Minerals environmental authority

EPML00770913 · LION MINING PTY LTD

Minerals environmental authority EPML00770913 (LION MINING PTY LTD), Granted. 174 conditions indexed. Holds PRC plan P-PRCP-100761237.

Status
Granted
Holders
LION MINING PTY LTD
Tenures
ML3219; ML3221; ML3223; ML3224; ML3227; ML3228; ML3229; ML3230; ML3231; ML3232; ML3234; ML3243; ML80024; ML80088; ML80089; ML80114; ML80120; ML80144
PRC plan
P-PRCP-100761237 · effective 2026-04-07
How it was read
Numbered conditions, partial, plus page text
Register
Register record · Instrument PDF

Conditions

174 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm.

  2. A2

    Contaminants with the potential to cause environmental harm must not be released directly or indirectly to the receiving environment, except as permitted under the conditions of this environmental authority.

  3. A3

    The environmental authority holder must ensure that the activity is carried out in accordance with Table A1 and Schedule J - Figure 1 Location of authorised disturbance and Schedule J - Figure 2 Location of authorised disturbance including proposed footprint of TSF2 Stage 3B, 4 and 5. Table A1 - Authorised disturbance (`Table A1') Mine Mine Feature Name Location1 Maximum Disturbance Domain (MGA94, Zone 56) Area (Hectares) Central Peg Coordinates Dams and Mine Water Ponds, Roses 11.05 Diversions Pride Mine Ponds, TSF2 225510, 7200245 Diversion Drain (including 224200, 7202780 53.6 Waste Rock northern and southern 223300, 7202250 123 Dump diversion drains), TSF2 223617, 7201914 3 (WRD) and Southern Drain 223050, 7202506 2.1 Ore Extension, 223769, 7202411 19 Stockpiles Stage 3A ESCP 223575, 7201900 5.4 Diversions and Dams 17.88 Storage Drain 226490, 7201040 Facility Stage 3B Southern 228172, 7200419 (TSF) Diversion Drain 224310, 7202740 Golden Plateau 225790, 7200160 Run of Mine Central Extended 226240, 7200150 (ROM) Golden Mile 223300, 7202250 Processing Roses Pride WRD 227250, 7199670 Area Main Portal WRD 227230, 7199820

    page 6Regulated structures, Waste
  4. A4

    The environmental authority holder must: a) Install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) Maintain such measures, plant and equipment in a proper and efficient condition; c) Operate such measures, plant and equipment in a proper and efficient manner; and d) Ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated.

    page 8Monitoring and reporting
  5. A5

    Notwithstanding any other condition of this environmental authority, the holder must not cause mining disturbance unless and until such time as that disturbance has an associated rehabilitation outcome provided for in the relevant PRCP Schedule. Monitoring

    page 8Rehabilitation, Monitoring and reporting
  6. A6

    All monitoring data, records and reports required by this environmental authority or related to environmental management of the activities must be: a) Carried out by an appropriately qualified person, periodically reviewed and updated as required to reflect operational or environmental changes; b) Kept for a period of not less than five (5) years; c) Provided to the administering authority in the specified format within 10 business days of a request; and d) Undertaken in accordance with the most recent version of any applicable standard or guideline for the activity.

    page 8Monitoring and reporting
  7. A7

    The following information must be recorded in relation to all monitoring required under a condition of this environmental authority: a) The date and time when the sample was taken; b) The location where the sample was taken; and c) Any other pertinent details of relevance to interpreting the sampling results (i.e. stream flow, wind conditions or any unusual observations such as odour or colouration).

    page 8Air, Monitoring and reporting
  8. A8

    The environmental authority holder must implement all reasonable measures necessary to conduct monitoring required under a condition of this environmental authority. Note: `Reasonable measures' could include establishing and maintaining safe all-weather access to a monitoring location by upgrading roads/tracks, use of suitable automated sampling devices, developing alternative routes or utilising alternative transport. Risk management

    page 8Monitoring and reporting
  9. A9

    The environmental authority holder must develop and implement a risk management system for mining activities which mirrors the content requirement of the Standard for Risk Management (ISO31000:2009), or the latest edition of an Australian standard for risk management, to the extent relevant to environmental management, by 20 December 2021. Notification of emergencies, incidents and exceptions

    page 8Monitoring and reporting
  10. A10

    The environmental authority holder must notify the administering authority within 24 hours of becoming aware of any emergency, incident, sample result or event which does or may contravene a condition of this environmental authority.

    page 8Monitoring and reporting
  11. A11

    Within 10 business days following the initial notification of an emergency, event or incident, or receipt of monitoring results, whichever is the latter, further written advice must be provided to the administering authority, including the following: Permit OFFICIAL Environmental Authority EPML00770913 a) Results and interpretation of any samples taken and analysed; b) Outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and c) Proposed actions to prevent a recurrence of the emergency or incident. Complaints

    page 8Monitoring and reporting
  12. A12

    The environmental authority holder must record all environmental complaints received about the mining activities including: a) Name, address and contact number for of the complainant; b) Time and date of complaint; c) Reasons for the complaint; d) Investigations undertaken; e) Conclusions formed; f) Actions taken to resolve the complaint; g) Any abatement measures implemented; and h) Person responsible for resolving the complaint.

    page 9Monitoring and reporting
  13. A13

    When requested by the administering authority, the environmental authority holder must undertake specified monitoring within the timeframe nominated by the administering authority, to investigate any complaint related to the activity. Third-party reporting

    page 9Monitoring and reporting
  14. A14

    The environmental authority holder must: a) By 30 June 2023, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) Obtain further such reports at regular intervals, not exceeding three (3) yearly intervals, from the completion of the report referred to above; and c) Provide each report to the administering authority within 90 days of its completion.

    page 9Monitoring and reporting
  15. A15

    Disturbance due to exploration activities in areas not scheduled to be mined must be rehabilitated in accordance with provisions detailed in the administering authority's Code of Environmental Compliance for Exploration and Mineral Development Projects (the Code). Where there is a discrepancy between the Code and this environmental authority, the conditions of the environmental authority apply. END OF CONDITIONS FOR SCHEDULE A Permit OFFICIAL Environmental Authority EPML00770913 Schedule B - Air

    page 9Rehabilitation
  16. C1

    All waste generated as part of the mining activities must be disposed of in a lawful manner at an off-site facility, with the exception of: a) Waste rock and tailings, which must be characterised, handled and disposed of or used in accordance with condition C4 of this environmental authority; b) Timber pallets; c) Used rubber mill liners, milled plastic trash, rock chips in plastic bags (from exploration drilling), and explosives packaging and consumables comprising cardboard, plastic bags, plastic hoses and associated consumables that are free of explosives, may be disposed of in the tailings dam subject to C5; and d) Tyres, subject to condition C3. Note: The only waste authorised to be burnt on site is explosive boxes, so long as the burning does not cause environmental harm.

    page 11Regulated structures, Waste
  17. C2

    General waste must only be disposed of into the waste disposal trench facility of ML80089 and identified in Schedule J Figure 3 - Waste Disposal Trench ML80089.

    page 11Waste
  18. C3

    Subject to demonstrating to the administering authority that no other use higher in the waste management hierarchy can be practicably implemented, waste tyres generated from mining activities may be disposed of on site in non-acid forming waste rock dumps or underground stopes.

    page 11Waste
  19. C4

    All waste rock and tailings must be: a) Geochemically characterised and disposed of, or used, in a manner that minimises the potential generation and/or release of contaminants to the receiving environment; and b) Where the geochemical characteristics of waste rock is uncertain, this material must be treated as potentially acid and metalliferous drainage forming until demonstrated otherwise; and c) Where the geochemical characterisation demonstrates that waste rock is benign waste rock it may be used on site for rehabilitation activities in accordance with the conditions of this environmental authority; and d) Details pertaining to meeting the requirements of this condition must be recorded and retained until this environmental authority is surrendered.

    page 11Rehabilitation, Waste
  20. C5

    The location of the waste mentioned in condition C1(c) and (d) in the tailings dam must be recorded and made available to the administering authority on request.

    page 11Regulated structures, Waste
  21. C6

    The holder of the environmental authority must develop and implement a waste rock management plan, certified by an appropriately qualified person that the plan is compliant with the conditions in this environmental authority and in accordance with best practice environmental management.

    page 11Waste
  22. C7

    The waste rock management plan must demonstrate that the use and disposal of waste rock will ensure an outcome that is safe, non-polluting, self-sustaining, geotechnically and geochemically stable. The waste rock management plan must include: a) Geochemical characterisation that includes: i. an assessment of the likelihood to produce acid and metalliferous drainage; and ii. an assessment of the metal / metalloids listed in Table E7* (excluding cyanide) and their mobility; b) selective handling techniques to ensure placement, disposal and use of waste rock is according to characterisation results, use and disposal strategies; c) a program of progressive characterisation of waste rock to validate selective handling techniques, use and disposal strategies; d) records of all waste rock characterisation and its final use; e) contingency planning for the management of contaminated drainage (including acid and metalliferous drainage); Permit OFFICIAL Environmental Authority EPML00770913 f) a materials balance, use and disposal plan demonstrating how waste rock will be selectively placed and/or encapsulated to minimise the generation of contaminated drainage (including acid and metalliferous drainage); g) a regular review process to ascertain the performance of the plan; and h) monitoring to confirm that the use and disposal of the material will ensure an outcome that is safe, non- polluting, self-sustaining, geotechnically and geochemically stable. *Note: Reference to Table E7 is a reference to the quality characteristics and not the contaminant limits.

    page 11Waste, Monitoring and reporting
  23. C8

    The waste rock management plan must be provided to the administering authority upon request. Sewage Treatment

    page 12Waste
  24. C9

    All effluent released from the sewage treatment facilities must be monitored at the frequency and for the parameters specified in Table C1 - Sewage effluent quality targets for dust suppression, irrigation or recycling. Table C1 - Sewage effluent quality targets Quality Release limit Units Limit type Monitoring characteristics 6.5 to 8.5 pH Units Range frequency pH Monthly Nitrogen 30 mg/L Maximum Monthly Phosphorus 15 mg/L Maximum Monthly E. coli 1000 Organisms/100mL Maximum Monthly

    page 12Air, Monitoring and reporting
  25. C10

    Sewage effluent used directly from the sewage treatment facilities for dust suppression, irrigation or recycling must not exceed sewage effluent release limits defined in Table C1 - Sewage effluent quality targets.

  26. C11

    Sewage effluent used for dust suppression or irrigation must not cause spray drift or over spray to any sensitive or commercial place.

  27. C12

    Sewage effluent from sewage treatment facilities not used for dust suppression or irrigation must be reused or evaporated.

  28. C13

    Solids that accumulate in the sewage treatment facilities (including the evaporation pond) are to be removed by an appropriately licensed regulated waste transporter and disposed of under the terms and conditions of the licence.

    page 12Waste
  29. C14

    Sewage effluent irrigation areas must have a separation distance of at least thirty (30) metres from any groundwater bores and surface waters.

    page 12Groundwater, Surface water
  30. C15

    The irrigation of treated effluent must be carried out in a manner such that: a) Vegetation is not damaged; b) Soil erosion and soil structure damage is avoided; c) There is no surface ponding of treated effluent; d) Percolation of treated effluent beyond the plant root zone is minimised; e) The capacity of the land to assimilate nitrogen, phosphorus, salts, water and organic matter (as measured by oxygen demand) is not exceeded; and f) The quality of groundwater is not adversely affected.

    page 12Groundwater, Land and soil, Biodiversity
  31. C17

    Notices must be prominently displayed on any treated effluent irrigation area warning staff and the public that the area is irrigated with treated effluent and not to use or drink the treated effluent. These notices must be maintained in a visible and legible condition. Permit OFFICIAL Environmental Authority EPML00770913

  32. C17

    The daily volume of contaminants released to land must be determined by an appropriate method, for example a flow meter and records kept of such determinations. END OF CONDITIONS FOR SCHEDULE C Permit OFFICIAL Environmental Authority EPML00770913 Schedule D - Noise Noise limits

    page 13Noise and vibration, Monitoring and reporting
  33. D1

    The environmental authority holder must ensure that noise generated by the mining activities does not cause the criteria in Table D1 to be exceeded at a sensitive place or commercial place. Table D1 - Noise Limits ('Table D1') (includes construction activities) Noise level dB(A) measured as: All days 7am to 6pm 6pm to 10pm 10pm to 7am Noise measured at a `Noise sensitive place' LAeq, adj, 1 hr 42 42 35 LA1, adj, 1 hr 52 52 47 Noise measured at a `Commercial place' Noise level dB(A) measured as: All days 7am to 6pm 6pm to 10pm 10pm to 7am 42 LAeq, adj, 1 hr 47 47 Airblast overpressure nuisance

    page 14Noise and vibration
  34. D2

    The environmental authority holder must ensure that blasting does not cause the limits for peak particle velocity and air blast overpressure in Table D2 to be exceeded at a sensitive place or commercial place. Table D2 - Blasting noise and vibration limits (`Table D2') Blasting noise Sensitive place and commercial place criteria and vibration limits Monday to Friday 7am to 6pm Monday to Friday 6pm to 7am, Monday to Friday Saturday, Sunday and Public Sunday and Public Holidays - 6pm to 7am, Sunday Airblast and Public Holidays overpressure Holidays 9am - 6pm Underground Workings Open Cut Pits and Underground - Open Cut Pits Ground vibration 115dB (Linear) Peak for 9 out of 10 No blasting peak particle Workings consecutive blasts initiated and not velocity 115dB (Linear) Peak for 9 out of 10 greater than 120 dB (Linear) Peak No blasting consecutive blasts initiated and not greater than 120 dB (Linear) Peak at any time 5mm/second peak particle velocity at any time for 9 out of 10 consecutive blasts 5mm/second peak particle velocity and not greater than 10 mm/second for 9 out of 10 consecutive blasts peak particle velocity at any time and not greater than 10 mm/second peak particle velocity at any time Permit OFFICIAL Environmental Authority EPML00770913 Monitoring and reporting

    page 14Noise and vibration, Monitoring and reporting
  35. D3

    All monitoring of noise emissions from the activity must be undertaken in accordance with the most recent Standard and the Environmental Protection Regulation 2019 (Chapter 5, Part 4).

    page 15Noise and vibration, Monitoring and reporting
  36. D4

    Noise monitoring and recording must include the following descriptor characteristics and matters: a) L (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins) AN,T b) background noise LA90 c) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels d) atmospheric conditions including temperature, relative humidity and wind speed and directions e) effects due to any extraneous factors such as traffic noise f) location, date and time of monitoring g) if the complaint concerns low frequency noise, Max LpLIN,T and one third octave band measurements in dB(LIN) for centre frequencies in the 10 - 200 Hz range. Note: Noise and blast monitoring as required by the administering authority in accordance with Schedule A - condition A13 END OF CONDITIONS FOR SCHEDULE D Permit OFFICIAL Environmental Authority EPML00770913 Schedule E - Water

    page 15Noise and vibration, Monitoring and reporting
  37. E1

    Contaminants that will or have the potential to cause environmental harm must not be released directly or indirectly to any waters except as permitted under the conditions of this environmental authority.

