement of mining activities, and once every two (2) years thereafter the Environmental Authority holder must submit a report to the administering authority detailing the success and findings from the capping system trials.
- C7
Within seven years after the commencement of mining activities, the Environmental Authority holder must submit to the administering authority a report nominating the most appropriate capping system based on results from trials required in condition (C5). Permit OFFICIAL Environmental Authority EPML00899613 Topsoil
- C8
Topsoil and subsoils must be stripped and stockpiled ahead of the areas proposed to be disturbed for the mining activity to a depth determined from soil surveys to ensure that useable soil resources are preserved for rehabilitation.
- C9
Topsoil and subsoil stockpiles must be managed to ensure stability and minimise the release of contaminants. Measures must include: (a) vegetating permanent stockpiles1; (b) stockpiles will not exceed 3 m in height, (c) stockpiles will not be located within 40 m of any watercourse to minimise the risks from erosion and sedimentation, and; (d) stockpiles will be re-used as soon as possible. NOTE: 1Permanent stockpiles are those remaining the licensed place for more than six months. The Environmental Authority holder must maintain records of stockpile durations.
- C10
A topsoil inventory which identifies the topsoil requirements for the mining activity and availability of suitable topsoil on the licensed place must be kept and made available to the administering authority on request. Rehabilitation Monitoring Program
- C11
A rehabilitation monitoring program must be implemented by an appropriately qualified person upon commencement of rehabilitation identified in Schedule C - Table 1 (Rehabilitation Requirements).
- C12
The holder of this Environmental Authority must conduct rehabilitation monitoring in accordance with the program developed in condition (C11) at least once a year including sufficient spatial and temporal replication to enable scientifically justifiable conclusions to be made, as established in the rehabilitation monitoring program.
- C13
Verification of rehabilitation success is to be carried out for each domain. Monitoring must be carried out for each domain at a minimum sampling intensity of 1:15,000 and must include sufficient replication to enable statistical analysis of results at an acceptable power as established in the rehabilitation monitoring program. Infrastructure
- C14
All buildings, structures, mining equipment and plant erected and/or used for the mining activity must be removed from the licensed place prior to surrender, except where agreed to in writing by the administering authority and the landowner. Chemicals and Flammable or Combustible Liquids
- C15
All explosives, hazardous chemicals, corrosive substances, toxic substances, gases, flammable or combustible liquids and dangerous goods must be stored and handled in accordance with the current, relevant Australian Standard where such is applicable.
- C16
Notwithstanding the requirements of any applicable Australian Standard, any liquids stored on the licensed place that have the potential to cause environmental harm must be stored in and serviced by an effective containment system that is impervious to the materials stored and managed to prevent the release of liquids to waters or land.
- C17
Where no relevant Australian Standard is available, the following must be applied: (a) storage tanks must be bunded such that the capacity and construction of the bund is sufficient to contain at least 110% of a single storage tank or 100% of the largest storage tank plus 10% of the second largest storage tank in multiple storage areas; and (b) drum storages must be bunded such that the capacity and construction of the bund is sufficient to contain at least 25% of the maximum design storage volume within the bund. Permit OFFICIAL Environmental Authority EPML00899613
- C18
All containment systems must be designed to minimise rainfall collection within the system. Contaminated Land
- C19
Prior to making an application for surrender or approval for progressive rehabilitation the holder of this Environmental Authority must undertake a contaminated land assessment/investigation of the relevant areas of the licensed place in accordance with the administering authority's Guideline for the Assessment and Management of Contaminated Land in Queensland. Disturbance to Land
- C20
The holder of this Environmental Authority must conduct a field assessment of flora and fauna prior to the commencement of vegetation clearing.
- C21
When carrying out the mining activity the holder of this Environmental Authority must: (a) avoid, minimise or mitigate (in order of preference) any impacts on areas of sensitive vegetation or other areas of ecological value; (b) minimise the risk of injury, harm, or entrapment to wildlife and stock; (c) minimise disturbance to land that may otherwise result in land degradation; (d) prior to carrying out any disturbance activities, make all relevant staff, contractors or agents carrying out those activities, aware of the location of any Category A, B or C Environmentally Sensitive Area (ESA) and the relevant requirements of this Environmental Authority; (e) if significant disturbance to land is unavoidable, the holder of this Environmental Authority must clear native vegetation in a way which minimises fragmentation; and (f) manage cleared native vegetation so that it is stockpiled in a manner that facilitates salvage, and respreading does not impede vehicle, stock or wildlife movements.
- C22
A qualified spotter/catcher is to be engaged to work ahead of site clearing works at the commencement of vegetation clearing to ensure the protection of species that may be of conservation significance. Note: This Environmental Authority does not authorise the taking of protected animals or the tampering with an animal breeding place that is being used by a protected animal to incubate or rear the animal's offspring.
- C23
In the event of identification of rare or threatened species on the licensed place, a diagrammatic representation of the species occurrence relative to the mining activity together with a management and monitoring strategy for species conservation must be prepared to the satisfaction of the administering authority and submitted once every five (5) years. Residual Void Outcome
- C24
Residual voids must not cause any environmental harm to land, surface waters or groundwater aquifer, other than the environmental harm constituted by the existence of the residual void itself, and subject to any other condition within this Environmental Authority. Purple-necked Rock-wallaby Monitoring Program (Petrogale purpureicollis)
- C25
Prior to the commencement of mining activities, a purple-necked rock-wallaby monitoring program must be developed and implemented. The monitoring program must: (a) monitor and record the effects of the mining activity on the purple-necked rock wallaby population; and (b) be conducted at a frequency determined by an appropriately qualified person at intervals of not more than twelve (12) months.
- C26
In the event that the monitoring program required by condition (C25) shows a significant decline in the purple- necked rock-wallaby population, the holder of this Environmental Authority must: (a) complete an investigation into the potential cause of the decline; and (b) provide an investigation report to the administering authority within two (2) months of becoming aware of the decline. Permit OFFICIAL Environmental Authority EPML00899613
- C27
A summary report detailing the results of the purple-necked rock-wallaby monitoring program carried out in accordance with condition (C25) must be provided to the administering authority at intervals of not more than three (3) years. Groundwater Dependent Ecosystem (GDE) and Drawdown Monitoring
- C28
Prior to the commencement of mining activities, the holder of this Environmental Authority must develop a Groundwater Dependent Ecosystem (GDE) Monitoring Program.
- C29
The GDE Monitoring Program must include, but is not limited to, the following: (a) Establish up to date baseline environmental conditions for each area including Regional Ecosystems, groundwater depths and seasonal fluctuations in groundwater levels, estimated root depth/root zone water uptake, as well as causal pathways for each assessment site (b) Define monitoring locations and parameters, including the number and spatial distribution of monitoring sites, to ensure representative coverage of all identified GDEs. (c) Include a trigger action response plan that defines specific trigger levels for groundwater and environmental parameters (e.g., groundwater drawdown thresholds, vegetation health indicators). (d) Specify clear and measurable actions to be taken when trigger levels are exceeded, including mitigation measures, reporting requirements, and timelines for implementation. (e) Establish reporting protocols, including the frequency and format of reporting to the administering authority. Reports must include monitoring data, analysis of trends, identification of any trigger exceedances, and actions taken in response to exceedances. (f) Provisions for regular review and adaptation of the GDE Monitoring Program to ensure its ongoing effectiveness and alignment with best practice environmental management. NOTE: The approved GDE Monitoring Program must be implemented for the life of the mine.
- C30
The holder of this Environmental Authority must: a) complete exploration drilling at a minimum of three locations in the western graben near Leichhardt River by 30 June 2027 to validate hydrostratigraphic unit extents and depth to groundwater; b) if a water table aquifer (AQ1) is confirmed, install a shallow monitoring bore near mapped GDEs of Pinnacle Creek and Leichhardt River within 6 months of confirmation; c) incorporate drilling results into the numerical groundwater model update within 12 months of data collection; d) Incorporate observed streamflow data obtained at the licensed place into the numerical groundwater model update required by c); and e) Include information for mapped GDEs along Pinnacle Creek and near Leichhardt River in the GDE Monitoring Program required under condition C28.
- C31
Prior to commencement of pit dewatering at Little Eva, the holder of this Environmental Authority must: a) complete the hydrogeological or geotechnical investigation of the Little Eva pit western wall to evaluate the Coolullah Fault as a hydraulic barrier and submit the final investigation report to the administering authority; and b) install cross-fault monitoring bores (minimum one bore on each side of the fault within 500 m of the fault trace) to monitor water levels and water quality Impacts to Prescribed Environmental Matters
- C32
Significant residual impacts to prescribed environmental matters, are not authorised under this Environmental Authority or the Environmental Offsets Act 2014 unless the impact(s) is specified in Schedule C - Table 2 (Significant residual impacts to prescribed environmental matters) and all information required for Schedule C - Table 2 (Significant residual impacts to prescribed environmental matters) has been provided to the administering authority. Permit OFFICIAL Environmental Authority EPML00899613 Schedule C - Table 2 (Significant residual impacts to prescribed environmental matters) Prescribed Stage Regional Location of impact Maximum environmental Ecosystem Coordinates* extent of Impact matter (RE) identified (GDA2020 MGA zone 54) (hectares) Easting Northing 0.63 49.70 1 (Early Works) 1.3.7 414568 7769896 0.59 2 (Cabbage Tree 1.3.7 409909 7771851 Creek, Blackard 1.3.13 78.61 creek and unnamed 1.5.4 410230 7774515 tributary of Blackard 411130 7774344 38.18 Creek Diversions 412112 7773911 plus Little Eva Pit 413135 7772749 0.00 Levee incl. buffer 413501 7769324 66.81 412067 7770842 lands) 412472 7769789 412028 7771024 3 (Solar farm and 1.3.7 410407 7772752 access and powerline 1.3.13 413678 7769979 411987 7771258 easement) 414383 7769219 413615 7770153 Regional 4 (Various 1.11.2a 410044 7772770 ecosystems (not Infrastructure - 1.11.3a 410304 7772619 within an urban Northern Leases) 1.3.13 411869 7770610 area) within the 1.3.7b defined distance 1.3.7a from the defining banks of a relevant 1.11.2a watercourse on the 1.11.3a 1.11.3a/1.11.2a vegetation 1.3.13 management 1.3.13a watercourse map. 1.3.7a 5 (Various Infrastructure - Northern Leases - Amended Project footprint) 1.3.7b 1.5.4d 410241 7772436 6 (Clay material 1.11.2a No impacts 7766034 borrow pit area 1.11.3a/1.11.2a 7764443 411376 (North)) 412519 7 (Blackard) Permit OFFICIAL Environmental Authority EPML00899613 1.11.3a/1.5.15 412792 7761578 1.3.13a 412571 7764522 1.3.6a 411160 7766255 1.3.7b 412667 7764591 411656 7757094 8 (Southern Pits) 1.11.3a 414052 7764688 27.19 1.11.3a/1.11.2a 412417 7756359 1.11.3a/1.5.15 413483 7762294 0.00 412491 7753939 4.34 1.3.13a 413681 7760712 0.00 1.3.7a 411977 7753859 1.3.7b 0.55 1.5.4d No impacts 7771186 3.17 415735 15.57 9 (Clay material 7772186 0.00 No impacts 7771551 borrow pit area 7771330 413266 7771249 (South)) 413357 7769796 413389 7769012 1 (Early Works) N/A 413418 7771880 2 (Cabbage Tree 413445 414054 Creek, Blackard 413301 creek and unnamed No impacts tributary of Blackard Creek Diversions plus Little Eva Pit Levee incl. buffer lands) 3 (Solar farm and Habitat for animal that are vulnerable access and powerline N/A wildlife - Purple- easement) necked Rock- wallaby (Petrogale purpureicollis) 4 (Various Infrastructure - N/A Northern Leases) 5 (Various Infrastructure - Northern Leases - N/A Amended Project footprint) 6 (Clay material borrow pit area (North)) Permit OFFICIAL Environmental Authority EPML00899613 7 (Blackard) N/A 412458 7763751 4.03 410862 7756968 16.07 8 (Southern Pits) N/A 9 (Clay material borrow pit area No impacts (South)) 1 (Early Works) No impacts 2 (Cabbage Tree Creek, Blackard creek and unnamed tributary of Blackard No impacts Creek Diversions plus Little Eva Pit Levee incl. buffer lands) 3 (Solar farm and access and powerline No impacts easement) N/A 411252 7772560 1.75 4 (Various Infrastructure - N/A 411181 7770639 0.56 Northern Leases) N/A 412044 7769544 1.37 Waterways 5 (Various providing for fish Infrastructure - Northern Leases - passage No impacts Amended Project footprint) 6 (Clay material borrow pit area No impacts (North)) N/A 410971 7766549 0.57 7 (Blackard) N/A 412583 7764981 0.82 N/A 413165 7764557 0.89 N/A 415696 7766801 0.15 8 (Southern Pits) 412549 7755385 0.09 N/A 9 (Clay material No impacts borrow pit area (South))
- C33
Records demonstrating that each impact to a prescribed environmental matter not listed in Schedule C - Table 2 (Significant residual impacts to prescribed environmental matters) did not, or is not likely to, result in a significant residual impact to that matter must be: (a) completed by an appropriately qualified person; and (b) kept for the life of the Environmental Authority. Permit OFFICIAL Environmental Authority EPML00899613
- C34
An environmental offset made in accordance with the Environmental Offsets Act 2014 and Queensland Environmental Offsets Policy, as amended from time to time, must be undertaken for the maximum extent of impact to each prescribed environmental matter (as per staging requirements) authorised in Schedule C - Table 2 (Significant residual impacts to prescribed environmental matters), unless a lesser extent of the impact has been approved in accordance with condition C38.