  38. E2

    The release of contaminants to waters must only occur from the release points specified in Table E1 - Contaminant Release Points, Sources and Receiving Waters. Table E1 - Contaminant Release Points, Sources and Receiving Waters Release Point Location Contaminant Source and Monitoring Point Receiving waters (RP) (GDA94, Zone 56) Location description Easting Northing

    page 16Surface water, Monitoring and reporting
  39. SW11

    228 381 E 7 201 255 N Historical waste dump ML3228 Mid point of dam Boughyard Creek

    page 16Regulated structures, Waste
  40. SW13

    226 520 E 7 199 870 N Ore treatment plant collection Mid point of dam Boughyard Creek

    page 16Regulated structures
  41. SW14

    225 435 E 7 200 148 N dam

    page 16Regulated structures
  42. SW16

    226 050 E 7 200 222 N TSF Spillway Orange Creek Decline/ workshop/admin area Mid point of dam Orange Creek collection dams Orange Creek Treated effluent Sewage treatment plant tank TSF seepage collection dam Mid point of dam Orange Creek

    page 16Regulated structures
  43. SW20

    227 151 E 7 199 782 N Tailings Dam 2 sediment dam Mid point of dam Boughyard Creek

    page 16Regulated structures, Waste, Land and soil
  44. SW32

    224 180 E 7 202 790 N Tailings Dam 4 seepage Mid point of dam Orange Creek

    page 16Regulated structures, Waste
  45. SW35

    228 360 E 7 199 210 N Historical tailings spill ML3219 SE end of Boughyard Creek ML3234

    page 16Waste
  46. SW36

    228 670 E 7 199 670 N Historical workings on ML3219 South end of Boughyard Creek ML3219 Waterfall

  47. SW37

    228 050 E 7 201 662 N Historical waste dump upstream of Boughyard Creek Klan's Dam SW19 1 The release of contaminants from release point SW33 must not occur after the spillway is relocated to (GDA94 Zone 56): 226 859 E, 7 202 034 N).

    page 16Surface water, Regulated structures, Waste
  48. E3

    The release of contaminants to waters must not exceed the release limits stated in Table E2 - Contaminant Release Limits, when measured at the monitoring points specified in Table E1 - Contaminant Release Points, Sources and Receiving Waters for each quality characteristic. Permit OFFICIAL Environmental Authority EPML00770913 Table E2 - Contaminant Release Limits Quality Characteristic Interim Release Release Future Release Limits from 31 December 2012. Note: Monitoring Limits Limits - These future limits will apply from a yet to be negotiated Frequency

    page 16Surface water, Monitoring and reporting
  49. SW13

    and date using alternative numbers that will be derived from

  50. SW33

    the information gathered by any combination of the Orange following: Creek Catchment (1) the results of near field monitoring, (2) any studies or investigations carried out in accordance with recommendations 2 & 3 of the Cumulative Impact Study on water quality in the Fitzroy River Basin. (3) any review of the QLD Water Quality Guidelines. (4) other relevant information Note: This information should be available by the end of 2012 if not before and when it becomes available limits will be determined for each mine site based on the environmental values to be protected and in accordance with criteria below. Electrical conductivity (uS/cm) 1500 210# Aquatic ecosystem protection (no drinking Daily during water value): release (first pH (pH Unit) 6.5 (minimum) 6.5 -8.5 [2] sample must be 9.0 (maximum) 50 [2] An end-of-pipe limit to achieve in the range 0 to taken within 2 Turbidity (NTU) 10 [2] 1000 EC in the receiving waters. hours of NA* 25 [2] commencement Suspended Solids (mg/L) 200 6.5 (minimum) of release) 400 9.0 (maximum) Sulphate Limit to be determined based on receiving (SO42-) (mg/L) water reference data Cyanide (as un-ionised HCN; measured as [CN]) for = Limit to be determined based on receiving 0.007mg/L (or 7-g/L) water reference data and achievable best Aluminium (mg/L) practice sedimentation control and treatment Arsenic (mg/L) Cadmium (mg/L) 0.007[1] 0.004 [9] 0.007 Chromium(mg/L) Copper (mg/L) 0.055[1] 0.055[1] Iron (mg/L) 0.013[1] Lead (mg/L) Mercury (mg/L) 0.0002[1] Nickel (mg/L) Zinc (mg/L) 0.001[1] Boron (mg/L) Cobalt (mg/L) 0.002[1] 0.0034[1] Limit to be determined based on receiving Daily during Manganese(mg/L) 0.3[1] water reference data. release (first sample must be Molybdenum (mg/L) 0.01[3] Limit to be determined based on receiving taken within 2 Selenium (mg/L) water reference data. hours of Silver (mg/L) 0.0002 [5] 0.0006[1] commencement Uranium (mg/L) 0.0014[1] of release). Vanadium (mg/L) 0.011[1] Ammonia (mg/L) 0.008[1] Daily during 0.37[1] release (first Nitrate (mg/L) sample must be Petroleum hydrocarbons (mg/L) 0.09[4] taken within 2 hours of 1.9[1] commencement of release). 0.034[1] 0.01[3] 0.011[1] 0.001[3] 0.00005[10]

    page 17Surface water, Land and soil, Monitoring and reporting
  51. SW13

    and date using alternative numbers that will be derived from

  52. SW33

    the information gathered by any combination of the Orange following: Creek Catchment (1) the results of near field monitoring, (2) any studies or investigations carried out in accordance with recommendations 2 & 3 of the Cumulative Impact Study on water quality in the Fitzroy River Basin. (3) any review of the QLD Water Quality Guidelines. (4) other relevant information Note: This information should be available by the end of 2012 if not before and when it becomes available limits will be determined for each mine site based on the environmental values to be protected and in accordance with criteria below. Petroleum hydrocarbons (C10- 0.1 residue

    page 18Monitoring and reporting
  53. C36

    (mg/L) Fluoride (total) (mg/L) 2 [7] 1.5 [8] NA - not available, * local trigger values need to be developed Note 1. All metals and metalloids must be measured as total (unfiltered) and dissolved (filtered). Limits for metal/metalloids apply if dissolved results exceed trigger. Note 2: LOR - typical reporting for method stated. ICPMS/CV FIMS - analytical method required to achieve LOR. Note 3: Cyanide contaminant release limits apply at release points SW12, SW13, SW16, SW20, SW31, SW38 and SW33 only [1] Limit based on the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018 95% level protection (% species) [2] Limit based on the Environmental Protection (Water) Policy 2009 Dawson River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), including all waters of the Dawson River Sub-basin except the Callide Creek Catchment, September 2011, State of Queensland [3] Limit based on the LOR for ICPMS. [4] Limit based on the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000 moderate reliability for 95% level of protection (% species). [5] For aquatic ecosystem protection, based on LOR for CV FIMS [6] For aquatic ecosystem protection, based on ambient Qld WQ Guidelines (2006) for TN [7] Limit based on the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000 livestock drinking water short term trigger value in irrigation water. [8] Limit based on Queensland Drinking Water Guidelines [9] Limit based on the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018 99% level protection (% species) [10] Note that the LOR for ICPMS for Silver is 0.0001mg/L. # for high flow conditions as per the Environmental Protection (Water) Policy 2009 Dawson River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), including all waters of the Dawson River Sub-basin except the Callide Creek Catchment, September 2011, State of Queensland

    page 18Surface water, Monitoring and reporting
  54. E4

    The release of contaminants to waters from the release points must be monitored at the locations specified in Table E1 - Contaminant Release Points, Sources and Receiving Waters for each quality characteristic and at the frequency specified in Table E2 - Contaminant Release Limits.

    page 18Surface water, Monitoring and reporting
  55. E5

    The environmental authority holder must install, operate and maintain a stream flow gauging station to determine and record stream flows at the locations upstream of each Release Point as specified in Table E3 - Contaminant Release during Flow Events for any receiving water into which a release occurs. Permit OFFICIAL Environmental Authority EPML00770913

    page 18Surface water, Monitoring and reporting
  56. E6

    Notwithstanding any other condition of this environmental authority, the release of contaminants to waters must only take place during periods of natural flow events specified as minimum flow in Table E3 - Contaminant Release during Flow Events for the contaminant release point(s) specified in Table E1 - Contaminant Release Points, Sources and Receiving Waters. Table E3 - Contaminant Release during Flow Events Receiving water Release Point Gauging station Location Minimum Flow in Flow description description (GDA94, Zone 56) Receiving Water recording Required for a Frequency Easting Northing Release Event Boughyard Creek SW12 Gauging Station 229690 E 7200162 N 0.18 m3/sec* Continuous

    page 19Surface water
  57. SW20

    SW25 (Auto) (minimum daily) SW38 Orange Creek SW13 Gauging Station 224842 E 7199786 N 0.63 m3/sec* Continuous

  58. SW14

    SW6 (Auto) (minimum daily) SW16 SW31 SW32 *Based on flow volume data for Orange and Boughyard Creeks provided by Newcrest Operations Limited.

  59. E7

    Contaminant release flow rate must not exceed twenty percent (20%) of receiving water flow rate.

    page 19Surface water
  60. E8

    The daily quantity of contaminants released from each release point must be measured and recorded at the monitoring points in Table E1 - Contaminant Release Points, Sources and Receiving Waters.

    page 19Surface water, Monitoring and reporting
  61. E9

    Releases to waters must be undertaken so as not to cause erosion of the bed and banks of the receiving waters, or cause a material build-up of sediment in such waters.

    page 19Surface water, Land and soil
  62. E10

    The environmental authority holder must notify the administering authority as soon as practicable but no later than six (6) hours of having commenced a release of contaminants to waters. Notification must include the submission of written verification to the administering authority of the following information: a) Release commencement date/time; b) Expected release cessation date/time; c) Release point/s; d) Release volume (estimated); e) Receiving water/s including the natural flow rate; and f) Any details (including available data) regarding likely impacts on the receiving water(s). Note: Notification to the administering authority must be addressed to the Manager and Project Manager of the local administering authority via email or facsimile.

    page 19Surface water, Monitoring and reporting
  63. E11

    The environmental authority holder must notify the administering authority as soon as practicable, (nominally within twenty-four (24) hours after cessation of a release) of the cessation of a release and within twenty-eight (28) days provide the following information in writing: a) Release cessation date/time; b) Natural flow volume in receiving water; c) Volume of water released; d) Details regarding the compliance of the release with the conditions of Department Interest: Water of this environmental authority (i.e. contamination limits, natural flow, discharge volume); e) All in-situ water quality monitoring results; and f) Any other matters pertinent to the water release event Permit OFFICIAL Environmental Authority EPML00770913

    page 19Surface water, Monitoring and reporting
  64. E12

    If the release limits defined in Table E2 - Contaminant Release Limits are exceeded, the environmental authority holder must notify the administering authority within twenty-four (24) hours of receiving the results.

    page 20Monitoring and reporting
  65. E13

    The environmental authority holder must, within twenty-eight (28) days of a release that exceeds the conditions of this environmental authority, provide a report to the administering authority detailing: a) The reason for the release; b) The location of the release; c) All water quality monitoring results; d) Any general observations; e) All calculations; and f) Any other matters pertinent to the water release event.

    page 20Monitoring and reporting
  66. E14

    The quality of the receiving waters must be monitored at the locations specified in Table E5 - Receiving Water Upstream Background Sites and Down Stream Monitoring Points for each quality characteristic and at the monitoring frequency stated in Table E4 - Receiving Waters Contaminant Trigger Levels. Table E4 - Receiving Waters Contaminant Trigger Levels Quality Characteristic Trigger Level Trigger Level (Orange Monitoring Frequency Creek Catchment pH 6.5 - 8.0 SW-OC1: No release - 6.5 - 8.5[5] Monthly. During a release - Electrical Conductivity (S/cm) 1000 340# Daily. All other locations: daily Suspended solids (mg/L) To be determined* 10[3] during the release Sulphate (SO42-) (mg/L) 250 25[5] Aluminium (mg/L) 0.055 Arsenic (mg/L) 0.013 Cadmium (mg/L) 0.0002 Chromium (mg/L) 0.001 Copper (mg/L) 0.002 Cyanide (as un-ionised HCN; 0.007 0.004[2] measured as [CN]) for = 0.3 0.007mg/L (or 7-g/L) Iron (mg/L) Lead (mg/L) 0.01 0.0034[5] Mercury (mg/L) 0.0002 0.0006[5] Nickel (mg/L) 0.011 Zinc (mg/L) 0.008 Boron (mg/L) 0.37 Cobalt (mg/L) 0.09 0.0014[5] Manganese (mg/L) 1.9 Molybdenum (mg/L) 0.034 Selenium (mg/L) 0.01 0.011[5] Silver (mg/L) 0.001 0.00005[6] Uranium (mg/L) 0.001 0.0005[5] Vanadium (mg/L) 0.01 0.006[5] Ammonia (mg/L) 0.9 0.068[4] Nitrate (mg/L) 1.1 NA Total Nitrogen (mg/L) NA 0.5[5]

    page 20Surface water, Monitoring and reporting
  67. SW3

    (Group 1) Orange Creek - upstream of SW31 226000 E 7203500 N

  68. SW17

    (Group 4) 229430 E 7202470 N SW B2 (Group 5) Boughyard Creek - upstream SW19. SW11 230000 E 7201000 N Boughyard Creek - tributary from Golden SW C1 (Group 6) Mile Pit 227350 E 7199250 N Boughyard Creek - upstream of tailings TBA contamination within ML3224 TBA TBA

    page 21Waste
  69. SW41

    Boughyard Creek - upstream of tailings 224258 E 7203593 N storage (TD4) within ML3230 Roses Pride - upstream monitoring location Downstream Monitoring Points

    page 21Waste, Monitoring and reporting
  70. SW9

    (Group 1) Orange Creek - downstream of SW3, SW31 225500 E 7200950 N

  71. SW6

    (Group 2) (TD4), SW13 (CEX), ML3230, ML80024 224842 E 7199786 N

  72. SW6

    (Group 3) Orange Creek - downstream of overflow 224542 E 7199786 N

  73. SW25

    (Group 4) contamination from SW21, SW14, SW15 229690 E 7200162 N (mine workshop and dams), ML80088,

    page 21Regulated structures
  74. SW7

    (Group 5) 229490 E 7198890 N

  75. SW18

    (Group 6) ML80089 228790 E 7197800 N Orange Creek - downstream of overflow contamination from SW1, SW13, SW14, SW15, SW16 Boughyard Creek - SW11, SW19, SW17, downstream of Golden Plateau rock dumps, ML3230, ML3243, ML3228, ML3232, ML3227 Boughyard Creek - downstream of B1, Golden Mile pit, ML3219, ML3232 Boughyard Creek - downstream of historic tailings on ML3234

    page 21Waste
  76. SW9

    (Group 2) Orange Creek - upstream of SW14, SW15, 225500 E 7200950 N SW21

  77. SW1

    (Group 3) Orange Creek - upstream of SW13, 226250 E 7200480 N downstream of SW14, SW15 SW16 SW-OC1 Orange Creek - TSF1 Seepage monitoring 225353 E 7200313 N

    page 21Monitoring and reporting
  78. SW39

    Orange Creek - TSF2 Surface water 222190 E 7203256 N monitoring

    page 21Surface water, Monitoring and reporting
  79. SW40

    Roses Pride - downstream monitoring 222973 E 7203461 N location Note: The data from background monitoring points must not be used where they are affected by releases from other mines. TBA - To be advised following consultation with the administering authority to update Table E2 - Contaminant Release Limits Permit OFFICIAL Environmental Authority EPML00770913

    page 21Monitoring and reporting
  80. E15

    If quality characteristics of the receiving water at the downstream monitoring points exceed any of the trigger levels specified in Table E4 - Receiving Waters Contaminant Trigger Levels during a release event the environmental authority holder must compare the downstream results to the upstream results in the receiving waters and: a) Where the downstream result is the same or a lower value than the upstream value for the quality characteristic then no action is to be taken; or b) Where the downstream results exceed the upstream results complete an investigation in accordance with the ANZECC & ARMCANZ 2000 methodology, into the potential for environmental harm and provide a written report to the administering authority in the next annual return, outlining: i. Details of the investigations carried out; and ii. Actions taken to prevent environmental harm. Note: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with E15(b) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic.

    page 22Surface water, Monitoring and reporting
  81. E16

    The environmental authority holder must develop and implement a REMP for all stages of the activity to monitor, identify and describe any adverse impacts to receiving water environmental values, quality and flows due to the authorised activity. This must include monitoring the effects of the mine on the receiving environment periodically (under natural flow conditions) and while contaminants are being discharged from the site. For the purposes of the REMP, the receiving environment is all underlying groundwaters and the waters of the Dawson River and connected waterways within 15km downstream of the release. The REMP should encompass any sensitive receiving waters or environmental values downstream of the authorised activity that will potentially be directly affected by an authorised release of contaminants.

    page 22Groundwater, Surface water, Monitoring and reporting
  82. E17

    The REMP must address (but not necessarily be limited to) the following: a) Description of potentially affected receiving waters including key communities and background water quality characteristics based on accurate and reliable monitoring data that takes into consideration any temporal variation (e.g. seasonality); b) Description of applicable environmental values and water quality objectives to be achieved (i.e. as scheduled pursuant to the Environmental Protection (Water) Policy 2009); c) Any relevant reports prepared by other governmental or professional research organisations that relate to the receiving environment within which the REMP is proposed; d) Water quality targets within the receiving environment to be achieved, and clarification of contaminant concentrations or levels indicating adverse environmental impacts during the REMP; e) Monitoring for any potential adverse environmental impacts caused by the release; f) Monitoring of stream flow and hydrology; g) Monitoring of toxicants should consider the indicators specified in Table E2 - Contaminant Release Limits to assess the extent of the compliance of concentrations with water quality objectives and/or the ANZECC & ARMCANZ 2000 guidelines for slightly to moderately disturbed ecosystems; h) Monitoring of physical chemical parameters as a minimum those specified in Table E2 - Contaminant Release Limits (in addition to dissolved oxygen saturation and temperature); i) Monitoring biological indicators (for macroinvertebrates in accordance with the AusRivas methodology) and metals/metalloids in sediments (in accordance with ANZECC & ARMCANZ 2000, BATLEY and/or the most recent version of AS5667.1 Guidance on Sampling of Bottom Sediments) for permanent, semi- permanent water holes and water storages; j) The locations of monitoring points (including the locations specified in Table E5 Receiving Water Upstream Background Sites and Down Stream Monitoring Points which are background and downstream impacted sites for each release point); k) The frequency or scheduling of sampling and analysis sufficient to determine water quality objectives and to derive site specific reference values within two (2) years (depending on wet season flows) in Permit OFFICIAL Environmental Authority EPML00770913 accordance with the Queensland Water Quality Guidelines 2009. For ephemeral streams, this should include periods of flow irrespective of mine or other discharges; l) The tailored inclusion of dry season monitoring along Boughyard Creek to ensure water quality and potential impacts of shallow groundwater expressions during the dry season; m) Specify sampling and analysis methods and quality assurance and control; n) Any historical datasets to be relied upon; o) Description of the statistical basis on which conclusions are drawn; and p) Any spatial and temporal controls to exclude potential confounding factors.

    page 22Groundwater, Surface water, Land and soil, Monitoring and reporting
  83. E18

    A report outlining the findings of the REMP, including all monitoring results and interpretations in accordance with condition E17 must be prepared annually and made available on request to the administering authority. This must include an assessment of background reference water quality, the conditions of downstream water quality compared against water quality objectives, and the suitability of current discharge limits to protect downstream environment values.

    page 23Monitoring and reporting
  84. E19

    All determinations of water quality must be: a) Performed by a person or body possessing appropriate experience and qualifications to perform the required measurements; b) Made in accordance with methods prescribed in the latest edition of the administering authority's Water Quality Sampling Manual; c) Collected from the monitoring locations identified within this environmental authority, within ten (10) hours of each other where possible; d) Carried out on representative samples; and e) Laboratory testing must be undertaken using a laboratory accredited (e.g. NATA) for the method of analysis being used. Note: Condition E19 requires the Water Quality Manual to be followed and where it is not followed because of exceptional circumstances this should be explained and reported with the results.

    page 23Monitoring and reporting
  85. E20

    The release of contaminants directly or indirectly to waters: a) Must not produce any visible discolouration of receiving waters; and b) Must not produce any slick or other visible or odorous evidence of oil, grease or petrochemicals nor contain visible floating oil, grease, scum, litter or other objectionable matter.

    page 23Surface water
  86. E21

    The following information must be recorded in relation to all water monitoring required under the conditions of this environmental authority and submitted to the administering authority in the specified format with each annual return: a) The date on which the sample was taken; b) The time at which the sample was taken; c) The monitoring point at which the sample was taken; d) The measured or estimated daily quantity of the contaminants released from all release points; e) The release flow rate at the time of sampling for each release point; f) The results of all monitoring and details of any exceedances with the conditions of this environmental authority; and g) Water quality monitoring data must be provided to the administering authority in the specified electronic format upon request.

    page 23Surface water, Monitoring and reporting
  87. E22

    A Water Management Plan must be implemented and maintained that provides for the proper and effective management of the actual and potential environmental impacts resulting from the mining activity and to ensure compliance with the conditions of this environmental authority.

  88. E23

    The water management plan must include at least the following components: a) Contaminant source study; Permit OFFICIAL Environmental Authority EPML00770913 b) Site water balance and model; c) Water management system; d) Saline drainage prevention and management measures; e) Acid and metalliferous drainage prevention and management measures (if applicable); f) Emergency and contingency planning; and g) Monitoring and review.

    page 23Monitoring and reporting
  89. E24

    Each year the environmental authority holder must undertake a review of the water management plan prior to the wet season (i.e. by 1 November) and a further review following the wet season (i.e. by 1 May the following year) to ensure that proper and effective measures, practices or procedures are in place so that the mine is operated in accordance with the conditions of this environmental authority and that environmental harm is prevented or minimised.

  90. E25

    A copy of the water management plan and/or a review of the water management plan must be provided to the administering authority on request.

  91. E26

    The environmental authority holder must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of saline drainage.

  92. E27

    The environmental authority holder must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of acid and metalliferous drainage.

  93. E28

    An erosion and sediment control plan must be developed by an appropriately qualified person and implemented for all stages of the mining activities on the site to minimise erosion and the release of sediment to receiving waters and contamination of stormwater.

    page 24Surface water, Land and soil
  94. E29

    The maintenance and cleaning of any vehicles, plant or equipment must not be carried out in areas from which contaminants can be released into any receiving waters.

    page 24Surface water
  95. E30

    Any spillage of wastes, contaminants or other materials must be cleaned up as quickly as practicable to minimise the release of wastes, contaminants or materials to any stormwater drainage system or receiving waters.

    page 24Surface water, Waste
  96. E31

    The administering authority and the environmental authority holder both acknowledge that the conditions for release of contaminants to Orange Creek, Boughyard Creek and the Dawson River in this environmental authority have been calculated without the benefit of the findings of projects proposed to be undertaken as per recommendations 2 and 3 of the Study of cumulative impacts on water quality of mining activities in the Fitzroy River Basin (April 2009). The administering authority may, based on the information provided in the study report when it becomes available, all relevant information available at the time and the regulatory framework applicable at that time, consult with the environmental authority holder about the conditions in the environmental authority concerning the treatment and disposal of waste water. The aim of the consultation shall be the meaningful review of the contaminant release limits imposed in this authority having regard to: a) The study results; b) Near field monitoring results; c) QLD Water Quality Guidelines; and d) Best practice environmental management. If this review leads to a change in the requirements on this environmental authority holder, this shall be advanced by way of an authority amendment or a Transitional Environmental Program and as is necessary or desirable. Groundwater

    page 24Groundwater, Waste, Monitoring and reporting
  97. E32

    Contaminants must not be released directly or indirectly to any groundwater.

    page 24Groundwater
  98. E33

    The taking of or interference with groundwater must not cause environmental harm to any groundwater dependant ecosystems. Permit OFFICIAL Environmental Authority EPML00770913

    page 24Groundwater
  99. E34

    The Groundwater Management Program developed by an appropriately qualified person must be implemented and maintained by the environmental authority holder.

    page 25Groundwater
  100. E35

    The Groundwater Management Program required by condition E34 must: a) identify potential sources of contamination and impacts to groundwater from the activity; and b) ensure that all potential groundwater impacts due to the activity are identified, mitigated and monitored; and c) document sampling and monitoring methodology; and d) ensure that adequate groundwater monitoring and data analysis is undertaken to achieve the following objectives: i. detect any impacts to groundwater levels due to the activity; and ii. detect any impacts to groundwater quality due to the activity; and iii. determine compliance with condition E45; and iv. determine trends in groundwater quality showing decreasing and increasing trends; and e) include an appropriate quality assurance and quality control program; and f) include a groundwater model which includes an assessment of current seepage rates and predicted post- mining seepage rates; and g) include a review process to identify improvements to the program that includes addressing any comments provided by the administering authority.

    page 25Groundwater, Monitoring and reporting
  101. E36

    The Groundwater Management Program must be reviewed annually by an appropriately qualified person. The review must include at a minimum: a) an assessment that the Groundwater Monitoring and Management Program continues to meet the requirements stated in condition E35; and b) a review of all the historical groundwater data against the limits specified in Table E7 - Groundwater quality limits; and c) determine the representativeness of current groundwater conditions and suitability of Limit A and Limit B in Table E7 - Groundwater quality limits; and d) an assessment of the suitability of the monitoring network for groundwater specified in Table E6 - Groundwater monitoring locations and frequency to detect impacts from the mining activities; and e) where relevant information gaps or uncertainty are identified as pertinent to the accuracy of the investigations finding/conclusions, include recommendations and associated timeframes to address those information gaps and resolve uncertainty.

    page 25Groundwater, Monitoring and reporting
  102. E37

    The Groundwater Management Program and annual review required under condition E36 must be provided to the administering authority annually from 30 January 2022.

    page 25Groundwater
  103. E38

    The holder of the environmental authority must report the results and analysis of groundwater monitoring to the administering authority on request.

    page 25Groundwater, Monitoring and reporting
  104. E39

    Groundwater levels must be monitored, and groundwater draw down fluctuations in excess of two (2) metres per year, not resulting from the pumping of licensed bores, must be notified as per conditions A10 - A11.

    page 25Groundwater, Monitoring and reporting
  105. E40

    Groundwater quality and standing water level must be monitored: a) at the locations specified in Table E6 - Groundwater monitoring locations and frequency; and b) at the frequencies specified in Table E6 - Groundwater monitoring locations and frequency; and c) for the quality characteristics identified in Table E7 - Groundwater quality limits for the hydrogeological feature in which the bore is located.

    page 25Groundwater, Monitoring and reporting
  106. E41

    Groundwater measured from any compliance bore specified in Table E6 - Groundwater monitoring locations and frequency must not exceed the corresponding Limit A specified in Table E7 - Groundwater quality limits on any five consecutive sampling occasions.

    page 25Groundwater, Monitoring and reporting
  107. E42

    Groundwater measured from any compliance bore specified in Table E6 - Groundwater monitoring locations and frequency must not exceed the corresponding Limit B specified in Table E7 - Groundwater quality limits on any three consecutive sampling occasions.

    page 25Groundwater, Monitoring and reporting
  108. E43

    If groundwater measured from any compliance bore specified in Table E6 - Groundwater monitoring locations and frequency exceeds the corresponding Limit B specified in Table E7 - Groundwater quality Permit OFFICIAL Environmental Authority EPML00770913 limits on any one sampling occasion the environmental authority holder must resample the groundwater within the compliance bore for all exceeding quality characteristics within ten business days of receipt of results.

    page 25Groundwater, Monitoring and reporting
  109. E44

    If groundwater measured from any compliance bore specified in Table E6 - Groundwater monitoring locations and frequency exceeds the corresponding Limit B specified in Table E7 - Groundwater quality limits on any one sampling occasion the environmental authority holder must review and implement actions identified in the Groundwater Management Program and Seepage Management Plan as required by condition

    page 26Groundwater, Monitoring and reporting
  110. E34

    and E52 for effectiveness within ten business days of receipt of resampled results and document the review. Note: The resampling event is not considered a sampling occasion and therefore not a consecutive exceedance of the Limit B for the quality characteristic/s for the purposes of condition E42.