- C35
The significant residual impacts to a prescribed environmental matter authorised in condition C32 for which an environmental offset is required by condition C34 may be carried out in stages. An environmental offset can be delivered for each stage of the impacts to prescribed environmental matters.
- C36
Prior to the commencement of each stage, a report completed by an appropriately qualified person, that includes an analysis of the following must be provided to the administering authority: (a) for the forthcoming stage--the estimated significant residual impacts to each prescribed environmental matter; and (b) for the previous stage, if applicable--the actual significant residual impacts to each prescribed environmental matter, to date.
- C37
Within six months from the completion of the final stage of the project, a report completed by an appropriately qualified person, that includes the following matters must be provided to the administering authority: (a) an analysis of the actual impacts on prescribed environmental matters resulting from the final stage; and (b) if applicable, a notice of election to address any outstanding offset debits for the authorised impacts.
- C38
The report required by condition C36 must be approved by the administering authority before the notice of election for the forthcoming stage, if applicable, is given to the administering authority.
- C39
The notice of election for the staged environmental offset referred to in condition C38, if applicable, must be provided to the administering authority no less than three months before the proposed commencement of that stage, unless a lesser timeframe has been agreed to by the administering authority.
- C40
A Fish Salvage Plan must be prepared by an appropriately qualified person and implemented for any disturbance to waterways associated with activities approved under this Environmental Authority that result in fish becoming trapped. The plan must specify and detail measures to minimise harm to fish who become stranded or trapped, including during unseasonal rain events.
- C41
The holder of the Environmental Authority must keep records of all fish salvage activities. These records must include, at a minimum: (a) The date and location of the fish salvage activities; (b) The methods and equipment used for fish salvage; (c) The species and number of fish salvaged; and (d) The outcomes of the fish salvage activities, including any corrective actions taken. END OF CONDITIONS FOR SCHEDULE C Permit OFFICIAL Environmental Authority EPML00899613 SCHEDULE D - STRUCTURES Assessment of Consequence Category
- D1
The consequence category of any structure must be assessed by a suitably qualified and experienced person in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of (a) prior to the design and construction of the structure, if it is not an existing structure; or (b) prior to any change in its purpose or the nature of its stored contents.
- D2
A consequence assessment report and certification must be prepared for structures which are subject to the requirements of the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures
- D3
Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for Assessing Consequence Categories and Hydraulic Design and Construction of a Regulated Structure
- D4
All regulated structures must be designed by, and constructed under the supervision of, a suitably qualified and experienced person in accordance with the requirements of the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (ERS/2016/1933). Note: Certification of design and construction may be undertaken by different persons. Construction of a structure includes modification of an existing structure.
- D5
Construction of a regulated structure is prohibited unless the holder of this Environmental Authority has: (a) submitted a consequence category assessment report and certification to the administering authority; (b) received the certification from a suitably qualified and experienced person for the design plan and the associated operating procedures in compliance with the relevant conditions of this Environmental Authority.
- D6
Certification for the design plan must be provided by the suitably qualified and experienced person who oversees the preparation of the design plan, in the form set out in the Manual for Assessing Consequence
- D7
Regulated structures must: (a) be designed and constructed in accordance with and conform to the requirements of the Manual for (b) be designed and constructed with due consideration given to ensuring that the design integrity will not be compromised on account of: (i) floodwaters entering the regulated dam from any watercourse or drainage line; and (ii) wall failure due to erosion by floodwaters arising from any watercourse or drainage line. (c) have the floor and sides of the dam designed and constructed to prevent or minimise the passage of the wetting front and any entrained contaminants through either the floor or sides of the dam during the operational life of the dam and for any period of decommissioning and rehabilitation of the dam. Permit OFFICIAL Environmental Authority EPML00899613
- D8
The design plan for a regulated structure must include, but is not limited to: (a) certification that the design plan: (i) is in accordance with the Manual for Assessing Consequence Categories and Hydraulic (ii) addresses the requirements in condition (D8) (b) to (h). (b) a design report which provides: (i) a description of all the documents which constitute the design plan; (ii) a statement of: i the applicable standards including engineering criteria, industry guidelines, relevant legislation and regulatory documents, relied upon in preparing the design plan; ii all relevant facts and data used in preparing the design plan, including any efforts made to obtain necessary facts and data, and any limitations or assumptions to facts and data used in preparing the design plan; iii the consequence category of the regulated structure; and iv setting out the reasoning of the suitably qualified and experienced person who has certified the design plan, as to how the design plan provides the necessary required performance. (iii) documentation of hydrological analyses and estimates required to determine all elements of the design including volumes and flow capacities; (iv) detailed criteria for the design, operation, maintenance and decommissioning of the regulated structure, including any assumptions; and (v) design, specification and operational rules for any related structures and systems used to prevent failure scenarios; (c) drawings showing the lines and dimensions, and locations of built structures and land forms associated with the regulated structure; (d) consideration of the interaction of the pit design with the levee or regulated structure design; (e) an operational plan that includes: (i) normal operating procedures and rules (including clear documentation and definition of process inputs in the Design Storage Allowance (DSA); and (ii) contingency and emergency action plans including operating procedures designed to avoid and/or minimise environmental impacts including threats to human life resulting from any overtopping or loss of structural integrity of the regulated structure. (f) a plan for the decommissioning and rehabilitation of the regulated structure at the end of its operational life; (g) details of reports on investigations and studies done in support of the design plan; and (h) any other matter required by the suitably qualified and experienced person.
- D9
Certification by the suitably qualified and experienced person who supervises the construction must be submitted to the administering authority on the completion of construction of the regulated structure, and state that: (a) the 'as constructed' drawings and specifications meet the original intent of the design plan for that regulated structure; and (b) construction of the regulated structure is in accordance with the design plan.
- D10
The Tailings Storage Facility design and construction must include a base layer with a low permeability liner that is equal to or less than 1 x 10-9 m/s. Notification of affected persons
- D11
All affected persons must be provided with a copy of the emergency action plan in place for each regulated structure: (a) prior to the operation of the new regulated structure; (b) if the emergency plan is amended, within 5 business days of it being amended. Permit OFFICIAL Environmental Authority EPML00899613 Operation of a Regulated Structure
- D12
Operation of a regulated structure is prohibited unless: (a) the holder of this Environmental Authority has submitted to the administering authority: (i) either one paper copy or one electronic copy of the design plan and certification of the design plan in accordance with condition (D8); (ii) a set of `as constructed' drawings and specifications; and (iii) certification of those `as constructed drawings and specifications' in accordance with condition (D9). (b) the requirements of this Environmental Authority relating to the construction of the regulated structure have been met; and (c) relevant details for the regulated structures have been included in Schedule D - Table 1 (Hydraulic Performance of Regulated Structures) or Schedule D - Table 2 (Hydraulic Performance of Regulated Levees), and into the Register of Regulated Structures required by condition (D31); and (d) there is a current operational plan for the regulated structure.
- D13
Each regulated structure must be maintained and operated in a manner that is consistent with the current design plan, the current operational plan, and the associated certified `as constructed' drawings for the duration of its operational life until decommissioned and rehabilitated.
- D14
The holder of this Environmental Authority must take reasonable and practicable measures to prevent harm to persons, livestock or wildlife through the construction and operation of a regulated structure. Reasonable and practicable measures may include, but are not limited to: (a) the secure use of fencing, bunding or screening; and (b) escape arrangements for trapped livestock and fauna. Mandatory Reporting Level
- D15
The mandatory reporting level (MRL) must be marked on a regulated dam in such a way that during routine inspections of that structure, it is clearly observable.
- D16
The holder of this Environmental Authority must, as soon as practical and within forty-eight (48) hours of becoming aware, notify the administering authority when the level of the contents of a regulated dam reaches the MRL.
- D17
The holder of this Environmental Authority must, immediately on becoming aware that the MRL has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated dam.
- D18
The Environmental Authority holder must record any changes to the MRL in the Register of Regulated Structures. Design Storage Allowance
- D19
The Environmental Authority holder must assess the performance of each regulated dam over the preceding November to May period based on actual observations of the available storage in each regulated dam taken prior to 1 July each year.
- D20
On 1 November of each year, storage capacity must be available in each regulated dam or with the interconnected dams functioning as an integrated containment system, to meet the DSA volume for the dam.
- D21
The holder of this Environmental Authority must, as soon as possible and within forty-eight (48) hours of becoming aware that the regulated structure will not have the available storage to meet the DSA volume on 1 November of any year, notify the administering authority. Permit OFFICIAL Environmental Authority EPML00899613
- D22
The holder of this Environmental Authority must, immediately on becoming aware that a regulated dam will not have the available storage to meet the DSA volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated structure or linked containment systems. Annual Inspection Report
- D23
Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person.
- D24
At each annual inspection, the condition and adequacy of all components of the regulated structure must be assessed and a suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and recommendations, if applicable, to ensure the integrity of the regulated structures. (a) against recommendations contained in previous annual inspection reports; (b) against recognised dam safety deficiency indicators; (c) for changes in circumstances potentially leading to a change in consequence category; (d) for conformance with the conditions of this Environmental Authority; (e) for conformance with the `as constructed' drawings; (f) for the adequacy of the available storage in each regulated structure, based on an actual observation or observations taken after 31 May each year but prior to 1 November of that year, of accumulated sediment, state of the containment barrier and the level of liquids in the regulated structure (or network of linked containment systems); and (g) for evidence of conformance with the current operational plan.
- D25
The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of
- D26
The holder of this Environmental Authority must within 20 business days of the receipt of the annual inspection report, provide to the administering authority: (a) the recommendations section of the annual inspection report; and (b) if applicable, any actions being taken in response to those recommendations.
- D27
A copy of the annual inspection report must be provided to the administering authority upon request within ten (10) business days of receipt of the request. Transfer Arrangements
- D28
The holder of this Environmental Authority must provide a copy of any reports, documentation and certifications prepared under this Environmental Authority, including but not limited to any Register of Regulated Structures, consequence assessment, design plan and other supporting documentation, to a new holder of this Environmental Authority. Decommissioning and Rehabilitation
- D29
Regulated structures must not be abandoned. They must be either: (a) decommissioned and rehabilitated to achieve compliance with condition (D30); or (b) be left in situ for use by the landholder provided that: (i) it no longer contains contaminants that will migrate into the environment; and (ii) it contains water of a quality that is demonstrated to be suitable for its intended use(s); and (c) the Environmental Authority holder and the landholder agree in writing that the: (i) dam will be used by the landholder following the cessation of the environmentally relevant activity(ies); and (ii) landholder is responsible for the dam, and from an agreed date. Permit OFFICIAL Environmental Authority EPML00899613
- D30
Before surrendering this environmental authority, each regulated structure must be decommissioned and rehabilitated to achieve a safe, stable, non-polluting landform. Register of Regulated Structures
- D31
A Register of Regulated Structures must be established and maintained by the holder for each regulated structure. Note: Schedule I - Definitions defines a Register of Regulated Structures and specifies information that must be included.
- D32
The holder must provisionally enter the required information in the Register of Regulated Structures when a design plan for a regulated dam is submitted to the administering authority.
- D33
The holder must make a final entry of the required information in the Register of Regulated Structures once compliance with condition (D12) and (D13) has been achieved.
- D34
The holder must ensure that the information contained in the Register of Regulated Structures is current and complete on any given day.
- D35
All entries in the Register of Regulated Structures must be approved by the chief executive officer for the holder of this authority, or their delegate, as being accurate and correct.
- D36
The holder must, at the same time as providing the annual return, supply to the administering authority a copy of the records contained in the Register of Regulated Structures. Hydraulic performance of regulated structures
- D37
An assessment and accompanying report certified by a suitably qualified and experienced person must be undertaken and documented in accordance with the Manual for Assessing Consequence Categories and Schedule D - Table 1 (Hydraulic Performance of Regulated Structures) and Schedule D - Table 2 (Hydraulic Performance of Regulated Levees).
- D38
The assessment report that achieves condition (D37) for regulated structures must: (a) certify that all regulated structures comply with the Manual for Assessing Consequence Categories (b) be submitted to the administering authority at least two (2) months before commencing construction of the relevant regulated structure/s listed in Schedule D - Table 1 (Hydraulic Performance of Regulated Structures) and Schedule D - Table 2 (Hydraulic Performance of Regulated Levees). NOTE: In accordance with Condition (D2), the report may include an assessment for more than one structure.