  111. E45

    From 30 July 2021, the environmental authority holder must ensure that the groundwater quality measured in operational bores specified in Table E6 - Groundwater monitoring locations and frequency does not have increasing trends.

    page 26Groundwater, Monitoring and reporting
  112. E46

    The following information must be recorded in relation to all groundwater sampling: a) The date on which the sample was taken; b) The time at which the sample was taken; c) The monitoring point at which the sample was taken; and d) The results of all monitoring.

    page 26Groundwater, Monitoring and reporting
  113. E47

    Monitoring and sampling must be carried out in accordance with written procedures and must address the requirements of the latest version of the following documents unless otherwise approved by the administering authority: a) for waters and aquatic environments, Monitoring and Sampling Manual: Environmental Protection (Water) b) for groundwater, Groundwater Sampling and Analysis - A Field Guide (2009:27 GeoCat#6890.1) and Australian Standard AS/NZS 5667.11:1998 Water Quality - Sampling - Part 11: Guidance on sampling of groundwaters; c) for subterranean aquatic fauna, the Guideline for the Environmental Assessment of Subterranean Aquatic Fauna (Queensland Herbarium, DSITI December 2015).

    page 26Groundwater, Biodiversity, Monitoring and reporting
  114. E48

    The construction, maintenance and decommissioning of groundwater monitoring bores must be undertaken in a manner that: a) prevents contaminants entering the groundwater; and b) ensures the integrity of the bores to obtain representative groundwater samples from the target aquifer; and c) maintains the hydrogeological environment within the aquifer.

    page 26Groundwater, Monitoring and reporting
  115. E49

    A bore log# must be completed for each groundwater monitoring bore which includes: a) bore identification reference and geographic coordinate location; and b) specific construction information including but not limited to depth of bore, depth and length of casing, depth and length of screening and bore sealing details; and c) standing groundwater level and water quality characteristics including physical characteristics and results of laboratory analysis for the possible trigger characteristics; and d) lithological data, stratigraphic interpretation by an appropriately qualified person to identify important features associated with groundwater monitoring; and e) target hydrogeological formation of the bore. #Note: No bore log records available prior to 1 January 2000 for MB02 andTD4/DS.

    page 26Groundwater, Monitoring and reporting
  116. E50

    The environmental authority holder must install, operate and maintain seepage management systems to prevent seepage from all site infrastructure moving beyond the operational bores specified in Table E6 - Groundwater monitoring locations and frequency. Permit OFFICIAL Environmental Authority EPML00770913 Table E6 - Groundwater monitoring locations and frequency (`Table E6') Location GroundwaterMonitoring QualityFrequency Monitoring Point[1] (GDA94 - Aquifer Standing Zone 56) Water Level Latitude Longitude RL (m) [2] Screened interval RL (m) [2] Surface RL (m)[2] Compliance bores Tailings Storage Facility 1 (TSF1)

    page 26Groundwater, Waste, Monitoring and reporting
  117. MB065

    226218 7200577 Camboon Volcanics 314.86 19-25

  118. MB08

    226033 7200340 Camboon Volcanics 328.37 18-24 226044 7199887 Camboon Volcanics 12-18 &

  119. MB10

    Camboon Volcanics 300.57 24-30 225547 7200313 9.22 -

  120. MB2

    226262 Tailings Dam 4 (TD4) 335.5 17.84 7202116 Camboon Volcanics 5-6 TD4/US2B 226908 7202002 Colluvium 389.3 5-6 372.2 TD4/US3B 227080 7202055 Colluvium 3.6-6.0 354.40 TD1/DSB 227228 Tailings Dam 1 and 2 (TD1/TD2) 12-18 Observation Bores4 7199458 Camboon Volcanics 258 358.55 17-23

    page 28Regulated structures, Waste
  121. RB01

    227239 7202652 Camboon Volcanics 348.76 15.74

  122. RB02

    225977 7202915 353.90 7.5-10.5 Colluvium 370.70 15-21 397.02 28-34 Camboon Volcanics 296.80 25-31 357.58 8-11

  123. RB03

    222823 7203261 Barfield Formation 8-17 Quarterly

  124. RB05

    226024 7203185 Camboon Volcanics 18.2- Monthly

  125. RB06

    226264 7203900 Camboon Volcanics 21.2 2.5-3.5 TD4/DS2B 226495 7202403 Siltstone 3-5

  126. MB11

    225462 7200521 Camboon Volcanics

  127. TD3

    226464 7200518 Tailings TD3B 226463 7200606 Tailings 358.13 TSF2-BS 223134 7202218 Alluvium 235.59 TSF2-BN 223089 7202366 Alluvium 234.38 1 Monitoring point depicted in Schedule J - Figure 4. 2 RL must be measured at the top of the bore casing to the nearest 5cm. 3 Groundwater quality when measured in operational bores must comply with condition E45. 4 Observation bores are for interpretation purposes only. 5 Condition E39 does not apply to MB06. Permit OFFICIAL Environmental Authority EPML00770913 Table E7 - Groundwater contaminant trigger values and limits (`Table E7') Quality Characteristic Bores Limit A Limit B pH All bores 6 - 8.5 1900 Electrical Conductivity (-s/cm) KMB7, CEX/DS 1700 KMB8, GW4B, TD4/OC, 4200 4400 TD4/US2A, TD4/US3A KMB12, KMB3 5500 6000 KMB5A, KMB5B, 9200 10000 TD4/DS, TD4/DS2 TD1/DSA 4540 4560 Sulfate (mg/L) CEX/DS, TD4/US3A 84 86

    page 28Groundwater, Waste, Monitoring and reporting
  128. E51

    The Seepage Management Systems required by condition E50 must, at a minimum: a) include effective control measures to minimise seepage from all site infrastructure; and b) include effective control measures to capture and pump-back seepage sufficient to prevent migration into surface waters; and c) include effective control measures to ensure seepage does not report to groundwater in the receiving environment; and d) include effective control measures to ensure compliance with condition E45; and e) include adequate detection measures to analyse and confirm the effectiveness of all control measures required by this condition

    page 30Groundwater, Surface water, Monitoring and reporting
  129. E52

    The environmental authority holder must implement and maintain a Seepage Management Plan developed and documented by an appropriately qualified person(s). The SMP must, at a minimum: a) describe the Seepage Management Systems required by condition E50; and b) include adequate control measures to ensure groundwater quality in compliance bores listed in Table E6- Groundwater monitoring locations and frequency comply with all limits specified in Table E7 - Groundwater quality limits; and c) include all measures necessary to ensure that the management intent for groundwater is achieved in accordance with condition E45; and d) include all measures necessary to ensure compliance with condition E1 and E32; and e) include adequate measures to intercept seepage sufficient to prevent migration beyond the operational as specified in Table E6 - Groundwater monitoring locations and frequency; and f) include adequate measures and review processes to determine if any additional control measures e.g. interception bores or interception trenches are required; and g) include an action plan to implement and/or install any additional control measures that are required; and h) include a map or figure that depicts the location and type of seepage control measures installed; and i) be reviewed annually for the effectiveness of the components and include details of improvements undertaken in the previous year; and j) record the volumes of seepage collected and/or handled as part of the seepage management system. k) address any comments made by the administering authority

    page 30Groundwater, Monitoring and reporting
  130. E53

    The Seepage Management Plan must be made available to the administering authority annually from 30 January 2022.

  131. E54

    If groundwater standing water level (relative level) in groundwater monitoring bores TSF2AN and TSF2AS is less than the trigger threshold of 5 meters, when monitored in accordance with Table E6 - Groundwater monitoring locations and frequency (as measured in accordance with Table E6 - Groundwater monitoring locations and frequency note 2), the environmental authority holder must: a) Within ten business days of exceedance, review and implement actions identified in the: (i) Groundwater Management Program as required by condition E34; and (ii) Seepage Management Plan as required by condition E52; and b) Document the review.

    page 30Groundwater, Monitoring and reporting
  132. E55

    By 30 June 2027, the environmental authority holder must develop and implement a groundwater monitoring network that is representative of the TSF2 site groundwater flow conditions including additional fit for purpose groundwater monitoring bores to inform the groundwater assessment report required by condition E56.

    page 30Groundwater, Monitoring and reporting
  133. E56

    By 30 June 2028, an appropriately qualified person must prepare a TSF2 groundwater assessment report that includes but is not limited to the following: a) A review of all relevant groundwater data; and b) A hydrogeological conceptualisation and assessment of the adequacy of the groundwater monitoring network in accordance with the Australian groundwater modelling guidelines (Barnett et al., 2012); and c) Consideration of the requirements of the groundwater management program required by condition E34; and Permit OFFICIAL Environmental Authority EPML00770913 d) Recommendations for changes to the groundwater management program and seepage management plan as required by condition E34 and E53; and e) Recommendation for whether a numerical groundwater model is required.

    page 30Groundwater, Monitoring and reporting
  134. E57

    The environmental authority holder must provide a copy of the groundwater assessment report required under condition E56 to the administering authority within 90 days of its completion. END OF CONDITIONS FOR SCHEDULE E Permit OFFICIAL Environmental Authority EPML00770913 Schedule F - Biodiversity Biodiversity offsets

    page 31Groundwater, Biodiversity, Monitoring and reporting
  135. G1

    The environmental authority holder must rehabilitate all land disturbed by the mining activities in a manner that ensures rehabilitated areas achieve the following rehabilitation objectives: a) Safe for humans and wildlife; b) Non-polluting; c) Stable; d) Able to sustain an agreed post-mining land-use; e) Revegetated with species endemic to the area with no declared pest species; and f) Compliant with all conditions of this environmental authority.

    page 33Rehabilitation
  136. G2

    A Final Land Use Rehabilitation Plan (`FLURP') that describes how the rehabilitation objectives in condition

    page 33Rehabilitation
  137. G1

    will be achieved must be developed, documented and implemented for all stages of the mining activity by 30 June 2017. The FLURP must at minimum include: a) Schematic representation of the proposed final land form inclusive of site drainage features; b) Details of proposed slope design and erosion and sediment controls; c) Proposed cover designs for encapsulation of waste material, including performance criteria; d) Proposed re-vegetation methods inclusive of plant species selection, propagation methods and establishment of suitable plant growth medium (i.e. top soil); e) Materials balance for all rehabilitation requirements including available top soil and material suitable for encapsulating waste in accordance with the proposed encapsulation methodology; f) Geotechnical, geochemical and hydrological studies necessary to demonstrate likely success of proposed rehabilitation methodology to achieve the required rehabilitation outcomes; g) An investigation of proposed residual voids including potential for generation/mobilisation of contaminants, potential pathways for release of contaminants to waters (including groundwater) and a long-term void water balance model; and h) A rehabilitation monitoring program sufficient to identify if required rehabilitation outcomes have been achieved.

    page 33Rehabilitation, Groundwater, Waste, Land and soil, Biodiversity, Monitoring and reporting
  138. G3

    Rehabilitation in accordance with condition G2 must commence progressively in accordance with the plan of operations.

    page 33Rehabilitation
  139. G4

    Residual voids must not cause any serious or material environmental harm, other than the environmental harm constituted by the existence of the residual void itself, subject to any other condition within this environmental authority.

  140. G5

    All explosives, flammable or corrosive substances, hazardous chemicals, toxic substances, gases and dangerous goods must be stored and handled in accordance with: a) The current Australian Standard where applicable; or b) Where no relevant Australian Standard exists, store such materials within an on-site containment system sufficient to prevent release to the receiving environment.

    page 33Waste
  141. G6

    Minimise the potential for contamination of land by hazardous contaminants.

    page 33Waste
  142. G7

    The environmental authority holder may conduct one (1) heap leach trial comprising of 2000 tonnes of ore with dimensions 20m x 20m x 4m high on the surface of TD2 within a three (3) month period. The holder of the environmental authority must design and operate the heap leach process within a bunded area with a capacity to contain the maximum volume of solution used in the leaching process in addition to rainfall runoff for a 1:100 ARI, 72 hour duration.

  143. G8

    The legacy disturbance identified in Table G1- Legacy Disturbance must be managed in accordance with the conditions of this environmental authority. Permit OFFICIAL Environmental Authority EPML00770913 Table G1 - Legacy disturbance Mining Lease Mine Feature Name/ Location Maximum Disturbance (MGA 94, Zone 56)1 Area (Hectares) Description <1.0 maximum disturbance (at ML3221 TD1/TD2 227,333E; 7,200,141N various locations) ML8009 8.1 Easement disturbance 227189E; 7200274N 0.1

  144. TD3

    unnamed tributary 225771E; 7200338N 1.79 ML3229 Roses Pride 224,274E; 7,202,856N 1.2 ML80089 Klondyke 225,235E; 7,200,546N 1.3 (clay borrow pits) 225,133E; 7,200,293N 0.85 (Klondyke) Notes: 1: The location coordinates represent the approximate centroid of each respective polygon shown in Schedule J - Figure 6.

  145. G9

    The disturbance areas identified in Table G2 - Legacy Disturbance areas not authorised to be disturbed are not the responsibility of the environmental authority holder and are not authorised to be disturbed by the environmental authority holder. Table G2 - Legacy disturbance areas not authorised to be disturbed Mining Mine Feature Name/ Description Location Maximum Disturbance Lease (MGA 94, Zone 56)1 Area (Hectares) ML3234 Historical tailings deposition 227,850E; 7,199,370N 14.8 ML3228 Historical diggings Various occurrences 40.02 ML3219 Historical diggings within the ML 18.62 ML3232 Historical diggings 28.92 ML3229 Roses Pride historical shaft and 224,370E; 7,202,840N 0.6 process plant ML3221 Historical process plant 227,257E; 7,200,263N 1.3 ML3221 UQ House 227,138E; 7,200,275N 0.6 (excludes easement) ML80089 Historical infrastructure 225,117E; 7,200,525N, 1.0 Notes: 1: The location coordinates represent the approximate centroid of each respective polygon shown in Schedule J - Figure 6. 2: The maximum disturbance area represents the whole polygon, within which only minor legacy disturbance exists. Disturbance areas have not been specifically identified within these polygons END OF CONDITIONS FOR SCHEDULE G Permit OFFICIAL Environmental Authority EPML00770913 Schedule H - Regulated Structures

    page 34Regulated structures, Waste
  146. H1

    The consequence category of any structure must be assessed by a suitably qualified and experienced person in accordance with the Manual for assessing consequence categories and hydraulic performance of structures a) Prior to the construction of the structure, if it is not an existing structure; or b) If it is an existing structure, by 20 December 2016; or c) Prior to any change in its purpose or the nature of its stored contents.

    page 35Regulated structures
  147. H2

    A consequence assessment report and certification must be prepared for each structure assessed and the report may include a consequence assessment for more than one structure.

    page 35Monitoring and reporting
  148. H3

    Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for assessing consequence categories and hydraulic Design and construction of a regulated structure

    page 35Regulated structures
  149. H4

    All regulated structures constructed after 20 December 2016, must be designed by, and constructed under the supervision of, a suitably qualified and experienced person in accordance with the requirements of the

    page 35Regulated structures
  150. H5

    Construction of a regulated structure after 20 December 2016 is prohibited unless the environmental authority holder has submitted to the administering authority and 28 days have elapsed, the following: a) a consequence category assessment report, as required by condition H2, and b) the suitably qualified and experienced person certified design and design plan; and c) the associated suitably qualified and experienced person certified operating procedures.

    page 35Regulated structures, Monitoring and reporting
  151. H6

    Certification for regulated structures constructed after 20 December 2016, must be provided by the suitably qualified and experienced person who oversees the preparation of the design plan in the form set out in the must be recorded in the Regulated Structures register.

    page 35Regulated structures
  152. H7

    Regulated structures constructed after 20 December 2016, must: a) be designed and constructed in accordance with and conform to the requirements of the Manual for b) be designed and constructed with due consideration given to ensuring that the design integrity would not be compromised on account of: i) floodwaters from entering the regulated structure from any watercourse or drainage line; and ii) wall failure due to erosion by floodwaters arising from any watercourse or drainage line

    page 35Surface water, Regulated structures, Land and soil
  153. H8

    Certification by the suitably qualified and experienced person who supervises the construction of regulated structures after 20 December 2016, must be submitted to the administering authority within 90 days of the completion of construction of the regulated structure, and state that: a) the 'as constructed' drawings and specifications meet the original intent of the design plan for that regulated structure; b) construction of the regulated structure is in accordance with the design plan. Operation of a regulated structure

    page 35Regulated structures
  154. H9

    Operation of a regulated structure must not commence unless the environmental authority holder has submitted to the administering authority: a) One paper copy and one electronic copy of the design plan and certification of the `design plan' in accordance with condition H6, and b) A set of `as constructed' drawings and specifications, and Permit OFFICIAL Environmental Authority EPML00770913 c) Certification of those `as constructed drawings and specifications' in accordance with condition H8, and d) Where the regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the design storage allowance (DSA) volume across the system, a copy of the certified system design plan; e) A statement that confirms: i. The requirements of this authority relating to the construction of the regulated structure have been met; ii. The details required under this authority, have been entered into a Register of Regulated Structures; and iii. There is a current operational plan for the regulated structures.

    page 35Regulated structures
  155. H10

    For existing structures that are regulated structures: a) where the existing structure that is a regulated structure is managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, the environmental authority holder must submit to the administering authority within three (3) months of the commencement of this condition a copy of the certified system design plan including that structure; and b) There must be a current operational plan for the existing structures.

    page 36Regulated structures
  156. H11

    Each regulated structure must be maintained and operated, for the duration of its operational life until decommissioned and rehabilitated, in a manner that is consistent with the current operational plan and, if applicable, the current design plan and associated certified `as constructed' drawings. Mandatory reporting level

    page 36Rehabilitation, Regulated structures, Monitoring and reporting
  157. H12

    Other than for regulated Structures that have been certified as low consequence category for `failure to contain - overtopping' and with the exception of the Golden Plateau Pit, the Mandatory Reporting Level (the MRL) specified in Table H1 must be marked on a regulated structure in such a way that during routine inspections of that structure, it is clearly observable.

    page 36Regulated structures, Monitoring and reporting
  158. H13

    Other than for regulated Structures that have been certified as low consequence category for `failure to contain - overtopping', the environmental authority holder must, as soon as practical and within forty-eight (48) hours of becoming aware, notify the administering authority when the level of the contents of a regulated structure reaches the MRL.

    page 36Regulated structures, Monitoring and reporting
  159. H14

    Other than for regulated Structures that have been certified as low consequence category for `failure to contain - overtopping', the environmental authority holder must, immediately on becoming aware that the MRL has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated structure.

    page 36Regulated structures
  160. H15

    Other than for regulated Structures that have been certified as low consequence category for `failure to contain - overtopping', the environmental authority holder must record any changes to the MRL in Table H1 and in the Register of Regulated Structures. Design storage allowance

    page 36Regulated structures, Monitoring and reporting
  161. H16

    The environmental authority holder must assess the performance of each regulated structure or linked containment system over the preceding November to May period based on actual observations of the available storage in each regulated structure or linked containment system taken prior to 1 July of each year.

    page 36Regulated structures
  162. H17

    By 1 November of each year, storage capacity must be available in each regulated structure (or network of linked containment systems with a shared DSA volume), to meet the Design Storage Allowance (DSA) volume for the structure (or network of linked containment systems), as specified in Table H1.

    page 36Regulated structures
  163. H18

    The environmental authority holder must, as soon as possible and within forty-eight (48) hours of becoming aware that the regulated structure (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, notify the administering authority. Permit OFFICIAL Environmental Authority EPML00770913

    page 36Regulated structures, Monitoring and reporting
  164. H19

    The environmental authority holder must, immediately on becoming aware that a regulated structure (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated structure or linked containment systems. Annual inspection report

    page 37Regulated structures, Monitoring and reporting
  165. H20

    Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person.

    page 37Regulated structures
  166. H21

    At each annual inspection, the condition and adequacy of all components of the regulated structure must be assessed and a suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and include recommended actions, if applicable, to ensure the integrity of the regulated structure.

    page 37Regulated structures, Monitoring and reporting
  167. H22

    The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for assessing consequence categories and hydraulic performance of

    page 37Regulated structures, Monitoring and reporting
  168. H23

    The environmental authority holder must within 20 business days of receipt of the annual inspection report, provide to the administering authority: a) The recommendations section of the annual inspection report; and b) If applicable, any details of any actions being taken in response to those recommendations. Transfer arrangements

    page 37Monitoring and reporting
  169. H24

    The environmental authority holder must provide a copy of any reports, documentation and certifications prepared under this authority, including but not limited to any Register of Regulated Structures, consequence assessment, design plan and other supporting documentation, to a new holder on transfer of this authority. Decommissioning and rehabilitation

    page 37Rehabilitation, Regulated structures, Monitoring and reporting
  170. H25

    Regulated structures and structures must not be abandoned but must be decommissioned and rehabilitated to achieve compliance with conditions G1 and G2 of this environmental authority. Hydraulic performance of regulated structures

    page 37Rehabilitation, Regulated structures
  171. H26

    Each regulated structure authorised by this environmental authority as specified in Schedule A - Table A1 Authorised Disturbance, must meet the hydraulic performance criteria listed in Table H1 for that structure.

    page 37Regulated structures
  172. H27

    The water level must be measured and recorded electronically at Bore NS8, in order to enable monitoring of the Mandatory Reporting Level in the Golden Plateau Pit. Permit OFFICIAL Environmental Authority EPML00770913 Table H1 - Hydraulic performance criteria (`Table H1') Design Storage Mandatory Allowance (DSA) Name of Consequence Spillway Capacity Reporting Level Purpose Regulated Category of Structure (MRL) structure Design mAHD Design ML Design mAHD Criteria Criteria Criteria

    page 37Groundwater, Regulated structures, Monitoring and reporting
  173. TD4

    High 1:1000 394 1:100 1 in 100 393.1 Water (Stage 6) AEP AEP 4 AEP storage month as 72hr at 1 Nov duration each year Golden Significant 1:100 365 1:20 AEP 305.4 1:10 341.9 Plateau AEP 4-month AEP 359.7 Pit 72hr 339.1 duration Central Significant 1:100 361.17 1:20 AEP 40 1:10 Extended AEP 4-month AEP Pit 72hr duration Golden Significant 1:100 341.33 1:20 AEP 97.7 1:10 Mile Pit AEP 4-month AEP 72 hr duration 1. Calculated using the method of operational simulation.

  174. H28

    The hydraulic performance criteria specified in Table H1 are the minimum mandatory performance requirements; regulated structures must be managed in a manner that ensures compliance with all conditions of this environmental authority. END OF CONDITIONS FOR SCHEDULE H Permit OFFICIAL Environmental Authority EPML00770913 Schedule I - Definitions Definitions Key terms and/or phrases used in this document are defined in this section and bolded throughout this document. Applicants should note that where a term is not defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies must be used. If a word remains undefined it has its ordinary meaning. Word / Phrase Definition Acid drainage Means any contaminated discharge emanating from a mining activity Acid and metalliferous drainage formed through a series of chemical and/or biological reactions. Refer to Acid and metalliferous drainage. Annual inspection report Means any contaminated discharge emanating from a mining activity formed through a series of chemical and/or biological reactions. The term acid and metalliferous drainage is used to describe any drainage type and includes: - Acid drainage - Neutral and metalliferous drainage - Saline drainage Means an assessment prepared by a suitably qualified and experienced person containing details of the assessment against the most recent consequence assessment report and design plan (or system design plan): a) Against recommendations contained in previous annual inspections reports; b) Against recognised dam safety deficiency indicators; c) For changes in circumstances potentially leading to a change in consequence category; d) For conformance with the conditions of this environmental authority; e) For conformance with the `as constructed' drawings; f) For the adequacy of the available storage in each regulated dam, based on an actual observation or observations taken after 31 May each year but prior to 1 November of that year, of accumulated sediment, state of the containment barrier and the level of liquids in the dam (or network of linked containment systems); For evidence of conformance with the current operational plan. Annual exceedance probability or The probability that at least one event in excess of a particular AEP magnitude will occur in any given year. Appropriately qualified person Means a person who has professional qualifications, training, skills

    page 38Regulated structures, Land and soil, Monitoring and reporting

Instrument text by page (numbering incomplete)

Numbering in this instrument has gaps, so its full text is also shown page by page.