- D39
Each regulated structure specified in Schedule D - Table 1 (Hydraulic Performance of Regulated Structures) must meet the hydraulic performance criteria listed in Schedule D - Table 1 (Hydraulic Performance of Regulated Structures) for that structure. Permit OFFICIAL Environmental Authority EPML00899613 Schedule D - Table 1 (Hydraulic Performance of Regulated Structures) Name of Consequence Spillway Design Storage Allowance Mandatory Reporting Level Purpose of Regulated Category Capacity Design Criteria Design Criteria structure Structure Design Criteria Tailings High 1:1000 AEP 1:100 AEP 1-in-100 year AEP 72 hours rainfall Storage of Storage To duration or 1 in 100 wind wave run- tailings Facility 1:100 000 up AEP TSF MAW To be provided to the administering authority two (2) months prior to the commencement of construction of the Storage of Dam structure mine affected water Bedford MAW Significant 1 in 100 AEP 1 in 20 AEP 1-in-10 AEP 72 hours rainfall Storage of Dam to 1 in 1,000 duration or 1 in 10 wind wave run- mine AEP up affected water Scanlan MAW Significant 1 in 100 AEP To be provided to the administering To be provided to the administering Storage of Dam to 1 in 1,000 authority two (2) months prior to the authority two (2) months prior to the mine AEP commencement of construction of commencement of construction of affected the structure the structure water Southern Significant 1 in 100 AEP To be provided to the administering To be provided to the administering Storage of ROM MAW to 1 in 1,000 authority two (2) months prior to the authority two (2) months prior to the mine AEP commencement of construction of commencement of construction of Dam affected the structure the structure water Lady Clayre Significant 1 in 100 AEP To be provided to the administering To be provided to the administering Storage of MAW Dam to 1 in 1,000 authority two (2) months prior to the authority two (2) months prior to the mine AEP commencement of construction of commencement of construction of affected the structure the structure water
- D40
Each levee specified in Schedule D - Table 2 (Hydraulic Performance of Regulated Levees) must have its consequence category assessed in accordance condition D1 and meet the hydraulic performance criteria listed in Schedule D - Table 2 (Hydraulic Performance of Regulated Levees) for that levee. Schedule D -- Table 2 (Hydraulic Performance of Regulated Levees) Name of Consequence Design Criteria for Design Flood Level Use of Levee Regulated (mAHD) Category Flood Level Flood protection for Little Eva Pit Levee Flood protection for Scanlan Pit Flood protection for Lady Clayre Pit Little Eva Pit 1 in 1000 AEP and Varies along levee and Levee Low appropriate ranges between 162 mRL freeboard and 166.5 mRL Scanlan Pit To be provided to the administering authority two (2) months prior to Levee the commencement of construction of the structure Lady Clayre Pit To be provided to the administering authority two (2) months prior to Levee the commencement of construction of the structure Permit OFFICIAL Environmental Authority EPML00899613 Permanent watercourse diversions
- D41
Permanent watercourse diversions, or the re-establishment of a pre-existing watercourse where a temporary watercourse diversion is being replaced, must be designed and constructed to: (a) incorporate natural features (including geomorphic and vegetation) present at the location of the diversion; (b) maintain the pre-existing hydrologic characteristics of surface water and groundwater systems for the area in which the watercourse diversion is located; (c) maintain the hydraulic characteristics of the permanent watercourse diversion that are equivalent to other local watercourses and are suitable for the area in which the diversion is located without using artificial structures that require on-going maintenance; (d) maintain sediment transport and water quality regimes that allow the diversion to be self-sustaining, while minimising any impacts to upstream and downstream water quality, geomorphology or vegetation; and (e) maintain equilibrium and functionality in all substrate conditions at the location of the diversion.
- D42
Permanent watercourse diversions must be designed and constructed in accordance with the Guideline Works that interfere with water in a watercourse for a resource activity - watercourse diversions authorised under the Water Act 2000 (OSW/2019/4599). Design plan
- D43
A certified Design Plan that achieves condition (D41) for permanent watercourse diversions must be submitted to the administering authority at least two (2) months before commencing construction of the diversion. The certified Design Plan must include a functional design report, certified in accordance with the Guideline Works that interfere with water in a watercourse for a resource activity - watercourse diversions authorised under the Water Act 2000 (OSW/2019/4599).
- D44
The certified design plan for any permanent watercourse diversion must be consistent with the functional design/s that formed a part of the application documents for this authority. Construction and operation
- D45
A certified set of `as constructed' drawings and specifications must be submitted to the administering authority within ninety (90) business days from the completion of construction of the permanent watercourse diversion, or re-establishment of the pre-existing watercourse. These drawings and specifications must state: (a) that the 'as constructed' drawings and specifications meet the original intent of the design plan for the watercourse diversion; and (b) construction of the watercourse diversion is in accordance with the design plan. Register
- D46
The details of watercourse diversions planned and constructed under an environmental authority must be accurately recorded on the Register of Watercourse Diversions kept by the holder of the authority. An electronic copy must be provided to the administering authority on request. END OF CONDITIONS FOR SCHEDULE D Permit OFFICIAL Environmental Authority EPML00899613 SCHEDULE E - WASTE Non-Mineral Waste Management Program
- E1
A waste management program must be developed, implemented and maintained for the mining activity at the licensed place. The waste management program must be regularly reviewed and updated at intervals of no greater than five years. The program must include: (a) a description of the mining activity that may generate waste; (b) waste management control strategies including: (i) recording of the types and amounts of wastes generated by the mining activity; (ii) segregation of the wastes; (iii) storage of the wastes; (iv) transport of the wastes; and (v) monitoring and reporting matters concerning the waste. (c) the hazard characteristics of the wastes generated including disposal procedures for regulated wastes; (d) a program for reusing, recycling or disposing of all wastes; (e) how the waste will be dealt with in accordance with the waste and resource management hierarchy, including a description of the types and amounts of waste that will be dealt with under each of the waste management practices in the waste management hierarchy (i.e. avoidance, reuse, recycling, energy recovery, disposal); (f) procedures for identifying and implementing opportunities to minimise the amount of waste generated, promote efficiency in the use of resources and improve the waste management practices employed; (g) procedures for dealing with accidents, spills, and other incidents that may impact on waste management; (h) details of any accredited management system employed, or planned to be employed, to deal with the waste; (i) how often the performance of the waste management practices will be assessed; (j) the indicators or other criteria on which the performance of the waste management practices will be assessed; and (k) staff training and induction to the waste management program. Waste Disposal
- E2
All general and regulated waste (other than waste authorised under condition (E3)) must be removed from the licensed place to a facility that is lawfully able to accept the waste.
- E3
The only waste that can be disposed is waste generated at the licensed place and is limited to: (a) waste rock; (b) tailings; (c) tyres; and (d) general waste including construction and demolition waste, green waste, putrescibles waste and commercial waste.
- E4
General waste deposited in the active waste disposal trench must be compacted and covered with a layer of inert material following placement of the waste into the trench.
- E5
Litter control methods must be effectively implemented at the active waste disposal trench.
- E6
The active waste disposal trench must be constructed, designed, engineered and operated to minimise the generation of leachate including a system of diversion drains or embankments to divert surface waters away from any area where contact with wastes or sources of contamination may occur.
- E7
Completed waste disposal trenches must be capped with a low permeability material and compacted and contoured to effectively minimise water infiltration. Permit OFFICIAL Environmental Authority EPML00899613
- E8
A record of the location of trenches used for waste disposal must be maintained in accordance with the waste disposal area identified in Schedule A - Table 1 (Authorised Mining Activities). Notwithstanding any other condition of this Environmental Authority, such records must be maintained until the administering authority approves the surrender of this Environmental Authority.
- E9
Unless otherwise permitted by the conditions of this Environmental Authority, waste must not be burnt or taken off the licensed place and burnt. Regulated Waste
- E10
Regulated waste, other than that authorised to be disposed of at the licensed place under this Environmental Authority, must only be removed and transported from the licensed place by a person who holds a current authority to transport such wastes to a facility that is lawfully able to accept the waste.
- E11
Regulated waste generated by the mining activity can be temporarily stored at the licensed place prior to removal provided it is for a period no longer than six (6) months and it is stored in a manner to minimise the risk of fire or contamination of land or waters.
- E12
Each container of regulated waste stored awaiting movement from the licensed place must be clearly marked to identify the contents. Tyre Storage and Disposal
- E13
Tyres stored awaiting disposal or transport for take-back and recycling or waste-to-energy options must be stockpiled in volumes less than 3m in height and 200m2 in area and at least 10m from any other tyre storage area.
- E14
Fire prevention measures must be implemented including the removal of all combustible materials, including grass and vegetation, within a 10m radius of any tyre storage area.
- E15
Subject to demonstrating to the administering authority that no other use higher in the waste and resource management hierarchy can be practicably implemented, waste tyres generated from the mining activity may be disposed of at the licensed place in non acid forming waste rock dumps. Mineral Waste Tailing Disposal
- E16
Tailings must be managed in accordance with procedures contained within a Mineral Waste Tailing Disposal Plan. The Mineral Waste Tailing Disposal Plan must be regularly reviewed and updated at intervals of no greater than five years. These procedures must include provisions for: (a) containment of tailings in accordance with the approved design plan(s); (b) the management of seepage and leachates both during operation and post closure; (c) the control of fugitive emissions to air; (d) a program of progressive sampling and characterisation to identify acid producing potential and metal concentrations of tailings that must include: (i) progressive characterisation of all tailings material during disposal for net acid producing potential (NAPP) and the following contaminants: arsenic, cadmium, chromium, cobalt, copper, lead, manganese, mercury, nickel, selenium, uranium, zinc and fluoride; (ii) Tailings characterisation must be undertaken at a minimum rate of eight (8) regularly spaced samples per 100,000 tonnes of tailings material discharged. This frequency must be reviewed after a period of one (1) year; and (iii) geochemical kinetic testing where the acid producing potential of tailings material has not been conclusively determined to indicate oxidation rates, potential reaction products and effectiveness of control strategies. (e) management of tailings in order to minimise the potential for environmental harm. Permit OFFICIAL Environmental Authority EPML00899613 Waste Rock Disposal
- E17
The holder of this Environmental Authority must develop and implement a waste rock management plan prior to the commencement of mining activities and regularly review and update the plan at intervals of no greater than five years.
- E18
Waste rock disposal must not occur on the licensed place unless the holder of this Environmental Authority has developed a waste rock management plan. The waste rock management plan must be certified by an appropriately qualified person, to ensure the plan has addressed the requirements of this Environmental Authority in accordance with best practice environmental management.
- E19
The waste rock management plan must be independently certified by an appropriately qualified person with a minimum of ten (10) years of demonstrated expertise and experience in the design and rehabilitation of waste rock dumps.
- E20
The waste rock management plan must include: (a) a detailed design of the waste rock dumps; (b) characterisation of the waste rock to predict the quality of runoff and seepage generated, including salinity, acidity, alkalinity, dissolved metals, metalloids and non-metallic inorganic substances; (c) a program of progressive sampling to validate pre-mine waste rock characterisation. The waste rock sampling program must include validation of salinity, acid and alkali producing potential and metal concentrations including arsenic, cadmium, chromium, cobalt, copper, iron, lead, manganese, mercury, nickel, selenium, uranium and zinc; (d) where the acid rock drainage potential/neutral mine drainage potential of waste rock material has not been conclusively determined, geochemical kinetic testing must be conducted to indicate oxidation rates, potential reaction products and effectiveness of control strategies; (e) records must be maintained of all waste rock characterisation and disposal including contingency planning for the management of acid rock/neutral mine drainage; (f) a materials balance and disposal plan demonstrating how potentially acid forming and acid forming waste rock will be selectively placed and/or encapsulated to minimise the generation of acid and metalliferous drainage; (g) a materials balance and disposal plan demonstrating how waste rock that has a potential to generate neutral and/or saline mine drainage will be selectively placed and managed to minimise the generation of neutral and/or saline mine drainage; (h) a sampling program to verify encapsulation and/or placement of potentially acid forming and acid forming waste rock and waste rock that has a potential to generate neutral mine drainage; (i) how often the performance of the plan will be assessed; (j) a rehabilitation strategy which meets the rehabilitation objectives specified in Schedule C of this Environmental Authority; and (k) monitoring of rehabilitation, research and/or trials to verify the requirements and methods for decommissioning and final rehabilitation of the placed materials, including the prevention and management of acid and metalliferous drainage, erosion minimisation and establishment of vegetation cover.
- E21
The waste rock dump must be designed, constructed and maintained to prevent any water other than incidental rainfall from entering the waste rock dump.
- E22
Any seepage from the waste rock dump must be captured and directed to an appropriately engineered and maintained storage authorised to receive seepage in accordance with Schedule D - Structures of this Environmental Authority. Permit OFFICIAL Environmental Authority EPML00899613
- E23
Five years after the commencement of mining activities, the holder of this Environmental Authority must develop and implement a waste rock dump rehabilitation trial program, which: (a) is developed and certified by an appropriately qualified person; (b) considers the closure and rehabilitation requirements detailed in Schedule C of this Environmental Authority; (c) trials a variety of different cover systems and rehabilitation techniques in accordance with condition (C5) of this Environmental Authority; and (d) includes, at a minimum, monitoring of: (i) water retention and infiltration rates; (ii) water quality of leachate; (iii) vegetation health, density, type and cover; and (iv) rainfall, evaporation, climatic data and evapo-transpiration rates.
- E24
The waste rock dump rehabilitation trial program must be reviewed on an annual basis for appropriateness, with summary reports to be provided to the administering authority on request.
- E25
All waste rock characterised as having acid forming potential must be returned to an open pit at end of mine life or be encapsulated in a suitably designed waste rock dump approved by the administering authority.
- E26
Non-acid forming waste rock may be used in rehabilitation or the construction of temporary or permanent structures within the operational areas if it is characterised as un-reactive (including material that does not cause acid, neutral or saline mine drainage). Contaminated Drainage Management
- E27
All reasonable and practicable measures must be implemented to prevent contaminated water being directly or indirectly released or likely to be released as a result of the mining activity to any waters. END OF CONDITIONS FOR SCHEDULE E Permit OFFICIAL Environmental Authority EPML00899613 SCHEDULE F - NOISE AND VIBRATION General
- F1
Noise and vibration from the mining activity must not cause environmental harm at any sensitive place or commercial place.