  1. Page 1

    OFFICIAL Permit Environmental Protection Act 1994 Environmental Authority EPML00770913 This environmental authority is issued by the administering authority under Chapter 5 of the Environmental Protection Act 1994. Environmental authority number: EPML00770913 Environmental authority takes effect on 27 August 2026. The anniversary date of this environmental authority is 22 July each year. Environmental authority holder(s) Registered address Name(s) 520 Wickham Street Lion Mining Pty Ltd FORTITUDE VALLEY QLD 4006 Environmentally relevant activity and location details Environmentally relevant activity/activities Location(s) Schedule 3 16: Mining gold ore ML3219, ML3221, ML3223, ML3224, ML3227, ML3228, ML3229, ML3230, ML3231, ML3232, ML3234, ML3243, ML80024, ML80088, ML80089, ML80114, ML80120, ML80144 Schedule 3 10: Investigating the potential development ML3221, ML3227 of a mineral resource by large bulk sampling or constructing an exploratory shaft, adit or open pit Ancillary 31 - Mineral processing 2: Processing, in a ML3223, ML3224, ML3227, ML3230, ML80024, year, the following quantities of mineral products, other ML80088, ML80089, ML80114, ML80144 than coke (a) 1000t to 100,000t Ancillary 08 - Chemical Storage 1: Storing a total of 50t ML3230, ML80088, ML80144 or more of chemicals of dangerous goods class 1 or class 2, division 2.3 under subsection (1)(a) Ancillary 63 - Sewage Treatment 1: Operating sewage ML3221, ML80088, ML80114 treatment works, other than no-release works, with a total daily peak design capacity of (a-ii) 21 to 100EP otherwise

  2. Page 2

    Permit OFFICIAL Environmental Authority EPML00770913 Additional information for applicants Environmentally relevant activities The description of any environmentally relevant activity (ERA) for which an environmental authority (EA) is issued is a restatement of the ERA as defined by legislation at the time the EA is issued. Where there is any inconsistency between that description of an ERA and the conditions stated by an EA as to the scale, intensity or manner of carrying out an ERA, the conditions prevail to the extent of the inconsistency. An EA authorises the carrying out of an ERA and does not authorise any environmental harm unless a condition stated by the EA specifically authorises environmental harm. A person carrying out an ERA must also be a registered suitable operator under the Environmental Protection Act 1994 (EP Act). Mobile and temporary activities If you operate a mobile and temporary ERA, other than regulated waste transport, you are required to maintain a work diary. You must: - keep the work diary records for 2 years after the last entry; - inform the administering authority within 7 days of the work diary being lost or stolen; - record the information required in the work diary for each location within 1 day of leaving the location. Contaminated land It is a requirement of the EP Act that an owner or occupier of land give written notice to the administering authority if they become aware of the following: - the presence of, or happening of an event involving, a hazardous contaminant on the land that is causing, or is reasonably likely to cause, serious or material environmental harm (notice must be given within 24 hours); or - if the land is contaminated land - a change in the condition of the land that is causing, or is reasonably likely to cause, serious or material environmental harm (notice must be given within 24 hours); or - a notifiable activity (as defined in Schedule 3) having been carried out, or is being carried out, on the land (notice must be given within 20 business days). For further information, including the form for giving written notice, refer to the Queensland Government website www.qld.gov.au, using the search term `duty to notify'. Take effect Please note that, in accordance with section 200(1) of the EP Act, an EA has effect: (a) if the authority is for a prescribed ERA and it states that it takes effect on the day nominated by the holder of the authority in a written notice given to the administering authority--on the nominated day; or (b) if the authority states a day or an event for it to take effect--on the stated day or when the stated event happens; or (c) otherwise--on the day the authority is issued. However, in accordance with section 200(2) of the EP Act, the day that the EA takes effect may not be before: (a) if the authority is for a resource activity--the day the relevant tenure is granted to the applicant; or (b) if a development permit for a material change of use of premises under the Planning Act 2016 is necessary for carrying out an activity that related to the authority--the day the development permit takes effect; or

    Waste, Monitoring and reporting
  3. Page 3

    Permit OFFICIAL Environmental Authority EPML00770913 (c) if an SDA Approval under the State Development and Public Works Organisation Act 1971 is necessary for carrying out an activity that relates to the authority--the day the approval takes effect. If this EA takes effect when the additional authorisation takes effect, you must provide the administering authority written notice within 5 business days of receiving notification of the related additional authorisation taking effect. If you have incorrectly claimed that an additional authorisation is not required, carrying out the ERA without the additional authorisation is not legal and could result in your prosecution for providing false or misleading information or operating without a valid EA. 27 August 2026 Signature Date Giles Bezzina Enquiries: Delegate of the administering authority PO Box 7230, Cairns QLD 4870 Environmental Protection Act 1994 Phone: (07) 4222 5352 Email: ESCairns@detsi.qld.gov.au

    Monitoring and reporting
  4. Page 4

    Permit OFFICIAL Environmental Authority EPML00770913 Obligations under the Environmental Protection Act 1994 In addition to the requirements found in the conditions of this EA, the holder must also meet their obligations under the EP Act, and the regulations made under the EP Act. For example, the holder must comply with the following provisions of the Act: - general environmental duty (section 319) - duty to restore the environment (section 319C) - duty to notify environmental harm (section 320-320G) - offence of causing serious or material environmental harm (sections 437-439) - offence of causing environmental nuisance (section 440) - offence of depositing prescribed water contaminants in waters and related matters (section 440ZG) - offence to place contaminant where environmental harm or nuisance may be caused (section 443). Other permits required This permit only provides an approval under the EP Act. In order to lawfully operate you may also require permits / approvals from your local government authority, other business units within the department, and other State and Federal Government agencies prior to commencing any activity at the site. For example, this may include permits or approvals with your local Council (for planning approval), the Department of Transport and Main Roads (to access State controlled roads), the Department of Natural Resources and Mines, Manufacturing, and Regional and Rural Development (to clear vegetation), and the Department of Primary Industries (to clear marine plants or to obtain a quarry material allocation). Obligations under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) Matters of national environmental significance (MNES) are regulated under the Commonwealth EPBC Act rather than under state legislation. You may need to submit a referral if your project potentially impacts any matters protected under the EPBC Act. For more information on self-assessments, and referral and assessment processes, please visit the Australian Government Department of Climate Change, Energy, the Environment and Water's website at www.dcceew.gov.au/environment/epbc/advice. Obligations under the Aboriginal Cultural Heritage Act 2003 and Torres Strait Islander Cultural Heritage Act 2003 (the Cultural Heritage Acts) The Cultural Heritage Acts require anyone who carries out a land-use activity to exercise a duty of care. This `duty of care' means land users must take all reasonable and practicable measures to ensure their activity does not harm Aboriginal or Torres Strait Islander cultural heritage, and applies to any activity where Aboriginal or Torres Strait Islander cultural heritage is located. For more information on your obligations under this legislation, please visit the Department of Women, Aboriginal and Torres Strait Islander Partnerships and Multiculturalism webpage at, www.dwatsipm.qld.gov.au.

    Biodiversity, Monitoring and reporting
  5. Page 5

    Permit OFFICIAL Environmental Authority EPML00770913 Conditions of environmental authority Schedule A - General Schedule B - Air Schedule C - Waste Management Schedule D - Noise Schedule E - Water Schedule F - Biodiversity Schedule G - Land and Rehabilitation Schedule H - Regulated Structures Schedule I - Definitions Schedule J - Maps and Plans

    Rehabilitation, Regulated structures, Noise and vibration, Waste
  6. Page 6

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule A - General A1 This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm. A2 Contaminants with the potential to cause environmental harm must not be released directly or indirectly to the receiving environment, except as permitted under the conditions of this environmental authority. A3 The environmental authority holder must ensure that the activity is carried out in accordance with Table A1 and Schedule J - Figure 1 Location of authorised disturbance and Schedule J - Figure 2 Location of authorised disturbance including proposed footprint of TSF2 Stage 3B, 4 and 5. Table A1 - Authorised disturbance (`Table A1') Mine Mine Feature Name Location1 Maximum Disturbance Domain (MGA94, Zone 56) Area (Hectares) Central Peg Coordinates Dams and Mine Water Ponds, Roses 11.05 Diversions Pride Mine Ponds, TSF2 225510, 7200245 Diversion Drain (including 224200, 7202780 53.6 Waste Rock northern and southern 223300, 7202250 123 Dump diversion drains), TSF2 223617, 7201914 3 (WRD) and Southern Drain 223050, 7202506 2.1 Ore Extension, 223769, 7202411 19 Stockpiles Stage 3A ESCP 223575, 7201900 5.4 Diversions and Dams 17.88 Storage Drain 226490, 7201040 Facility Stage 3B Southern 228172, 7200419 (TSF) Diversion Drain 224310, 7202740 Golden Plateau 225790, 7200160 Run of Mine Central Extended 226240, 7200150 (ROM) Golden Mile 223300, 7202250 Processing Roses Pride WRD 227250, 7199670 Area Main Portal WRD 227230, 7199820 TSF1 226500, 7200470 Voids TSF2 226580, 7202040 TD1 Surface TD2 227040, 7199870 shrink TD3 stoping area TD4 227020, 7199720 ROM PAD 226520, 7201330 228600, 7199890 Ore Treatment Plant 227590, 7200600 226900, 7200610 Central Extended Pit Golden Mile Pit 224453, 7203027 Golden Plateau Bradshaw's Pit 225629, 7200013 225629, 7200013 Roses Pride surface shrink 225620, 7200240 stoping area 226135,7199862 226409, 7199870 Topsoil Topsoil Stockpiles 226565, 7200370 Stockpiles 224510, 7202560

    Regulated structures, Waste, Land and soil
  7. Page 7

    Permit OFFICIAL Environmental Authority EPML00770913 Mine Mine Feature Name Location1 Maximum Disturbance Domain (MGA94, Zone 56) Area (Hectares) Central Peg Coordinates Ancillary Administration Areas 225120, 7200510 1.05 Infrastructure 225640, 7200935 28.7 225605, 7200760 2.6 Roads and Haul roads and LV tracks 225710, 7199935 Tracks 223250, 7202700 223665, 7201756 Hardstand Laydowns at workshop, fuel Areas storage, substation, Rose's 223775, 7201826 (excess soil) Pride, VR1 Generator, Rock Empire and Townes 223793, 7201744 (topsoil) Utilisation Laydown. 223737, 7201745 Quarry 227030, 7199540 225550, 7199930 226510, 7199840 224840, 7200970 225670, 7200060 226420, 7200870 227870, 7201080 224130, 7201570 224309, 7200847 223544, 7201675 225550, 7200110 224460, 7202790 224360, 7201890 225180, 7200440 227130, 7200080 223421, 7201338 8 Decline (Rose's Pride and Main 224580, 7202790 2 Portals Decline - includes box cuts, 225860, 7200080 surrounding laydowns etc.) Exploration All areas NA 10 2 Ancillary Waste Disposal Trench 225214, 7200536 22 Infrastructure 225490, 7200810 0.08 (included on TD1) 225240, 7200540 1.2 Clay Borrow ML80089, ML80088, 224040, 7200770 ML80144 227240, 7199650 Ancillary STP Irrigation Area 226550, 7199870 Infrastructure TSF2 Tailings and Return Ancillary Water Pipeline Infrastructure Ancillary Electrical Infrastructure 223942, 7202243 2.97 Infrastructure Material Transfer Material Transfer Area 225739, 7200137 6 Area Exploration Golden Plateau exploration 227307, 7200372 1.08 drive drive area 1 The locations of the mining activities referenced in Table A1 - Authorised Disturbance are described for interpretive purposes in figures contained in Schedule I.

    Waste, Land and soil
  8. Page 8

    Permit OFFICIAL Environmental Authority EPML00770913 A4 The environmental authority holder must: a) Install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) Maintain such measures, plant and equipment in a proper and efficient condition; c) Operate such measures, plant and equipment in a proper and efficient manner; and d) Ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated. A5 Notwithstanding any other condition of this environmental authority, the holder must not cause mining disturbance unless and until such time as that disturbance has an associated rehabilitation outcome provided for in the relevant PRCP Schedule. Monitoring A6 All monitoring data, records and reports required by this environmental authority or related to environmental management of the activities must be: a) Carried out by an appropriately qualified person, periodically reviewed and updated as required to reflect operational or environmental changes; b) Kept for a period of not less than five (5) years; c) Provided to the administering authority in the specified format within 10 business days of a request; and d) Undertaken in accordance with the most recent version of any applicable standard or guideline for the activity. A7 The following information must be recorded in relation to all monitoring required under a condition of this environmental authority: a) The date and time when the sample was taken; b) The location where the sample was taken; and c) Any other pertinent details of relevance to interpreting the sampling results (i.e. stream flow, wind conditions or any unusual observations such as odour or colouration). A8 The environmental authority holder must implement all reasonable measures necessary to conduct monitoring required under a condition of this environmental authority. Note: `Reasonable measures' could include establishing and maintaining safe all-weather access to a monitoring location by upgrading roads/tracks, use of suitable automated sampling devices, developing alternative routes or utilising alternative transport. Risk management A9 The environmental authority holder must develop and implement a risk management system for mining activities which mirrors the content requirement of the Standard for Risk Management (ISO31000:2009), or the latest edition of an Australian standard for risk management, to the extent relevant to environmental management, by 20 December 2021. Notification of emergencies, incidents and exceptions A10 The environmental authority holder must notify the administering authority within 24 hours of becoming aware of any emergency, incident, sample result or event which does or may contravene a condition of this environmental authority. A11 Within 10 business days following the initial notification of an emergency, event or incident, or receipt of monitoring results, whichever is the latter, further written advice must be provided to the administering authority, including the following:

    Rehabilitation, Air, Monitoring and reporting
  9. Page 9

    Permit OFFICIAL Environmental Authority EPML00770913 a) Results and interpretation of any samples taken and analysed; b) Outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and c) Proposed actions to prevent a recurrence of the emergency or incident. Complaints A12 The environmental authority holder must record all environmental complaints received about the mining activities including: a) Name, address and contact number for of the complainant; b) Time and date of complaint; c) Reasons for the complaint; d) Investigations undertaken; e) Conclusions formed; f) Actions taken to resolve the complaint; g) Any abatement measures implemented; and h) Person responsible for resolving the complaint. A13 When requested by the administering authority, the environmental authority holder must undertake specified monitoring within the timeframe nominated by the administering authority, to investigate any complaint related to the activity. Third-party reporting A14 The environmental authority holder must: a) By 30 June 2023, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) Obtain further such reports at regular intervals, not exceeding three (3) yearly intervals, from the completion of the report referred to above; and c) Provide each report to the administering authority within 90 days of its completion. A15 Disturbance due to exploration activities in areas not scheduled to be mined must be rehabilitated in accordance with provisions detailed in the administering authority's Code of Environmental Compliance for Exploration and Mineral Development Projects (the Code). Where there is a discrepancy between the Code and this environmental authority, the conditions of the environmental authority apply. END OF CONDITIONS FOR SCHEDULE A