- F2
In the event of a complaint made to the administering authority (considered in the opinion of an authorised officer to be neither frivolous or vexatious) about noise or vibration generated in carrying out the mining activity and the noise or vibration is considered by the administering authority to be unreasonable, the holder of this Environmental Authority must take action to ensure that it is no longer an unreasonable noise or vibration. Noise and Vibration Monitoring
- F3
The holder of this Environmental Authority must ensure that noise and vibration generated by the mining activity does not cause the criteria in Schedule F - Table 1 (Noise Limits) or Schedule F - Table 2 (Blasting Noise Limits) to be exceeded at any sensitive place or commercial place.
- F4
When requested by the administering authority, noise and/or vibration monitoring and recording must be undertaken within a timeframe nominated by the administering authority at any sensitive place or commercial place and the results must be provided to the administering authority within ten (10) business days following completion of monitoring. Schedule F - Table 1 (Noise Limits) Noise Level dB(A) 7am to 6pm 7 Days per Week 10pm to Measured as: 42 6pm to 10pm 7am 42 40 LAeq,adj,1hour
- F5
The limits in Schedule F - Table 1 do not apply at a sensitive place where an alternative arrangement is in place with the owner and/or occupier of the sensitive place that covers the noise being emitted. The Environmental Authority holder must keep record of any agreement with the owner/occupier of any sensitive receptors accepting that they may experience elevated noise from the activity.
- F6
Prior to the commencement of mining activities, the holder of this Environmental Authority must develop and implement a noise monitoring program to demonstrate compliance with the noise limits identified in Schedule F - Table 1 (Noise Limits).
- F7
A copy of the noise monitoring program required by condition (F6) must be provided to the administering authority on request.
- F8
Noise monitoring and recording must include the following descriptor characteristics and matters: (a) LAN,T (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins); (b) background noise LA90; (c) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels; (d) atmospheric conditions including temperature, relative humidity and wind speed and directions; (e) effects due to any extraneous factors such as traffic noise; (f) location, date and time of monitoring; (g) if the complaint concerns low frequency noise, Max LpLIN,T; and (h) if the complaint concerns low frequency noise, one third octave band measurements in dB(LIN) for centre frequencies in the 10 - 200 Hz range.
- F9
The method of measurement and reporting of noise levels must comply with the most recent edition of the administering authority's Noise Measurement Manual or the most recent version of AS1055 Acoustics - Permit OFFICIAL Environmental Authority EPML00899613 Description and measurement of environmental noise. Air Blast and Ground Vibration
- F10
The holder of this Environmental Authority must ensure that blasting does not cause the limits for peak particle velocity and air blast overpressure in Schedule F - Table 2 (Blasting Noise Limits) to be exceeded at any sensitive place or commercial place. Schedule F - Table 2 (Blasting Noise Limits) Sensitive or Commercial Place Limits Blasting Noise Limits 7am to 6pm 6pm to 7am Air blast overpressure 115 dB (Linear) peak for nine (9) out of No Blasting ten (10) consecutive blasts initiated and not greater than 120 dB (Linear) peak at any time. Ground vibration peak particle velocity 5mm/second peak particle velocity for No Blasting nine (9) out of ten (10) consecutive blasts and not greater than 10 mm/second peak particle velocity at any time.
- F11
The holder of this Environmental Authority must develop and implement a blast monitoring program to monitor compliance with Schedule F - Table 2 (Blast Noise Limits) for: (a) at least 50% of all blasts undertaken on the licensed place each year at the nearest sensitive place or commercial place; and (b) all blasts conducted during any time period specified by the administering authority at any sensitive place or commercial place.
- F12
Where blast monitoring detects non-compliance with Schedule F - Table 2 (Blasting Noise Limits) the holder of this Environmental Authority must: (a) take steps to ensure compliance is achieved by subsequent blasts; and (b) continue to monitor all consecutive blasts until at least three (3) successive blasts comply with Schedule F - Table 2 (Blasting Noise Limits).
- F13
The method of measurement and reporting of vibration levels must comply with the most recent edition of the administering authority's guideline Noise and vibration from blasting.
- F14
The method of measurement and reporting of air blast overpressure levels must comply with the most recent Australian standard Explosives - Storage and use guidelines. END OF CONDITIONS FOR SCHEDULE F Permit OFFICIAL Environmental Authority EPML00899613 SCHEDULE G - WATER Contaminant Release
- G1
Contaminants that will, or have the potential to cause environmental harm, must not be released directly or indirectly to any waters, except as permitted under the conditions of this Environmental Authority.
- G2
Unless otherwise permitted under the conditions of this Environmental Authority, the release of contaminants to waters must only occur from the release points specified in Schedule G - Table 1 (Contaminant release points, sources and receiving water) and depicted in Schedule J - Plan 3.
- G3
Releases to waters must be undertaken so as not to cause erosion of the bed and banks of the receiving waters or cause a material build-up of sediment in such waters. Schedule G - Table 1 (Contaminant release points, sources and receiving waters) Release Coordinates Contaminant source and release Receiving waters description point (GDA2020 MGA zone 54) location Easting Northing RP1 410837 7773142 Northern MAW Dam (release Cabbage Tree Creek infrastructure) RP6 413509 7756518 Scanlan MAW Dam (release Dugald River (upper) infrastructure) RP9 412466 7753519 Lady Clayre MAW Dam (release Dugald River (upper) infrastructure)
- G4
Any spillage of wastes, contaminants or other materials must be cleaned up as quickly as practicable to minimise the release of wastes, contaminants or materials to any stormwater drainage system or receiving waters.
- G5
The release of water from release points to waters must be monitored at the locations specified in Schedule G - Table 1 - Contaminant release points, sources and receiving waters for each quality characteristics and at the frequency specified in Schedule G - Table 2 Contaminant release limits, Schedule G - Table 3 - Contaminant release during flow events (Cabbage Tree Creek) and Schedule G - Table 4 - Contaminant release during flow events (Dugald River).
- G6
The release of water from release points specified in Schedule G - Table 1 (Contaminant release points, sources and receiving waters) must not exceed the release limits stated in Schedule G - Table 2 (Contaminant release limits) when measured at the release points specified in Schedule G - Table 1 (Contaminant release points, sources and receiving waters).
- G7
If an exceedance in accordance with condition G6 is identified, the holder of this Environmental Authority must: a) notify the administering authority, via WaTERS, as soon as practicable but within twenty-four (24) hours of receiving the result; and b) complete an investigation into potential environmental harm and provide a written report to the administering authority within three (3) months, as per Condition G13. If for unforeseen technical reasons WaTERS is unavailable, please contact the Pollution Hotline. Permit OFFICIAL Environmental Authority EPML00899613
- G8
By 30 June 2028, or the point at which at least 24 months of data is obtained, whichever is the latter, the holder of this environmental authority must submit to the administering authority a list of revised release limits for limits identified as `interim' in Schedule G - Table 2 Contaminant release limits, including all calculations and justifications based on minimum dilution ratios in Schedule G - Table 3 (Contaminant release during flow events (Cabbage Tree Creek)) and Schedule G - Table 4 Contaminant release during flow events (Dugald River). The release rates in Schedule G - Table 3 (Contaminant release during flow events (Cabbage Tree Creek)) and Schedule G - Table 4 Contaminant release during flow events (Dugald River) may also be revised to accommodate the new release limits, if required. NOTE: The raw data (at least 24 months) must be provided with the calculated site-specific limit values. Schedule G - Table 2 Contaminant release limits Quality characteristic1 Release limit Monitoring frequency Electrical conductivity (in- Release limits specified in Table Daily during release (the first sample must be situ, -S/cm) 3 and Table 4 for variable flow taken within two hours of commencement of criteria release) pH (in-situ, pH unit) 6.0 (minimum) 9.0 (maximum) Total suspended solids Upstream value +10% (TSS, mg/L)4,5 Sulfate (mg/L) 250 Fluoride (mg/L)4 1.72 Dissolved Aluminium (mg/L)4 0.263 Dissolved Arsenic (mg/L)4 0.0132 Dissolved Cadmium (mg/L)4 0.00022 Dissolved Chromium (mg/L)4 0.0012 Dissolved Cobalt (mg/L)4 0.00142 Dissolved Copper (mg/L)4 0.0063 Total Iron (mg/L)4 0.282 Dissolved Lead (mg/L)4 0.00342 Dissolved Manganese 1.92 (mg/L)4 Dissolved Mercury 0.00062 (inorganic) (mg/L)4 Dissolved Molybdenum 0.0342 (mg/L)4 Dissolved Nickel (mg/L)4 0.0112 Dissolved Selenium (mg/L)4 0.0112 Permit OFFICIAL Environmental Authority EPML00899613 Quality characteristic1 Release limit Monitoring frequency Dissolved Silver (mg/L)4 0.000052 Dissolved Uranium (mg/L)4 0.00683 Dissolved Zinc (mg/L)4 0.0082 1. All metals and metalloids must be measured as total (unfiltered) and dissolved (field filtered) concentrations 2. ANZG (2018) guidelines for the protection of 95% of aquatic ecosystems 3. 95th percentile of baseline data collected in the receiving environment prior to mining activities commencing 4. Interim release limits to be revised as per Condition G8
- G9
Notwithstanding any other condition of this Environmental Authority, the release of contaminants to waters in accordance with condition G2 must only take place during periods of natural flow, exceeding 2 m3/s, in accordance with the receiving water flow criteria for discharge specified in Schedule G - Table 3 (Contaminant release during flow events (Cabbage Tree Creek)) and Table 4 (Contaminant release during flow events (Dugald River)).
- G10
The release of contaminants to waters in accordance with condition G2 must not exceed the electrical conductivity (EC) or the maximum release rate (for all combined release point flows) for each receiving water flow criteria for discharge specified in Schedule G - Table 3 (Contaminant release during flow events (Cabbage Tree Creek)) and Schedule G - Table 4 (Contaminant release during flow events (Dugald River)) when measured at the release points specified in Schedule G - Table 1 (Contaminant release points, sources and receiving waters). Schedule G - Table 3 (Contaminant release during flow events (Cabbage Tree Creek)) Release Point (RP) RP1 Gauging station / upstream U/S Little Eva and Blackard monitoring point: Receiving water Continuous Coordinates - 407675 / 7768905 flow recording (minimum daily) Easting/Northing (GDA2020 MGA Zone 54) frequency Receiving waters Receiving water flow Maximum release rate EC release limit flow regime criteria for discharge (m3/s) (-S/cm) (for all combined RP flows) (m3/s) Low flow < 2 m3/s of natural flow No release Medium flow > 2 m3/s 1.0 m3/s 1,000 > 3 m3/s 1.5 m3/s 1,000 1.0 m3/s 1,250 > 4 m3/s 2.0 m3/s 1,000 1.3 m3/s 1,250 High flow > 10 m3/s 1.0 m3/s 1,500 5.0 m3/s 1,000 3.0 m3/s 1,250 2.5 m3/s 1,500 1.6 m3/s 2,000 1.2 m3/s 2,500 > 20 m3/s 1.0 m3/s 3,000 10 m3/s 1,000 3.3 m3/s 2,000 2.0 m3/s 3,000 1.4 m3/s 4,000 1.1 m3/s 5,000 Very-high flow > 50 m3/s 0.9 m3/s 6,000 12.5 m3/s 1,500 8.3 m3/s 2,000 Permit OFFICIAL Environmental Authority EPML00899613 Release Point (RP) RP1 Gauging station / upstream U/S Little Eva and Blackard Ultra-high flow > 67 m3/s monitoring point: 5.0 m3/s 3,000 3.5 m3/s 4,000 2.7 m3/s 5,000 2.2 m3/s 6,000 1.9 m3/s 7,000 11.1 m3/s 2,000 6.7 m3/s 3,000 4.7 m3/s 4,000 3.7 m3/s 5,000 3.0 m3/s 6,000 2.6 m3/s 7,000 Schedule G - Table 4 - Contaminant release during flow events (Dugald River) Release Point (RP) RP6 and RP9 Gauging station / upstream U/S Lady Clayre and Scanlan Receiving water Continuous monitoring point: 412538 / 7753362 flow recording frequency (minimum daily) Coordinates - Lat/Long Receiving waters Receiving water flow (GDA2020 MGA Zone 54) flow regime criteria for discharge (m3/s) < 2 m3/s of natural flow Maximum release rate EC release limit Low flow (for all combined RP flows) (-S/cm) Medium flow > 2 m3/s > 3 m3/s (m3/s) 1,000 High flow > 4 m3/s 1,250 No release 2,000 > 10 m3/s 1.0 m3/s 1,500 1.0 m3/s 2,500 > 20 m3/s 0.5 m3/s 5,000 1.0 m3/s 3,000 0.5 m3/s 5,000 0.3 m3/s 7,000 1.0 m3/s 5,500 0.6 m3/s 7,000 0.2 m3/s 1.0 m3/s 0.8 m3/s
- G11
The holder of this Environmental Authority must notify the administering authority of a release event (no later than twenty-four (24) hours after having commenced releasing contaminated water to the receiving environment). Notification must include the submission of written verification to the administering authority, via WaTERS of the following information: (a) release commencement date/time; (b) expected release cessation date/time; (c) release location(s); (d) release rate and contaminant load (estimated); (e) receiving water(s) including the natural flow rate; and (f) any details (including available data) regarding likely impacts on the receiving water(s). If for unforeseen technical reasons WaTERS is unavailable, please contact the Pollution Hotline.
- G12
The holder of this Environmental Authority must notify the administering authority, via WaTERS, within twenty- four (24) hours after cessation of a release as notified under condition (G11) and within twenty (20) business days provide the following information in writing: (a) release cessation date/time; (b) natural flow volume in receiving water; (c) volume of water released; (d) details regarding the compliance of the release with the conditions of Schedule G in this Environmental Permit OFFICIAL Environmental Authority EPML00899613 Authority (i.e. contaminant limits, natural flow, discharge volume); (e) all in-situ water quality monitoring results; and (f) any other matters pertinent to the release. If for unforeseen technical reasons WaTERS is unavailable, please contact the Pollution Hotline.
- G13
Any investigation related to a release of contaminants must include the submission of a report and all corresponding raw data to the administering authority, via WaTERS, including: (a) the reason for the release; and (b) the location of the release; and (c) the duration, volume and flow rate of the release; and (d) all water quality monitoring results (including all laboratory analyses) for the relevant release point and corresponding upstream and downstream monitoring point/s, including historical data collected at these locations presented in the form of timeseries and in the form of summary statistics for data collected in similar flow conditions; and (e) all flow data collected at relevant flow gauges; and (f) an assessment of water quality results with regards to environmental values, with consideration of flow condition in the receiving environment at the time of the release; and (g) any general observations; and (h) all calculations; and (i) any other matters pertinent to the water release event. If for unforeseen technical reasons WaTERS is unavailable, please contact the Pollution Hotline.
- G14
Records of all water quality monitoring data collected as part of conditions in Schedule G of this Environmental Authority (release, receiving environment, REMP, water storages, sewage treatment plants and groundwater) must be kept and provided to the administering authority in the specified electronic format via WaTERS on 1 June of each year, including: (a) the date and time when the sample was taken; (b) the monitoring point where the sample was taken, including geographical co-ordinates if different from monitoring points listed in this Environmental Authority); (c) the water quality result of each monitored parameter. Receiving Waters Monitoring
- G15
The holder of this environmental authority must ensure stream flow gauging stations are installed, operated and maintained to determine and record flows at the locations and flow recording frequency specified in Schedule G - Table 3 Contaminant release during flow events (Cabbage Tree Creek), Schedule G -Table 4 Contaminant release during flow events (Dugald River) and Schedule G -Table 5 (Receiving Water Upstream and Downstream Monitoring Points).
- G16
The quality of the receiving waters must be monitored at the locations specified in Schedule G - Table 5 (Receiving water Upstream and downstream monitoring points) and identified on Schedule J - Plan 3 (Surface water and sediment monitoring locations) for each quality characteristic listed in Schedule G - Table 6 (Receiving waters water quality objectives and trigger investigation levels) and at the monitoring frequency stated in Schedule G - Table 5 (Receiving water Upstream and downstream monitoring points). Permit OFFICIAL Environmental Authority EPML00899613 Schedule G - Table 5 (Receiving Water Upstream and Downstream Monitoring Points) Watercourse Monitoring Description Coordinates Parameters Frequency location (GDA2020 MGA Zone 54) Easting Northing Upstream monitoring points Approximately Cabbage Tree U/S Little Eva 5,950 metres 407696 7768969 Creek5 and Blackard upstream of RP1 Approximately Flow, pH, Continuous 220 metres EC upstream of Dugald River U/S Lady Clayre 412538 7753362 (upper)6 and Scanlan3 RP9 and 3,740 metres upstream of RP6 Cabbage Tree U/S Little Eva Approximately 407696 7768969 Creek5 and Blackard 5,950 metres upstream of In-situ parameters: daily during RP1 Water quality release events (with first sample within two (2) hours of Dugald River U/S Lady Clayre Approximately as per commencement of release) (upper)6 and Scanlan3 220 metres Schedule G Laboratory parameters: weekly upstream of during release (first sample Table 6 within two (2) hours of RP9 and 3,740 commencement of release) metres 412538 7753362 upstream of RP6 Downstream compliance points Cabbage Tree D/S Little Eva Approximately 410581 7775474 Flow, pH, Creek5 and Blackard 2700 metres EC downstream of RP1 Approximately 4141451 77593291 EC and pH Continuous 6600 metres 4144542 77604192 Flow Dugald River D/S Lady Clayre downstream of (upper)6 and Scanlan3 RP9 and 3000 metres downstream of RP6 Permit OFFICIAL Environmental Authority EPML00899613 Watercourse Monitoring Description Coordinates Parameters Frequency Cabbage Tree location (GDA2020 MGA Approximately In-situ parameters: daily during Creek5 D/S Little Eva 2700 metres Zone 54) release events (with first and Blackard downstream of sample within two (2) hours of Dugald River Easting Northing commencement of release) (upper)6 D/S Lady Clayre RP1 Laboratory parameters: weekly and Scanlan3 7775474 during release (first sample Approximately 410581 within two (2) hours of SW33 3000 metres commencement of release) downstream of 4141451 Water quality RP6 as per Approximately 77593291 1,450 metres downstream of Schedule G Table 6 RP9 413346 7754589 1. Proposed water quality monitoring location 2. Proposed space-time image velocimetry (STIV) location 3. Monitoring to commence two years prior to commencement of mining, as per Condition G17. 4. "Flowing condition" is defined as a minimum flow detected (above 0.001 cumecs) at the continuous flow gauge 5. Relevant to releases from RP1 6. Relevant to releases from RP6, RP9
- G17
Prior to commencement of mining in the Scanlan and Lady Clayre area, the holder of this Environmental Authority must: (a) collect at least 24 months of water quality data at the upper Dugald River sites listed in Schedule G - Table 5 (Receiving water upstream and downstream monitoring points), including continuous electrical conductivity, pH and flow at `U/S Lady Clayre and Scanlan' (b) revise all values identified as `interim triggers' in Schedule G - Table 6 (Receiving waters trigger investigation levels), via an amendment application under the Environmental Protection Act 1994, once at least 24 months data have been collected. NOTE: The raw data (at least 24 months) must be provided with the calculated site-specific trigger values; and laboratory samples must include a minimum of 12 datapoints collected during flows exceeding 2 cumecs that occurred on different rain events. Schedule G - Table 6 (Receiving waters trigger investigation levels) Watercourse Cabbage Tree Creek Upper Dugald River Associated RPs RP1 RP6, RP9 Quality Characteristic1 Water quality Trigger level3 Water quality Trigger Level3 objective2 objective2 7.5 (minimum) 7.0 (minimum) 7.5 (minimum) 7.0 (minimum) 8.2 (maximum) 8.4 (maximum) pH (in-situ, pH units) 8.1 (maximum) 8.3 (maximum) Permit OFFICIAL Environmental Authority EPML00899613 EC (in-situ, -S/cm) 500 610 500 700 Sulfate (mg/L) 250 Fluoride (mg/L) 1.7 0.055 0.26 0.14 0.36 Dissolved Aluminium (mg/L) 4 Dissolved Arsenic (mg/L) 4 0.013 Dissolved Cadmium (mg/L) 4 0.0002 Dissolved Chromium (mg/L) 4 0.001 0.0014 Dissolved Cobalt (mg/L) 4 Dissolved Copper (mg/L) 4 0.006 Total Iron (mg/L) 4 0.28 Dissolved Lead (mg/L) 4 0.0034 Dissolved Manganese (mg/L) 4 1.9 Dissolved Mercury (inorganic) 0.0006 (mg/L) 4 Dissolved Molybdenum (mg/L) 4 0.034 Dissolved Nickel (mg/L) 4 0.011 Dissolved Selenium (mg/L) 4 0.011 Dissolved Silver (mg/L) 4 0.00005 Dissolved Uranium (mg/L) 4 0.007 Dissolved Zinc (mg/L) 4 0.008 Total Suspended Solids (mg/L) 4 upstream - 10% Turbidity (in-situ, NTU) For interpretation purposes Major Cations and Anions For interpretation purposes Dissolved organic carbon (DOC) For interpretation purposes 1 All metals and metalloids must be measured as total (unfiltered) and dissolved (field filtered) concentrations. 2 Default ANZG (2018) or 80th percentile (or 75th percentile for EC, or 20th-80th percentile for pH) of reference (background) water quality data whichever is higher. 3 Default ANZG (2018) or 95th percentile (or 5th-95th percentiles for pH) of reference (background) water quality data whichever is higher. 4 Interim trigger value to be revised in accordance with Condition G17 (minimum 12 datapoints collected during flowing conditions exceeding 2 cumecs). Permit OFFICIAL Environmental Authority EPML00899613
- G18
If quality characteristics of the receiving waters at the downstream monitoring point specified in Schedule G - Table 5 - Receiving Water Upstream and Downstream Monitoring Points exceeds any of the trigger levels specified in Schedule G -Table 6 - Receiving waters trigger levels, the Environmental Authority holder must compare the downstream results to the upstream results in the receiving waters and: a) where the downstream result is similar to (-10%, or less than, but within the trigger range for pH), the upstream value for the quality characteristics, then no action is to be taken, or b) where the downstream result is less than the bioavailability-corrected default guideline value as per ANZG (2018) published (i.e. non-draft) technical guidance (e.g. DOC corrected sample-specific value) for the quality characteristics, then no action is to be taken, or c) where the downstream results do not meet the description in G18(a) and (b), complete an investigation into potential environmental harm and provide a written report, including all corresponding raw data, to the administering authority within three (3) months, outlining, (i) Details of the investigations carried out; and (ii) Actions taken to prevent environmental harm. The administering authority reserves the right to take compliance actions based on results of any investigation. Note: Where an exceedance of a contaminant release limit or receiving environment trigger has occurred and is being investigated, in accordance with clause (c) of this condition, then no further reporting is required for subsequent exceedance events for that quality characteristic within the three month investigation period. Onsite Water Storages
- G19
Water storages stated in Schedule G - Table 7 (Onsite Water Storage Monitoring Locations) must be monitored for the water quality characteristics specified in Schedule G -Table 8 (Onsite Water Storage Contaminant Limits) at the monitoring storages and at the monitoring frequency specified in Schedule G - Table 7 (Onsite Water Storage Monitoring Frequency). Schedule G - Table 7 (Onsite Water Storage Monitoring Frequency) Water Storage Description Frequency of Monitoring MAW Dams and TSF Monthly Northern MAW Dam Monthly Scanlan MAW Dam Lady Clayre MAW Dam Blackard Northern MAW Dam Blackard Southern MAW Dam TSF MAW Dam Bedford MAW Dam Southern ROM Dam Tailings Storage Facility (decant pond) MAW and Other Storages Permit OFFICIAL Environmental Authority EPML00899613 Quarterly Little Eva Borrow Pit (when used as storage) Turkey Creek Pit (when used as storage) Northern MAW Dam Turkeys Nest Turkey Creek Pit Turkeys Nest Turkeys Nest 2 (Core Farm) Turkeys Nest 3 (TSF) Process Water Pond Raw Water Pond Site Runoff Pond
- G20
In the event that any high consequence water storages exceed the contaminant limits defined in Table 3 of the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams, the holder of this Environmental Authority must comply with Table 4 of the Manual for Assessing Consequence Categories and Hydraulic
- G21
In the event that waters storages defined in Schedule G - Table 7 (Onsite Water Storage Monitoring Frequency) exceed the contaminant limits defined in Schedule G -Table 8 (Onsite Water Storage Contaminant Limits) the holder of this Environmental Authority must implement measures to prevent access to waters by all livestock and minimise access by native fauna. Schedule G - Table 8 (Onsite Water Storage Contaminant Limits) Quality Characteristic3 Test Value Contaminant Limit Minimum 4.02 pH (pH unit) Maximum 9.02 EC (S/cm) Maximum 59701 Sulfate (mg/L) Maximum 10001 Fluoride (mg/L) Maximum 21 Aluminium (mg/L) Maximum 51 Arsenic (mg/L) Maximum 0.0251 Cadmium (mg/L) Maximum 0.011 Chromium (mg/L) Maximum 0.051 Cobalt (mg/L) Maximum 11 Copper (mg/L) Maximum 11 Iron (mg/L) Interpretation For interpretation purposes Lead (mg/L) Maximum 0.11 Permit OFFICIAL Environmental Authority EPML00899613 Manganese (mg/L) Interpretation 101 Mercury (mg/L) Maximum 0.0021 Molybdenum (mg/L) Maximum 0.0241 Nickel (mg/L) Maximum 11 Selenium (mg/L) Maximum 0.021 Silver (mg/L) Interpretation For interpretation purposes Uranium (mg/L) Maximum 0.21 Zinc (mg/L) Maximum 201 Total Suspended Solids (mg/L) Interpretation For interpretation purposes Major cations and anions Interpretation For interpretation purposes 1. Contaminant limit based on ANZECC (2000) and draft ANZG (2023) stock water quality guidelines for beef cattle (applicable total (unfiltered) fraction). 2. Page 4.2-15 of ANZECC (2000) "Soil and animal health will not generally be affected by water with pH in the range of 4-9". 3. All metals and metalloids must be measured as total (unfiltered) and dissolved (field filtered). This table only includes limits for parameters for which livestock guideline values exist, however other contaminants of concern must also be monitored for interpretation of any potential point- source influence. Receiving Environment Monitoring Program
- G22
A Receiving Environment Monitoring Program (REMP) must be implemented by an appropriately qualified person within three months of the holder of this Environmental Authority satisfying the requirements of condition G25 and G26.
- G23
The REMP must monitor and record the effects of the mining activities and the release of contaminants on the receiving environment periodically and whilst contaminants are being released. The aim of the REMP is to identify and describe the extent of any adverse impacts on local environmental values and to monitor any changes in the receiving waters. A copy of the REMP and any update or variation of the REMP must be provided to the administering authority prior to its implementation.