    Rehabilitation, Monitoring and reporting
  10. Page 10

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule B - Air B1 The release of noxious or offensive odour, or any airborne contaminant, other than dust and particulate matter addressed by condition B2, resulting from the activities must not cause environmental nuisance or harm. B2 The environmental authority holder shall ensure that all reasonable and feasible avoidance and mitigation measures are employed so that the dust and particulate matter emissions generated by the mining activities do not cause exceedances of the following levels when measured at any sensitive or commercial place: a) Dust deposition of 120 milligrams per square metre per day, averaged over one month, when monitored in accordance with the most recent version of Australian Standard AS3580.10.1 Methods for sampling and analysis of ambient air--Determination of particulate matter--Deposited matter - Gravimetric method. b) A concentration of particulate matter with an aerodynamic diameter of less than 10 micrometres (PM10) suspended in the atmosphere of 50 micrograms per cubic metre over a 24-hour averaging time, for no more than five exceedances recorded each year, when monitored in accordance with the most recent version of either: 1. Australian Standard AS3580.9.6 Methods for sampling and analysis of ambient air-- Determination of suspended particulate matter--PM10 high volume sampler with size-selective inlet - Gravimetric method, or 2. Australian Standard AS3580.9.9 Methods for sampling and analysis of ambient air-- Determination of suspended particulate matter--PM10 low volume sampler--Gravimetric method. c) A concentration of particulate matter with an aerodynamic diameter of less than 2.5 micrometres (PM2.5) suspended in the atmosphere of 20 micrograms per cubic metre over a 24-hour averaging time, when monitored in accordance with the most recent version of AS/NZS3580.9.10 Methods for sampling and analysis of ambient air--Determination of suspended particulate matter--PM (sub)2.5(/sub) low volume sampler--Gravimetric method. d) A concentration of particulate matter suspended in the atmosphere of 90 micrograms per cubic metre over a 1 year averaging time, when monitored in accordance with the most recent version of AS/NZS3580.9.3:2003 Methods for sampling and analysis of ambient air--Determination of suspended particulate matter--Total suspended particulate matter (TSP)--High volume sampler gravimetric method. END OF CONDITIONS FOR SCHEDULE B

    Air, Monitoring and reporting
  11. Page 11

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule C - Waste Management C1 All waste generated as part of the mining activities must be disposed of in a lawful manner at an off-site facility, with the exception of: a) Waste rock and tailings, which must be characterised, handled and disposed of or used in accordance with condition C4 of this environmental authority; b) Timber pallets; c) Used rubber mill liners, milled plastic trash, rock chips in plastic bags (from exploration drilling), and explosives packaging and consumables comprising cardboard, plastic bags, plastic hoses and associated consumables that are free of explosives, may be disposed of in the tailings dam subject to C5; and d) Tyres, subject to condition C3. Note: The only waste authorised to be burnt on site is explosive boxes, so long as the burning does not cause environmental harm. C2 General waste must only be disposed of into the waste disposal trench facility of ML80089 and identified in Schedule J Figure 3 - Waste Disposal Trench ML80089. C3 Subject to demonstrating to the administering authority that no other use higher in the waste management hierarchy can be practicably implemented, waste tyres generated from mining activities may be disposed of on site in non-acid forming waste rock dumps or underground stopes. C4 All waste rock and tailings must be: a) Geochemically characterised and disposed of, or used, in a manner that minimises the potential generation and/or release of contaminants to the receiving environment; and b) Where the geochemical characteristics of waste rock is uncertain, this material must be treated as potentially acid and metalliferous drainage forming until demonstrated otherwise; and c) Where the geochemical characterisation demonstrates that waste rock is benign waste rock it may be used on site for rehabilitation activities in accordance with the conditions of this environmental authority; and d) Details pertaining to meeting the requirements of this condition must be recorded and retained until this environmental authority is surrendered. C5 The location of the waste mentioned in condition C1(c) and (d) in the tailings dam must be recorded and made available to the administering authority on request. C6 The holder of the environmental authority must develop and implement a waste rock management plan, certified by an appropriately qualified person that the plan is compliant with the conditions in this environmental authority and in accordance with best practice environmental management. C7 The waste rock management plan must demonstrate that the use and disposal of waste rock will ensure an outcome that is safe, non-polluting, self-sustaining, geotechnically and geochemically stable. The waste rock management plan must include: a) Geochemical characterisation that includes: i. an assessment of the likelihood to produce acid and metalliferous drainage; and ii. an assessment of the metal / metalloids listed in Table E7* (excluding cyanide) and their mobility; b) selective handling techniques to ensure placement, disposal and use of waste rock is according to characterisation results, use and disposal strategies; c) a program of progressive characterisation of waste rock to validate selective handling techniques, use and disposal strategies; d) records of all waste rock characterisation and its final use; e) contingency planning for the management of contaminated drainage (including acid and metalliferous drainage);

    Rehabilitation, Regulated structures, Waste, Monitoring and reporting
  12. Page 12

    Permit OFFICIAL Environmental Authority EPML00770913 f) a materials balance, use and disposal plan demonstrating how waste rock will be selectively placed and/or encapsulated to minimise the generation of contaminated drainage (including acid and metalliferous drainage); g) a regular review process to ascertain the performance of the plan; and h) monitoring to confirm that the use and disposal of the material will ensure an outcome that is safe, non- polluting, self-sustaining, geotechnically and geochemically stable. *Note: Reference to Table E7 is a reference to the quality characteristics and not the contaminant limits. C8 The waste rock management plan must be provided to the administering authority upon request. Sewage Treatment C9 All effluent released from the sewage treatment facilities must be monitored at the frequency and for the parameters specified in Table C1 - Sewage effluent quality targets for dust suppression, irrigation or recycling. Table C1 - Sewage effluent quality targets Quality Release limit Units Limit type Monitoring characteristics 6.5 to 8.5 pH Units Range frequency pH Monthly Nitrogen 30 mg/L Maximum Monthly Phosphorus 15 mg/L Maximum Monthly E. coli 1000 Organisms/100mL Maximum Monthly C10 Sewage effluent used directly from the sewage treatment facilities for dust suppression, irrigation or recycling must not exceed sewage effluent release limits defined in Table C1 - Sewage effluent quality targets. C11 Sewage effluent used for dust suppression or irrigation must not cause spray drift or over spray to any sensitive or commercial place. C12 Sewage effluent from sewage treatment facilities not used for dust suppression or irrigation must be reused or evaporated. C13 Solids that accumulate in the sewage treatment facilities (including the evaporation pond) are to be removed by an appropriately licensed regulated waste transporter and disposed of under the terms and conditions of the licence. C14 Sewage effluent irrigation areas must have a separation distance of at least thirty (30) metres from any groundwater bores and surface waters. C15 The irrigation of treated effluent must be carried out in a manner such that: a) Vegetation is not damaged; b) Soil erosion and soil structure damage is avoided; c) There is no surface ponding of treated effluent; d) Percolation of treated effluent beyond the plant root zone is minimised; e) The capacity of the land to assimilate nitrogen, phosphorus, salts, water and organic matter (as measured by oxygen demand) is not exceeded; and f) The quality of groundwater is not adversely affected. C17 Notices must be prominently displayed on any treated effluent irrigation area warning staff and the public that the area is irrigated with treated effluent and not to use or drink the treated effluent. These notices must be maintained in a visible and legible condition.

    Groundwater, Surface water, Air, Waste, Land and soil, Biodiversity, Monitoring and reporting
  13. Page 13

    Permit OFFICIAL Environmental Authority EPML00770913 C17 The daily volume of contaminants released to land must be determined by an appropriate method, for example a flow meter and records kept of such determinations. END OF CONDITIONS FOR SCHEDULE C

    Monitoring and reporting
  14. Page 14

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule D - Noise Noise limits D1 The environmental authority holder must ensure that noise generated by the mining activities does not cause the criteria in Table D1 to be exceeded at a sensitive place or commercial place. Table D1 - Noise Limits ('Table D1') (includes construction activities) Noise level dB(A) measured as: All days 7am to 6pm 6pm to 10pm 10pm to 7am Noise measured at a `Noise sensitive place' LAeq, adj, 1 hr 42 42 35 LA1, adj, 1 hr 52 52 47 Noise measured at a `Commercial place' Noise level dB(A) measured as: All days 7am to 6pm 6pm to 10pm 10pm to 7am 42 LAeq, adj, 1 hr 47 47 Airblast overpressure nuisance D2 The environmental authority holder must ensure that blasting does not cause the limits for peak particle velocity and air blast overpressure in Table D2 to be exceeded at a sensitive place or commercial place. Table D2 - Blasting noise and vibration limits (`Table D2') Blasting noise Sensitive place and commercial place criteria and vibration limits Monday to Friday 7am to 6pm Monday to Friday 6pm to 7am, Monday to Friday Saturday, Sunday and Public Sunday and Public Holidays - 6pm to 7am, Sunday Airblast and Public Holidays overpressure Holidays 9am - 6pm Underground Workings Open Cut Pits and Underground - Open Cut Pits Ground vibration 115dB (Linear) Peak for 9 out of 10 No blasting peak particle Workings consecutive blasts initiated and not velocity 115dB (Linear) Peak for 9 out of 10 greater than 120 dB (Linear) Peak No blasting consecutive blasts initiated and not greater than 120 dB (Linear) Peak at any time 5mm/second peak particle velocity at any time for 9 out of 10 consecutive blasts 5mm/second peak particle velocity and not greater than 10 mm/second for 9 out of 10 consecutive blasts peak particle velocity at any time and not greater than 10 mm/second peak particle velocity at any time

    Noise and vibration
  15. Page 15

    Permit OFFICIAL Environmental Authority EPML00770913 Monitoring and reporting D3 All monitoring of noise emissions from the activity must be undertaken in accordance with the most recent Standard and the Environmental Protection Regulation 2019 (Chapter 5, Part 4). D4 Noise monitoring and recording must include the following descriptor characteristics and matters: a) L (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins) AN,T b) background noise LA90 c) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels d) atmospheric conditions including temperature, relative humidity and wind speed and directions e) effects due to any extraneous factors such as traffic noise f) location, date and time of monitoring g) if the complaint concerns low frequency noise, Max LpLIN,T and one third octave band measurements in dB(LIN) for centre frequencies in the 10 - 200 Hz range. Note: Noise and blast monitoring as required by the administering authority in accordance with Schedule A - condition A13 END OF CONDITIONS FOR SCHEDULE D

    Noise and vibration, Monitoring and reporting
  16. Page 16

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule E - Water E1 Contaminants that will or have the potential to cause environmental harm must not be released directly or indirectly to any waters except as permitted under the conditions of this environmental authority. E2 The release of contaminants to waters must only occur from the release points specified in Table E1 - Contaminant Release Points, Sources and Receiving Waters. Table E1 - Contaminant Release Points, Sources and Receiving Waters Release Point Location Contaminant Source and Monitoring Point Receiving waters (RP) (GDA94, Zone 56) Location description Easting Northing SW11 228 381 E 7 201 255 N Historical waste dump ML3228 Mid point of dam Boughyard Creek SW12 227 099 E 7 199 596 N SW13 226 520 E 7 199 870 N Ore treatment plant collection Mid point of dam Boughyard Creek SW14 225 435 E 7 200 148 N dam SW15 225 484 E 7 200 007 N SW16 226 050 E 7 200 222 N TSF Spillway Orange Creek Decline/ workshop/admin area Mid point of dam Orange Creek collection dams Orange Creek Treated effluent Sewage treatment plant tank TSF seepage collection dam Mid point of dam Orange Creek SW20 227 151 E 7 199 782 N Tailings Dam 2 sediment dam Mid point of dam Boughyard Creek SW31 226 340 E 7 202 100 N SW32 224 180 E 7 202 790 N Tailings Dam 4 seepage Mid point of dam Orange Creek SW331 226 470 E 7 201 780 N collection dam Mid point of dam Orange Creek Rose's Pride surface area collection dam Spillway Orange Creek Tailings Dam 4 SW35 228 360 E 7 199 210 N Historical tailings spill ML3219 SE end of Boughyard Creek ML3234 SW36 228 670 E 7 199 670 N Historical workings on ML3219 South end of Boughyard Creek ML3219 Waterfall SW37 228 050 E 7 201 662 N Historical waste dump upstream of Boughyard Creek Klan's Dam SW19 1 The release of contaminants from release point SW33 must not occur after the spillway is relocated to (GDA94 Zone 56): 226 859 E, 7 202 034 N). E3 The release of contaminants to waters must not exceed the release limits stated in Table E2 - Contaminant Release Limits, when measured at the monitoring points specified in Table E1 - Contaminant Release Points, Sources and Receiving Waters for each quality characteristic.