- G24
On or before 30 June 2026, a REMP Design Document must be: a) prepared in accordance with condition G26 and b) submitted to the administering authority. For the purposes of the REMP, the receiving environment is the waters and connected waterways within 5km downstream of the mining activity.
- G25
Any comments made by the administering authority on the REMP Design Document must be addressed to the reasonable satisfaction and within a timeframe specified by the administering authority.
- G26
The REMP Design Document must include (but not necessarily be limited to) the following: (a) description of potentially affected receiving groundwaters and surface waters including key communities and reference water quality and sediment characteristics based on accurate and reliable monitoring data that takes into consideration any temporal variation (e.g. seasonality); (b) description of applicable environmental values and water quality objectives to be achieved (i.e. as scheduled pursuant to the Environmental Protection (Water and Wetland Biodiversity) Policy 2019; (c) any relevant reports prepared by other governmental or professional research organisations that relate Permit OFFICIAL Environmental Authority EPML00899613 to the receiving environment to which the REMP applies; (d) water and sediment quality targets within the receiving environment to be achieved, and definition of contaminant concentrations or level indicating adverse environmental impacts during the REMP; (e) monitoring and assessment for any potential adverse environmental impacts caused by a release; (f) monitoring of stream flow and hydrology; (g) monitoring of toxicants that must consider the quality characteristics specified in Schedule G - Table 6 (Receiving Waters Contaminant Triggers) to assess the extent of the compliance of concentrations with water quality objectives and/or the latest iteration of ANZG (2018) Guidelines for slightly to moderately disturbed ecosystems; (h) monitoring of water quality of parameters specified in Schedule G - Table 6 (Receiving waters trigger investigation levels) and additional physico-chemical parameters, including dissolved oxygen saturation and temperature; (i) minimum twice-yearly monitoring of sediments for parameters listed in the REMP. (j) monitoring biological indicators (for macroinvertebrates in accordance with the administering authority's monitoring and sampling manual (AusRivas Methodology) and metals/metalloids in sediments (in accordance with latest iteration of ANZG (2018) and/or the most recent version of AS5667.1 Guidance on Sampling of Bottom Sediments) for permanent, semi-permanent water holes and water storages; (k) the locations of monitoring points associated with release points, including, but not limited to, the upstream and downstream locations specified in Table 5 (Receiving Water Upstream and Downstream Monitoring Points), and additional locations relevant to the monitoring of the mine activities unrelated to releases. Reference sites must comply with the following criteria: (i) be from the same bio-geographic and climatic region; (ii) have similar geology, soil types and topography; (iii) contain a range of habitats similar to those at the potentially impacted sites; (iv) have a similar flow regime; and (v) not be so close to the potentially impacted sites that any disturbance at the potentially impacted sites also results in a change at the reference site. (l) the frequency or scheduling of sampling and analysis that is sufficient to determine water quality objectives and to derive site specific reference values within two (2) years (depending on wet season flows) in accordance with the Queensland Water Quality Guidelines. For ephemeral streams, this should include periods of flow irrespective of mine or other release; (m) specify sampling and analysis methods and quality assurance and control; (n) any historical datasets to be relied upon; (o) description of the statistical basis on which conclusions are drawn; and (p) any spatial and temporal controls to exclude potential confounding factors.
- G27
A report outlining the findings of the REMP including all monitoring results and interpretations in accordance with condition (G23) must be prepared by an appropriately qualified person and submitted in writing to the administering authority by 1 June each year. The report must include: a) an assessment of upstream water quality and the assimilative capacity for those contaminants monitored; and b) all surface water and sediment monitoring results as required by this environmental authority and the REMP Design, including release and receiving environment data presented in the form of timeseries for each monitoring location; and c) all biota indicator monitoring results, as per the REMP Design Document; and d) interpretation of the monitoring results with consideration of variability associated with flow conditions and temporal trends, including historical data; and e) an assessment of all detected impacts to the receiving environment; and f) an assessment of the suitability of current contaminant release limits to protect downstream environmental values; and Permit OFFICIAL Environmental Authority EPML00899613 g) Any recommendations to address any risk or impact identified to environmental values. If contaminant release limits are identified as unsuitable to protect downstream environmental values, recommendations for more appropriate contaminant limits must be included.
- G28
Any comments made by the administering authority on the REMP Reports must be given due consideration by the holder of this Environmental Authority and addressed in following REMP sampling and reporting years. Stream Sediment Monitoring
- G29
Sediment quality of receiving waters and reference waters must be monitored twice a year (once at the end of the wet season and once at the end of the dry season) at the monitoring locations defined in Schedule G - Table 6 (Receiving Water Reference Sites and Downstream Monitoring Points) and identified on Schedule J - Plan 3 - Surface Water and Sediment Monitoring Locations.
- G30
All stream sediment sampling must be undertaken in accordance with the most recent version of Australian Standard AS 5667.12 Guidance on Sampling of Bottom Sediments. Water Management Plan
- G31
A water management plan must be developed and implemented by 31 December 2026, which provides for the proper and effective management of the actual and potential environmental impacts resulting from the mining activity and to ensure compliance with the conditions of this Environmental Authority.
- G32
The water management plan must be developed by an appropriately qualified person in accordance with the most recent edition of the administering authority's guideline Application Requirements for Activities with Impacts (a) contaminant source study; (b) site water balance and model; (c) water management system; (d) uncontrolled release prevention and management measures; (e) saline drainage prevention and management measures; (f) acid rock drainage prevention and management measures; (g) emergency and contingency planning; and (h) monitoring and review.
- G33
The holder of this Environmental Authority must undertake a review of the water management plan before 1 November each year to ensure that proper and effective measures, practices or procedures are in place so that the mine is operated in accordance with the conditions of this Environmental Authority and that environmental harm is prevented or minimised. Site Water Balance
- G34
The water balance model requested in condition G32(b) must be developed by 31 December 2026 and run for a simulation period for the following: (a) weekly during the period November to March; (b) monthly during other periods; (c) promptly after each rainfall event greater than fifty (50) millimetres within a twenty-four (24) hour period within the relevant surface water containment area; (d) with documentation of inputs and outputs from each run being stored and retrievable for a minimum period of one (1) year; (e) performance in response to rainfall must be undertaken by an appropriately qualified person. Permit OFFICIAL Environmental Authority EPML00899613 (f) assessments using the operational simulation water balance model must use a minimum of 100 years of historical rainfall data Erosion and Sediment Control
- G35
An erosion and sediment control plan (ESCP), developed by an appropriately qualified person, must be implemented and maintained to prevent or minimise erosion and the release of sediment to receiving waters and the contamination of stormwater as a result of the carrying out of the mining activity.
- G36
By 1 November each year, the ESCP must be reviewed and, if necessary, updated by an appropriately qualified person to address all disturbed areas and any new stages of the mining activity planned for the following year. The updated ESCP must be implemented prior to the commencement of any new stage of the mining activity.
- G37
The erosion and sediment control plan must provide for at least the following functions: (a) prevent or minimise the contamination of receiving waters and stormwater; (b) diverting uncontaminated stormwater run-off around areas disturbed by the mining activity or where contaminants or wastes are stored or handled; (c) contaminated stormwater runoff, incident rainfall and leachate is collected; and treated, reused, or released in accordance with the conditions of this Environmental Authority; (d) roofing or minimising the size of areas where contaminants or wastes are stored or handled; (e) erosion and sediment control structures are placed to minimise erosion of disturbed areas and prevent the contamination of any waters; (f) procedures to ensure that erosion and sediment control structures are maintained and adequate storage is available in sediment dams in accordance with design criteria; and (g) training of staff that will be responsible for maintenance and operations of sediment and erosion control structures.
- G38
Erosion protection measures and sediment control measures must be implemented and maintained to minimise erosion and the release of sediment and contamination of stormwater. Groundwater Monitoring Program
- G39
Prior to the commencement of mining activities, the holder of this Environmental Authority must develop and implement a groundwater monitoring program that must include: (a) groundwater monitoring bore locations; (b) justification for the location of the proposed groundwater monitoring locations, including, but not limited to; (i) sufficient background/reference monitoring sites, that are unaffected by the mining activity authorised under this Environmental Authority to allow scientifically justifiable conclusions on the level of impact from the mining activity; (ii) base flow assessment of all watercourses affected by mining activity; and (iii) sufficient number of monitoring bores to enable early detection of any groundwater contamination. (c) monitoring of both shallow and deep groundwater and includes an adequate number of monitoring bores which provides sufficient spatial coverage to enable scientifically justifiable conclusions in relation to potential environmental impacts from the mining activity; (d) provision for development of baseline groundwater quality, groundwater flow direction and rate and hydraulic conductivity. In addition, consideration must be given to how these parameters may change during the life of the mining project. (e) characterisation of the potential impacts to the local groundwater system arising from the mining activity; (f) representative groundwater samples for the aquifers being sampled; (g) bore construction details; and Permit OFFICIAL Environmental Authority EPML00899613 (h) findings from any resistivity studies undertaken at the licensed place. (i) performance monitoring for the Northern MAW liner and seepage recovery system, with reporting of recovered seepage volumes against design assumptions.
- G40
The groundwater monitoring program specified in condition (G39) must be independently certified by an appropriately qualified person.
- G41
The Groundwater Monitoring Program must be reviewed on a regular basis to ensure that proper and effective measures, practices or procedures are in place so that the mine is operated in accordance with the conditions of this Environmental Authority and that environmental harm is prevented or minimised. Monitoring Bore Construction, Maintenance and Decommissioning
- G42
Groundwater monitoring bores must be constructed, maintained and decommissioned in accordance with methods prescribed in the latest edition of the Agriculture and Resource Management Council of Australia and New Zealand manual titled Minimum Construction Requirements for Water Bores in Australia.
- G43
Oil-based drilling fluids, oil-based additives, synthetic based drilling fluids or synthetic based additives must not be used in the construction of groundwater monitoring bores.
- G44
Current Material Safety Data Sheets for all substances used for the drilling of groundwater monitoring bores must be made available to the administering authority promptly upon request.
- G45
Remedial measures must be taken immediately if the holder of this Environmental Authority becomes aware that either monitoring bore construction, maintenance or decommissioning have resulted in a change in groundwater quality, groundwater levels or have caused the interconnection of aquifers. Groundwater Monitoring
- G46
The holder of this Environmental Authority must not release contaminants to groundwater.
- G47
Groundwater quality and standing water level must be monitored: (a) at the locations and frequencies defined in Schedule G - Table 9 (Groundwater Monitoring Locations and Frequency) and the plan provided in Schedule J - Plan 4 - Groundwater Monitoring Locations: (b) for quality characteristics identified in Schedule G - Table 10 (Groundwater Quality Limits).
- G48
Monitoring of any future bores listed as Compliance Bores in Schedule G - Table 9 must begin at least 24 months prior to the commencement of mining activities in each mining area.
- G49
The holder of this Environmental Authority must complete a hydraulic testing program, including installation of monitoring bores and pumping tests, in the Proterozoic rock (AQ6) within the southern pit areas (Lady Clayre, Scanlan, Bedford) within at least 2 years prior to commencement of mining in each respective mining area.
- G50
At least six months prior to commencement of mining in the applicable mining areas, the holder of this Environmental Authority must submit an amendment application lodged pursuant to the Environmental Protection Act 1994 to this environmental authority, nominating the TBA values for Monitoring Points BEDC05, BEDC06, BCRC07, BCRC08, BCRC09 and SCC04 as identified in Footnote 2 and 3 of Schedule G - Table 9 (Groundwater Monitoring Locations and Frequency). NOTE: The application must include a hydrogeological assessment to evaluate the monitoring depths, and the frequency of monitoring. Permit OFFICIAL Environmental Authority EPML00899613 Schedule G - Table 9 (Groundwater Monitoring Locations and Frequency) Bore ID Mining area Hydrostratigraphic Coordinates Surface Screened Monitoring Parameters unit (GDA2020 MGA zone mAHD1 Interval Frequency mAHD 54) TBA2 Easting Northing TBA2 TBA2 Compliance Bores TBA3 BEDC02 Bedford 4 Proterozoic rock 414871 7768071 TBA2 TBA3 Quarterly Levels &
- AQ6
TBA2 Quarterly quality 10 to 4 Quarterly Levels & BEDC03 Bedford 4 Proterozoic rock 415660 7767457 TBA2 TBA2 Quarterly quality
- AQ6
170 to -100 Quarterly Levels & TBA2 Quarterly quality BEDC04 Bedford 4 Proterozoic rock 415609 7766458 TBA2 25 to 19 Quarterly
- AQ6
TBA3 Quarterly Levels & TBA3 Quarterly quality BEDC05 Bedford 4 Proterozoic rock 415947 7766838 TBA3 TBA3 Quarterly (AQ6)3 Quarterly Levels & 119 to 110 Quarterly quality BEDC01 Bedford 4 Proterozoic rock 415568 7766076 TBA3 TBA2 Quarterly Levels & BCRC01 Blackard 4 (AQ6) 411706 7767615 TBA2 TBA2 Quarterly quality BCRC02 Blackard 4 412551 7766684 184 TBA2 Quarterly Levels & BCRC03 Blackard 4 Proterozoic rock 413015 7765504 TBA2 Quarterly quality BCRC04 Blackard 4 (AQ6) 413496 7764079 195 -39 to -45 Quarterly Levels & BCRC05 Blackard 4 412130 7764937 TBA2 132 to 114 Quarterly quality BCRC06 Blackard 4 Proterozoic rock 410774 7765649 199 Quarterly Levels &
- AQ6
56 to 50 Quarterly quality 58 to 52 Quarterly Levels & Proterozoic rock Quarterly quality
- AQ6
Levels & quality Proterozoic rock
- AQ6
Levels & quality Proterozoic rock
- AQ6
Levels & quality Proterozoic rock
- AQ6
Levels & quality BCRC07 Blackard 4 Proterozoic rock 411027 7766925 TBA3 Levels &
- AQ6
quality Levels & BCRC08 Blackard 4 Proterozoic rock 413636 7763185 TBA3 quality
- AQ6
Levels & quality BCRC09 Blackard 4 Proterozoic rock 413281 7762253 TBA3 Levels &
- AQ6
quality Levels & CS1 - Graben Gilbert River Fm 407810 7780332 151 quality AQ2 (AQ2) 409411 7753122 TBA2 LCC01 Lady 410861 7752649 TBA2 Levels* LCC02 Clayre 4 Proterozoic rock 410162 7752550 TBA2 LCC03 (AQ6) 410675 7772955 164 Levels & LEC1 Lady 410356 7772733 165 quality LEC2 Clayre 4 Proterozoic rock 413929 7770241 195 Levels & PSB2 (AQ6) 413457 7768549 196 quality TSFB2 Lady Clayre 4 Proterozoic rock (AQ6) Little Eva Proterozoic rock Little Eva (AQ6) Little Eva Kajabbi Fm limestone (AQ3) Little Eva Proterozoic rock (AQ6) Proterozoic rock (AQ6) Permit OFFICIAL Environmental Authority EPML00899613 Bore ID Mining area Hydrostratigraphic Coordinates Surface Screened Monitoring Parameters unit (GDA2020 MGA zone mAHD1 Interval Frequency mAHD TSFC01 Turkey Proterozoic rock 54) 188 34 to 28 Quarterly Levels & TSFC02 Creek (AQ6) Easting Northing 169 40 to 34 Quarterly quality 412657 7771000 TBA2 TBA2 Quarterly Levels & Little Eva Proterozoic rock 411259 7770165 TBA2 TBA2 Quarterly quality
- AQ6
412885 7754274 TBA2 TBA2 Quarterly Levels & SCC01 Scanlan 4 412777 7755060 TBA3 TBA3 Quarterly quality Proterozoic rock 412109 7753600 -27 to - Quarterly Levels & SCC02 Scanlan 4 (AQ6) 413159 7756329 33 TBA2 Quarterly quality 173 -31 to -37 Quarterly Levels & SCC03 Scanlan 4 Proterozoic rock 411852 7773225 204 184 to 54 Quarterly quality
- AQ6
412274 7772441 159 149 to 146 Quarterly SCC04 Scanlan 4 409703 7752084 159 151 to 148 Quarterly Levels & Proterozoic rock 410501 7776032 159 150 to 144 Quarterly quality TCKRC01 Turkey (AQ6) 410391 7775489 161 149 to 134 Quarterly Levels & TCKRC02 Creek 410444 7775038 151 quality Proterozoic rock 410132 7775721 151 5 to -1 Levels & LC048 Turkey (AQ6) 407810 7780352 190 -359 to -419 quality Creek 407821 7780342 190 179 to 173 Proterozoic rock 404496 7761669 190 Levels & Lady (AQ6) 404475 7761667 151 -82 to -90 quality Clayre 404486 7761677 164 -129 to -201 Proterozoic rock 400153 7784109 166 Levels & NBC01 Graben (AQ6) 410333 7772396 166 TBA2 quality 410154 7772080 162 132 to 114 Proterozoic rock 410168 7772073 157 to 154 Levels &
- AQ6
410388 7771508 -68 to -74 quality 161 to 160 Alluvium (AQ1) Levels & quality NBC02 Graben Alluvium/Colluvium Levels & NBMB008 Graben Wallumbilla Fm quality (AT1) Levels* NBMB009 Graben Alluvium/Colluvium CS1 - Graben Kajabbi Fm Quarterly Levels* AT2 Graben mudstone (AT2) Quarterly Graben Quarterly Levels & CS1 - Graben Kajabbi Fm quality AQ4 Graben sandstone (AQ4) Graben Levels* CS3 - Alluvium (AQ1) AQ1 Quarterly Levels* Kajabbi Fm CS3 - mudstone (AT2) Quarterly Levels AT2 Kajabbi Fm CS3 - sandstone (AQ4) AQ4 TBC - nominal CS2 coordinates LER1016 Little Eva Proterozoic rock Quarterly Levels (AQ6) LEC3A Little Eva Alluvium (AQ1) Quarterly Levels and quality LEC3B Little Eva Graben sediments Quarterly Levels* -TBA LEC4A Little Eva Alluvium (AQ1) Quarterly Levels and quality Permit OFFICIAL Environmental Authority EPML00899613 Bore ID Mining area Hydrostratigraphic Coordinates Surface Screened Monitoring Parameters unit (GDA2020 MGA zone mAHD1 Interval Frequency mAHD 54) Easting Northing LEC4B Little Eva Proterozoic rock 410372 7771513 166 2 to -4 Quarterly Levels and
- AQ6
quality LEC5 Little Eva Proterozoic rock 411203 7773475 164 125 to 119 Quarterly Levels and
- AQ6
quality TCMB01 Turkey Proterozoic rock 412189 7771547 178 -35 to -41 Quarterly Levels and Creek (AQ6) quality TCMB02 Turkey Proterozoic rock 412802 7771634 181 37 to 31 Quarterly Levels and Creek (AQ6) quality BC277 Blackard Proterozoic rock 412739 7764649 191 171 to 121 Quarterly Levels and
- AQ6
quality BCR474 Blackard Proterozoic rock 412174 7766696 184 164 to 60 Quarterly Levels and
- AQ6
quality BCR773 Blackard Proterozoic rock 413007 7765002 187 167 to 126 Quarterly Levels and
- AQ6
quality SC030 Scanlan Proterozoic rock 412395 7754050 194 174 to 88 Quarterly Levels and
- AQ6
quality SC040 Scanlan Proterozoic rock 412217 7754110 194 174 to -8 Quarterly Levels and LEI01 Little Eva (AQ6) quality Interpretation Bores Proterozoic rock 4 to -2 Quarterly Levels &
- AQ6
413080 7772084 178 quality LEI02 Little Eva Alluvium (AQ1) 407557 7768896 TBA2 TBA2 Quarterly Levels & 414416 7767457 TBA2 TBA2 Quarterly quality BEDI01 Bedford 4 Proterozoic rock 410511 7753440 TBA2 TBA2 Quarterly LCI01 (AQ6) 412086 7755788 TBA2 TBA2 Quarterly Levels & SCI01 Lady 411436 7754822 TBA2 TBA2 Quarterly quality Clayre 4 Proterozoic rock
- AQ6
Levels & Scanlan 4 quality Proterozoic rock SCI02 Scanlan 4 (AQ6) Levels & quality Proterozoic rock
- AQ6
Levels & quality Notes: *Levels only for regulatory purposes. Groundwater quality should also be collected to validate graben conceptualisation. 1 RL must be measured to the nearest 5cm from the top of the bore casing. 2 TBA values - refer to Condition G50. to be provided to the administering authority six (6) months prior to the commencement of mining activities in each mining area. 3 TBA value - refer to Condition G50. To be provided to the administering authority six (6) months prior to the commencement of mining activities in each mining area. 4 Future bore as described by Condition G48. Permit OFFICIAL Environmental Authority EPML00899613
- G51
Groundwater samples obtained from compliance bores specified in Schedule G - Table 9 (Groundwater Monitoring Locations and Frequency) must not exceed the Limit A specified in Schedule G - Table 10 (Groundwater Quality Limits) on any five (5) consecutive sampling occasions.
- G52
Groundwater samples obtained from compliance bores specified in Schedule G - Table 9 (Groundwater Monitoring Locations and Frequency) must not exceed the Limit B specified in Schedule G - Table 10 (Groundwater Quality Limits) on any three (3) consecutive sampling occasions.
- G53
If groundwater from compliance bores identified in Table 9 - Groundwater monitoring locations and frequency exceed the Contaminant Limits specified in Table 10 - Groundwater quality limits on five (5) consecutive monitoring occasions for Limit A and/or three (3) consecutive monitoring occasions for Limit B, the holder of the Environmental Authority must notify the administering authority via WaTERS and the Pollution Hotline within 24 hours of receiving the third and/or fifth consecutive exceedance result.
- G54
If monitoring results from water quality compliance bores listed in Table 9 - Groundwater monitoring locations and frequency, exceed the corresponding limit specified in Table 10 - Groundwater quality limits on five (5) consecutive monitoring occasions for Limit A and/or three (3) consecutive monitoring occasions for Limit B, the holder of this Environmental Authority must: (a) within three (3) months of receiving the fifth for Limit A or third for Limit B consecutive exceedance, complete, and submit via WaTERS, an investigation undertaken by a suitably qualified person outlining: (i) details of the investigations carried out, (including but not limited to all monitoring results obtained as part of the investigation); (ii) whether the exceedance is a result of activities authorised under this environmental authority and, if so; (iii) whether environmental harm has occurred; and (iv) any action required to mitigate environmental harm. If for unforeseen technical reasons WaTERS is unavailable, please contact the Pollution Hotline. Schedule G - Table 10 (Groundwater Quality Limits) Aquifer Parameter3 Unit Limit type Bores Limit A - Limit B - derived from derived from All bores 80th percentile1 NBMB009 95th All remaining percentile2 bores pH pH units Range All bores 6.50-8.50 - All bores Maximum All bores 2238 2394 All bores EC (Field) -S/cm Maximum All bores 1210 1289 Maximum All bores Aluminium mg/L Maximum All bores - 0.055 Alluvial (AQ1) Arsenic mg/L Maximum - 0.013 mg/L Maximum - 0.0002 Cadmium mg/L Maximum - 0.001 Chromium mg/L Maximum - 0.0014 Cobalt mg/L 0.003 0.005 Copper mg/L - 1.22 Fluoride Permit OFFICIAL Environmental Authority EPML00899613 Aquifer Parameter3 Unit Limit type Bores Limit A - Limit B - derived from derived from Maximum All bores 80th percentile1 Maximum All bores 95th Maximum NBC01 and percentile2 Maximum NBC02 Iron (Total) mg/L Maximum NBMB009 - 0.284 Lead mg/L Maximum All bores Maximum All bores - 0.0034 Maximum All bores All bores 0.012 0.040 Maximum All bores Manganese mg/L NBC01 and Maximum NBC02 Mercury mg/L Maximum NBMB009 0.069 0.078 Molybdenum mg/L All remaining - 0.0006 Nickel mg/L bores 0.005 Selenium mg/L All bores 0.004 0.006 Silver mg/L All bores 0.004 0.005 0.00106 - 46 0.00018 41 Sulphate mg/L 465 565 - 464 Total Nitrogen mg/L 3.9 4.3 Total mg/L 0.19 0.70 Phosphorus Uranium mg/L Maximum NBC01 and 0.0221 0.0253 Maximum NBC02 NBMB009 0.0028 0.0046 All remaining 0.02304 0.02534 bores Zinc mg/L NBC01 and 0.150 0.205 NBC02 NBMB009 0.192 0.275 All remaining 0.1424 0.2254 bores Major ions All bores For interpretation purposes only (excluding sulphate) All bores DOC Permit OFFICIAL Environmental Authority EPML00899613 Aquifer Parameter3 Unit Limit type Bores Limit A - Limit B - derived from derived from Range All bores 80th percentile1 Maximum LE bores 95th TSF Process percentile2 Maximum bores pH pH units Maximum TCK bores 6.50-8.50 - Maximum BLK bores EC -S/cm Maximum All bores 36204 4170 Maximum All bores Maximum All bores 9454 9784 All bores Aluminium mg/L Maximum All bores 21084 22364 mg/L LE bores 37184 41624 Arsenic mg/L Maximum TSF Process 0.02 0.04 mg/L Maximum bores 0.008 0.018 Cadmium mg/L Maximum TCK bores 0.0002 0.0004 mg/L Maximum BLK bores 0.001 0.002 Chromium Maximum LE bores 0.001 0.002 mg/L Maximum TSF Process 0.005 0.012 Cobalt Maximum bores 0.005 0.007 Maximum TCK bores Proterozoic Copper Maximum BLK bores 0.004 0.006 rock aquifer Fluoride All bores 0.091 0.2024 All bores 2.5 3.7
- AQ6
- All bores 1.2 1.3 Northern All bores mining areas All bores (LE, BLK, All bores All bores TCK, All bores TSF/plant) LE bores Iron (Total) mg/L 4.14 4.64 Lead mg/L 5.04 5.54 Manganese mg/L 0.07 0.33 Mercury mg/L 0.001 0.002 Molybdenum mg/L 0.486 1.428 Nickel mg/L 0.00005 Selenium mg/L - 0.045 Silver mg/L 0.019 0.002 Sulphate mg/L 0.001 0.0104 0.00005 - 731 - 627 Permit OFFICIAL Environmental Authority EPML00899613 Aquifer Parameter3 Unit Limit type Bores Limit A - Limit B - derived from derived from Maximum TSF Process 80th percentile1 Maximum bores 95th TCK bores percentile2 BLK bores All bores 11 15 All bores 20 26 220 297 Total Nitrogen mg/L 2.6 3.6 Total mg/L 0.29 0.665 Phosphorus Uranium mg/L Maximum All bores 0.045004 0.148354 Maximum All bores Zinc mg/L All bores 0.0334 0.1474 Major ions For interpretation purposes only (excluding sulphate) DOC All bores All bores Proterozoic pH pH units Range SC bores 6.50-8.50 - rock aquifer Maximum LC bores 37284 45354
- AQ6
- EC -S/cm All bores 562 575 Southern Maximum All bores 0.0104 0.0174 mining areas Aluminium mg/L Maximum All bores 0.0064 0.0294 (SC, LC) Arsenic mg/L Maximum All bores 0.00024 0.00044 Cadmium mg/L Maximum All bores 0.001 Chromium mg/L Maximum SC bores - 0.00204 Cobalt mg/L Maximum LC bores 0.00104 0.38704 Copper mg/L All bores 0.15304 0.0064 Maximum All bores 0.0036 1.3 Fluoride mg/L Maximum All bores 1.1 0.06 Iron (Total) mg/L Maximum All bores 0.05 0.0020 Lead mg/L Maximum All bores 0.0010 0.967 Manganese mg/L Maximum All bores 0.154 0.00005 Mercury mg/L Maximum All bores 0.010 Molybdenum mg/L Maximum SC bores - 0.001 Nickel mg/L Maximum 0.007 0.0194 Selenium mg/L - 0.0154 Permit OFFICIAL Environmental Authority EPML00899613 Aquifer Parameter3 Unit Limit type Bores Limit A - Limit B - derived from derived from 80th percentile1 95th percentile2 LC bores - 0.0104 All bores Silver mg/L Maximum SC bores 0.00005 0.00010 Sulphate mg/L Maximum LC bores All bores 7844 9714 Maximum All bores Maximum 57 59 Total Nitrogen mg/L 1.4 4.44 Total mg/L 0.17 0.46 Phosphorus Uranium mg/L Maximum SC bores 0.05804 0.06604 Maximum LC bores SC bores 0.0240 0.0353 LC bores Zinc mg/L All bores 0.0874 0.1554 0.0124 0.0214 Major ions For interpretation purposes only (excluding sulphate) All bores DOC Notes: 1Limit A is derived from the 80th percentile of site-specific data or a default guideline and relates to any 5 consecutive sampling occasions. 2Limit B is derived from the 95th percentile of site-specific data or a default guideline and relates to any 3 consecutive sampling occasions. 3Both total and dissolved fraction of metals/metalloids are to be monitored. Limits apply to the dissolved component only. 4Interim Limits. As new bores are established, limits must be reviewed to ensure the protection of the groundwater quality, as per condition G55.
- G55
All values identified in accordance with footnote 4 as `interim limits' in Schedule G - Table 10, must be revised, via an amendment application under the Environmental Protection Act 1994, prior to the commencement of mining activities in the mining area where the monitoring bore is located. NOTE: The raw data (at least 24 months) must be provided with the calculated site-specific limit values. Annual Groundwater Monitoring Report
- G56
The holder of this Environmental Authority must complete an annual groundwater monitoring report by 1 June each year and submit this report to the administering authority on request. The report must be prepared by an appropriately qualified person and must address the following requirements as a minimum: (a) analysis of groundwater chemistry and hydrogeological data for all groundwater monitoring bores required in condition (G39); (b) identify exceedance of any contaminant limits listed in Schedule G - Table 10 (Groundwater Quality Levels); (c) historical data analysis and identification of trends that could impact groundwater values; (d) discuss effectiveness of the current groundwater monitoring regime and any improvements that could be made to ensure early detection of impacts to groundwater; (e) detail proposed actions and timeframes to undertake further investigation of potential environmental Permit OFFICIAL Environmental Authority EPML00899613 impacts for any exceedance identified; (f) detail proposed mitigation measures for any detected impact to groundwater resulting from the mining activity; (g) changes in groundwater levels plotted as a function of time to identify seasonal patterns and possible draw-down effects; (h) groundwater elevation contours and flow direction; and (i) interpretation and discussion of exceedance of any contaminant limits listed in Schedule G - Table 10 (Groundwater Quality Levels) and the implications for compliance with this Environmental Authority.
- G57
The method of sampling of groundwater must comply with that set out in the latest edition of the Administering Authority's Water Quality Sampling Manual. Saline, Acid and Metalliferous Drainage
- G58
The holder of this Environmental Authority must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of saline, acid and/or metalliferous mine drainage as a result of the mining activity. Seepage Management
- G59
Prior to placement of waste rock in the Scanlan WRD, the holder must complete the following: (a) geochemical characterisation of proposed waste rock materials for the Scanlan pit, including static and kinetic testing; (b) contaminant transport modelling for the seepage pathway between Scanlan WRD and Dugald River; and (c) installation of a minimum of two groundwater monitoring bores along the modelled seepage pathway between the Scanlan WRD and Dugald River.
- G60
By 30 June 2028, the holder of this Environmental Authority must: (a) incorporate all newly constructed monitoring bores from the 2025-2026 drilling program into the groundwater model history-matching dataset; (b) include a minimum of 24 months of continuous water level data from each new bore before incorporation; and (c) revise the model achievement and history-matching performance for all hydrostratigraphic units compared with 2025 limited calibration data. (d) Address requirements of condition C30 c) and d) as part of the numerical groundwater model update.
- G61
If the revision under condition G60(c) impacts on the predictions of impact and seepage capture zone, a report on the implications and recommended changes to the monitoring network and mitigations measures must be prepared by an AQP and provided to the administering authority within 6 months of completing the revision under G60(c). Water Extraction
- G62
The annual borefield extraction must not exceed the following limits without prior approval from the administering authority: (a) 7,600 ML/year for the first 6 years of borefield operation; and (b) 5,200 ML/year for the remainder of the life of mine. Total combined extraction from all production bores must not exceed the limits specified within the relevant Permit OFFICIAL Environmental Authority EPML00899613 period under (a) or (b) in any water year. END OF CONDITIONS FOR SCHEDULE G Permit OFFICIAL Environmental Authority EPML00899613 SCHEDULE H - SEWAGE TREATMENT Sewage Treatment - for Irrigation
- H1
Treated sewage effluent may only be released to land within the nominated irrigation areas via the locations identified in Schedule H - Table 1 (Sewage Treatment Plant and Effluent Disposal) and in accordance with the contaminant release limits stated in Schedule H - Table 2 (Sewage Effluent Contaminant Release Limits) and the conditions of this Environmental Authority. Schedule H - Table 1 (Sewage Treatment Plant and Effluent Disposal) Coordinates Description (GDA2020 MGA zone 54) Location ML90166 Easting Northing ML90166 STP release 416973 7769234 point 1 STP release 417102 7769689 point 2
- H2
All sewage effluent released to land must be monitored at the frequency and for the parameters specified in Schedule H - Table 2 (Sewage Effluent Contaminant Release Limits). Schedule H - Table 2 (Sewage Effluent Contaminant Release Limits) Contaminant Release limit Limit type Frequency 5 day Biochemical oxygen Weekly demand (BOD) (mg/L) 20 Maximum Total Suspended Solids (mg/L) 30 Maximum Nitrogen (mg/L) 30 10 Maximum Phosphorus 5 50th percentile short term 15 50th percentile long term pH 8 5 Maximum 6.0 - 8.5 50th percentile short term 50th percentile long term Range E coli (Organisms / 100ml) 100 Maximum Fortnightly 1000 Maximum Faecal Coliforms1 (CFU / 100ml)
- H3
Treated sewage effluent must only be dispersed in accordance with the following outcomes: (a) efficient application of effluent utilising best practice methods; (b) control of sodicity in the soil; (c) minimal degradation of soil structure; (d) control of the build-up of nutrients and heavy metals in the soil and subsoil from effluent and other sources; (e) prevention of: (i) subterranean flows of effluent to waters; (ii) impacts on the groundwater resource through infiltration; (i) run-off of effluent or seepage from disposal areas by limitation of application rates and the use of structures such as bunds and catch dams; (iii) surface ponding; (iv) spray drift or overspray from effluent disposal areas; (v) and damage to native vegetation; (f) provide prominent signage, in areas irrigated with effluent and which are accessible to the employees and general public, advising that effluent should not be consumed or used; (g) maximise health and safety protection in relation to effluent handling and irrigation; and Permit OFFICIAL Environmental Authority EPML00899613 (h) irrigation areas are adequately identified. Note: The rate of effluent irrigation will be dependent on the soil water / nutrient capacity and net available annual average solar evaporation and evapotranspiration rates for the region.
- H4
When circumstances prevent the irrigation or beneficial reuse of treated sewage effluent such as during or following rain events, waters must be directed to a wet weather storage or alternative measures must be taken to store or lawfully dispose of effluent.
- H5
The daily volume of effluent released to land must be measured and records kept of the volumes of effluent released. Sewage Treatment Management Plan
- H6
A Sewage Treatment Management Plan that provides for the proper and effective management of actual and potential environmental impacts resulting from the operation of sewage treatment plants must be developed prior to commencement of mining activities to ensure compliance with the conditions of the Environmental Authority.
- H7
The Sewage Treatment Management Plan required in condition H6 must include but not be limited to: (a) a topographical map of suitable scale clearly showing the licensed place and surrounding land likely to be affected by the sewage treatment plants along with the location of any sensitive receptors; (b) a site plan including the Q100 flood level in conjunction with the licensed place boundaries and infrastructure, buffer zones and irrigation areas; (c) detail on any potential impact on groundwater and surface water from the discharge of effluent; (d) strategies for managing and minimising the impact on surface water and groundwater; (e) modelling to determine the irrigation frequency, application rate and minimum irrigation area to minimise environmental harm; and (f) proposed surface and groundwater monitoring to identify any impacts from the irrigation of treated effluent. Alarms
- H8
Sewage treatment infrastructure must be fitted with stand-by pumps and pump-failure alarms as well as high level alarms to warn of imminent overflow. END OF CONDITIONS FOR SCHEDULE H Permit OFFICIAL Environmental Authority EPML00899613 SCHEDULE I - DEFINITIONS Key terms and/or phrases used in this document are defined in this section. Where a term is not defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies must be used. If a word remains undefined it has its ordinary meaning. "50th percentile long term" means that not more than twenty-six (26) of the measured values of the quality characteristic are to exceed the stated release limit for any fifty-two (52) consecutive samples where: (a) the consecutive samples are taken over a one (1) year period; (b) the consecutive samples are taken at approximately equal periods; and (c) the time interval between the taking of each consecutive sample is not less than three (3) days or greater than eleven (11) days. "50th percentile short term" means not more than five (5) of the measured values of the quality characteristic are to exceed the stated release limit for any ten (10) consecutive samples for a release/monitoring point at any time during operation. "acceptance criteria" means the measures by which actions implemented are deemed to be complete. The acceptance criteria indicate the success of the decommissioning and rehabilitation outcomes or remediation of areas which have been significantly disturbed by the environmentally relevant activities. Acceptance criteria may include information regarding: (a) stability of final land forms in terms of settlement, erosion, weathering, pondage and drainage; (b) control of geochemical and contaminant transport processes; (c) quality of runoff waters and potential impact on receiving environment; (d) vegetation establishment, survival and succession; (e) vegetation productivity, sustained growth and structure development; (f) fauna colonisation and habitat development; (g) ecosystem processes such as soil development and nutrient cycling, and the re-colonisation of specific fauna groups such as collembola, mites and termites which are involved in these processes; (h) microbiological studies including re-colonisation by mycorrhizal fungi, microbial biomass and respiration; (i) effects of various establishment treatments such as deep ripping, topsoil handling, seeding and fertiliser application on vegetation growth and development; (j) resilience of vegetation to disease, insect attack, drought and fire; (k) vegetation water use and effects on ground water levels and catchment yields. "acid and metalliferous mine drainage (AMD)" means any contaminated release emanating from a mining operation formed through a series of chemical and biological reaction, when geological strata is disturbed and exposed to oxygen and moisture as a result of the mining activity. "acid rock drainage (ARD)" means any contaminated release emanating from a mining activity formed through a series of chemical and biological reactions, when geological strata is disturbed and exposed to oxygen and moisture as a result of the mining activity. Environment and Resource Management) or its successor. "affected land" means land on which an event has caused or threatens serious or material environmental harm. "affected person" is someone whose drinking water can potentially be impacted as a result of discharges from a dam or their life or property can be put at risk due to dwellings or workplaces being in the path of a dam break flood. Permit OFFICIAL Environmental Authority EPML00899613 "air blast overpressure" means energy transmitted from the blast site within the atmosphere in the form of pressure waves. The maximum excess pressure in this wave, above ambient pressure is the peak air blast overpressure measured in decibels linear (dBL). "ambient (or total) noise" at a place, means the level of noise at the place from all sources (near and far), measured as the Leq for an appropriate time interval. "Annual Exceedance Probability" or "AEP" the probability that at least one event in excess of a particular magnitude will occur in any given year. "ANZECC 2000" means Australian and New Zealand Environment Conservation Council Marine and Freshwater Quality Guidelines. "ANZG 2018" means the Australian and New Zealand Guidelines for Fresh and Marine Water Quality (Water Quality Guidelines) revised in 2018. Since 2018, the Water Quality Guidelines are presented in an interactive online platform at "www.waterquality.gov.au/guidelines". All default guideline values (DGVs) published on this interactive resource are referred to as ANZG (2018) irrespective of their official publication date. Some guidelines in ANZG (2018) still refer to ANZECC (2000). These are considered ANZG (2018). "appropriately qualified person" means a person who has professional qualifications, training, skills and experience relevant to the nominated subject matter and can give authoritative assessment, advice and analysis on performance relative to the subject matter using the relevant protocols, standards, methods or literature. "assessed" and "assessment" by a suitably qualified and experienced person in relation to a consequence assessment of a structure, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an