    Surface water, Regulated structures, Waste, Land and soil, Monitoring and reporting
  17. Page 17

    Permit OFFICIAL Environmental Authority EPML00770913 Table E2 - Contaminant Release Limits Quality Characteristic Interim Release Release Future Release Limits from 31 December 2012. Note: Monitoring Limits Limits - These future limits will apply from a yet to be negotiated Frequency SW13 and date using alternative numbers that will be derived from SW33 the information gathered by any combination of the Orange following: Creek Catchment (1) the results of near field monitoring, (2) any studies or investigations carried out in accordance with recommendations 2 & 3 of the Cumulative Impact Study on water quality in the Fitzroy River Basin. (3) any review of the QLD Water Quality Guidelines. (4) other relevant information Note: This information should be available by the end of 2012 if not before and when it becomes available limits will be determined for each mine site based on the environmental values to be protected and in accordance with criteria below. Electrical conductivity (uS/cm) 1500 210# Aquatic ecosystem protection (no drinking Daily during water value): release (first pH (pH Unit) 6.5 (minimum) 6.5 -8.5 [2] sample must be 9.0 (maximum) 50 [2] An end-of-pipe limit to achieve in the range 0 to taken within 2 Turbidity (NTU) 10 [2] 1000 EC in the receiving waters. hours of NA* 25 [2] commencement Suspended Solids (mg/L) 200 6.5 (minimum) of release) 400 9.0 (maximum) Sulphate Limit to be determined based on receiving (SO42-) (mg/L) water reference data Cyanide (as un-ionised HCN; measured as [CN]) for = Limit to be determined based on receiving 0.007mg/L (or 7-g/L) water reference data and achievable best Aluminium (mg/L) practice sedimentation control and treatment Arsenic (mg/L) Cadmium (mg/L) 0.007[1] 0.004 [9] 0.007 Chromium(mg/L) Copper (mg/L) 0.055[1] 0.055[1] Iron (mg/L) 0.013[1] Lead (mg/L) Mercury (mg/L) 0.0002[1] Nickel (mg/L) Zinc (mg/L) 0.001[1] Boron (mg/L) Cobalt (mg/L) 0.002[1] 0.0034[1] Limit to be determined based on receiving Daily during Manganese(mg/L) 0.3[1] water reference data. release (first sample must be Molybdenum (mg/L) 0.01[3] Limit to be determined based on receiving taken within 2 Selenium (mg/L) water reference data. hours of Silver (mg/L) 0.0002 [5] 0.0006[1] commencement Uranium (mg/L) 0.0014[1] of release). Vanadium (mg/L) 0.011[1] Ammonia (mg/L) 0.008[1] Daily during 0.37[1] release (first Nitrate (mg/L) sample must be Petroleum hydrocarbons (mg/L) 0.09[4] taken within 2 hours of 1.9[1] commencement of release). 0.034[1] 0.01[3] 0.011[1] 0.001[3] 0.00005[10] 0.001[3] 0.0005[2] 0.01[3] 0.006[2] 0.9[1] 0.02[2] 1.1 [6] NA 0.02 No sheen or

    Surface water, Land and soil, Monitoring and reporting
  18. Page 18

    Permit OFFICIAL Environmental Authority EPML00770913 Quality Characteristic Interim Release Release Future Release Limits from 31 December 2012. Note: Monitoring Limits Limits - These future limits will apply from a yet to be negotiated Frequency SW13 and date using alternative numbers that will be derived from SW33 the information gathered by any combination of the Orange following: Creek Catchment (1) the results of near field monitoring, (2) any studies or investigations carried out in accordance with recommendations 2 & 3 of the Cumulative Impact Study on water quality in the Fitzroy River Basin. (3) any review of the QLD Water Quality Guidelines. (4) other relevant information Note: This information should be available by the end of 2012 if not before and when it becomes available limits will be determined for each mine site based on the environmental values to be protected and in accordance with criteria below. Petroleum hydrocarbons (C10- 0.1 residue C36) (mg/L) Fluoride (total) (mg/L) 2 [7] 1.5 [8] NA - not available, * local trigger values need to be developed Note 1. All metals and metalloids must be measured as total (unfiltered) and dissolved (filtered). Limits for metal/metalloids apply if dissolved results exceed trigger. Note 2: LOR - typical reporting for method stated. ICPMS/CV FIMS - analytical method required to achieve LOR. Note 3: Cyanide contaminant release limits apply at release points SW12, SW13, SW16, SW20, SW31, SW38 and SW33 only [1] Limit based on the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018 95% level protection (% species) [2] Limit based on the Environmental Protection (Water) Policy 2009 Dawson River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), including all waters of the Dawson River Sub-basin except the Callide Creek Catchment, September 2011, State of Queensland [3] Limit based on the LOR for ICPMS. [4] Limit based on the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000 moderate reliability for 95% level of protection (% species). [5] For aquatic ecosystem protection, based on LOR for CV FIMS [6] For aquatic ecosystem protection, based on ambient Qld WQ Guidelines (2006) for TN [7] Limit based on the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000 livestock drinking water short term trigger value in irrigation water. [8] Limit based on Queensland Drinking Water Guidelines [9] Limit based on the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018 99% level protection (% species) [10] Note that the LOR for ICPMS for Silver is 0.0001mg/L. # for high flow conditions as per the Environmental Protection (Water) Policy 2009 Dawson River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), including all waters of the Dawson River Sub-basin except the Callide Creek Catchment, September 2011, State of Queensland E4 The release of contaminants to waters from the release points must be monitored at the locations specified in Table E1 - Contaminant Release Points, Sources and Receiving Waters for each quality characteristic and at the frequency specified in Table E2 - Contaminant Release Limits. E5 The environmental authority holder must install, operate and maintain a stream flow gauging station to determine and record stream flows at the locations upstream of each Release Point as specified in Table E3 - Contaminant Release during Flow Events for any receiving water into which a release occurs.

    Surface water, Monitoring and reporting
  19. Page 19

    Permit OFFICIAL Environmental Authority EPML00770913 E6 Notwithstanding any other condition of this environmental authority, the release of contaminants to waters must only take place during periods of natural flow events specified as minimum flow in Table E3 - Contaminant Release during Flow Events for the contaminant release point(s) specified in Table E1 - Contaminant Release Points, Sources and Receiving Waters. Table E3 - Contaminant Release during Flow Events Receiving water Release Point Gauging station Location Minimum Flow in Flow description description (GDA94, Zone 56) Receiving Water recording Required for a Frequency Easting Northing Release Event Boughyard Creek SW12 Gauging Station 229690 E 7200162 N 0.18 m3/sec* Continuous SW20 SW25 (Auto) (minimum daily) SW38 Orange Creek SW13 Gauging Station 224842 E 7199786 N 0.63 m3/sec* Continuous SW14 SW6 (Auto) (minimum daily) SW16 SW31 SW32 *Based on flow volume data for Orange and Boughyard Creeks provided by Newcrest Operations Limited. E7 Contaminant release flow rate must not exceed twenty percent (20%) of receiving water flow rate. E8 The daily quantity of contaminants released from each release point must be measured and recorded at the monitoring points in Table E1 - Contaminant Release Points, Sources and Receiving Waters. E9 Releases to waters must be undertaken so as not to cause erosion of the bed and banks of the receiving waters, or cause a material build-up of sediment in such waters. E10 The environmental authority holder must notify the administering authority as soon as practicable but no later than six (6) hours of having commenced a release of contaminants to waters. Notification must include the submission of written verification to the administering authority of the following information: a) Release commencement date/time; b) Expected release cessation date/time; c) Release point/s; d) Release volume (estimated); e) Receiving water/s including the natural flow rate; and f) Any details (including available data) regarding likely impacts on the receiving water(s). Note: Notification to the administering authority must be addressed to the Manager and Project Manager of the local administering authority via email or facsimile. E11 The environmental authority holder must notify the administering authority as soon as practicable, (nominally within twenty-four (24) hours after cessation of a release) of the cessation of a release and within twenty-eight (28) days provide the following information in writing: a) Release cessation date/time; b) Natural flow volume in receiving water; c) Volume of water released; d) Details regarding the compliance of the release with the conditions of Department Interest: Water of this environmental authority (i.e. contamination limits, natural flow, discharge volume); e) All in-situ water quality monitoring results; and f) Any other matters pertinent to the water release event

    Surface water, Land and soil, Monitoring and reporting
  20. Page 20

    Permit OFFICIAL Environmental Authority EPML00770913 E12 If the release limits defined in Table E2 - Contaminant Release Limits are exceeded, the environmental authority holder must notify the administering authority within twenty-four (24) hours of receiving the results. E13 The environmental authority holder must, within twenty-eight (28) days of a release that exceeds the conditions of this environmental authority, provide a report to the administering authority detailing: a) The reason for the release; b) The location of the release; c) All water quality monitoring results; d) Any general observations; e) All calculations; and f) Any other matters pertinent to the water release event. E14 The quality of the receiving waters must be monitored at the locations specified in Table E5 - Receiving Water Upstream Background Sites and Down Stream Monitoring Points for each quality characteristic and at the monitoring frequency stated in Table E4 - Receiving Waters Contaminant Trigger Levels. Table E4 - Receiving Waters Contaminant Trigger Levels Quality Characteristic Trigger Level Trigger Level (Orange Monitoring Frequency Creek Catchment pH 6.5 - 8.0 SW-OC1: No release - 6.5 - 8.5[5] Monthly. During a release - Electrical Conductivity (S/cm) 1000 340# Daily. All other locations: daily Suspended solids (mg/L) To be determined* 10[3] during the release Sulphate (SO42-) (mg/L) 250 25[5] Aluminium (mg/L) 0.055 Arsenic (mg/L) 0.013 Cadmium (mg/L) 0.0002 Chromium (mg/L) 0.001 Copper (mg/L) 0.002 Cyanide (as un-ionised HCN; 0.007 0.004[2] measured as [CN]) for = 0.3 0.007mg/L (or 7-g/L) Iron (mg/L) Lead (mg/L) 0.01 0.0034[5] Mercury (mg/L) 0.0002 0.0006[5] Nickel (mg/L) 0.011 Zinc (mg/L) 0.008 Boron (mg/L) 0.37 Cobalt (mg/L) 0.09 0.0014[5] Manganese (mg/L) 1.9 Molybdenum (mg/L) 0.034 Selenium (mg/L) 0.01 0.011[5] Silver (mg/L) 0.001 0.00005[6] Uranium (mg/L) 0.001 0.0005[5] Vanadium (mg/L) 0.01 0.006[5] Ammonia (mg/L) 0.9 0.068[4] Nitrate (mg/L) 1.1 NA Total Nitrogen (mg/L) NA 0.5[5] Fluoride (mg/L) 2 1.5 *Note: To be revised based on receiving water reference data. [2] 99% protection of species [3] Trigger applies to Baseflow conditions [4] Interim trigger based on 80th percentile of SW3 data (2010-2017).

    Surface water, Monitoring and reporting
  21. Page 21

    Permit OFFICIAL Environmental Authority EPML00770913 Quality Characteristic Trigger Level Trigger Level (Orange Monitoring Frequency Creek Catchment [5] Limit based on the Environmental Protection (Water) Policy 2009 Dawson River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), including all waters of the Dawson River Sub-basin except the Callide Creek Catchment, September 2011, State of Queensland [6] Note that the LOR for ICPMS for Silver is 0.0001mg/L. # for baseflow conditions as per the Environmental Protection (Water) Policy 2009 Dawson River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), including all waters of the Dawson River Sub-basin except the Callide Creek Catchment, September 2011, State of Queensland Table E5 - Receiving Water Upstream Background Sites and Down Stream Monitoring Points Location Monitoring Points Receiving Waters Location Description (GDA95, Zone 56) Easting Northing Upstream Background Monitoring Points SW3 (Group 1) Orange Creek - upstream of SW31 226000 E 7203500 N SW17 (Group 4) 229430 E 7202470 N SW B2 (Group 5) Boughyard Creek - upstream SW19. SW11 230000 E 7201000 N Boughyard Creek - tributary from Golden SW C1 (Group 6) Mile Pit 227350 E 7199250 N Boughyard Creek - upstream of tailings TBA contamination within ML3224 TBA TBA SW41 Boughyard Creek - upstream of tailings 224258 E 7203593 N storage (TD4) within ML3230 Roses Pride - upstream monitoring location Downstream Monitoring Points SW9 (Group 1) Orange Creek - downstream of SW3, SW31 225500 E 7200950 N SW6 (Group 2) (TD4), SW13 (CEX), ML3230, ML80024 224842 E 7199786 N SW6 (Group 3) Orange Creek - downstream of overflow 224542 E 7199786 N SW25 (Group 4) contamination from SW21, SW14, SW15 229690 E 7200162 N (mine workshop and dams), ML80088, SW7 (Group 5) 229490 E 7198890 N SW18 (Group 6) ML80089 228790 E 7197800 N Orange Creek - downstream of overflow contamination from SW1, SW13, SW14, SW15, SW16 Boughyard Creek - SW11, SW19, SW17, downstream of Golden Plateau rock dumps, ML3230, ML3243, ML3228, ML3232, ML3227 Boughyard Creek - downstream of B1, Golden Mile pit, ML3219, ML3232 Boughyard Creek - downstream of historic tailings on ML3234 SW9 (Group 2) Orange Creek - upstream of SW14, SW15, 225500 E 7200950 N SW21 SW1 (Group 3) Orange Creek - upstream of SW13, 226250 E 7200480 N downstream of SW14, SW15 SW16 SW-OC1 Orange Creek - TSF1 Seepage monitoring 225353 E 7200313 N SW39 Orange Creek - TSF2 Surface water 222190 E 7203256 N monitoring SW40 Roses Pride - downstream monitoring 222973 E 7203461 N location Note: The data from background monitoring points must not be used where they are affected by releases from other mines. TBA - To be advised following consultation with the administering authority to update Table E2 - Contaminant Release Limits

    Surface water, Regulated structures, Waste, Monitoring and reporting
  22. Page 22

    Permit OFFICIAL Environmental Authority EPML00770913 E15 If quality characteristics of the receiving water at the downstream monitoring points exceed any of the trigger levels specified in Table E4 - Receiving Waters Contaminant Trigger Levels during a release event the environmental authority holder must compare the downstream results to the upstream results in the receiving waters and: a) Where the downstream result is the same or a lower value than the upstream value for the quality characteristic then no action is to be taken; or b) Where the downstream results exceed the upstream results complete an investigation in accordance with the ANZECC & ARMCANZ 2000 methodology, into the potential for environmental harm and provide a written report to the administering authority in the next annual return, outlining: i. Details of the investigations carried out; and ii. Actions taken to prevent environmental harm. Note: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with E15(b) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic. E16 The environmental authority holder must develop and implement a REMP for all stages of the activity to monitor, identify and describe any adverse impacts to receiving water environmental values, quality and flows due to the authorised activity. This must include monitoring the effects of the mine on the receiving environment periodically (under natural flow conditions) and while contaminants are being discharged from the site. For the purposes of the REMP, the receiving environment is all underlying groundwaters and the waters of the Dawson River and connected waterways within 15km downstream of the release. The REMP should encompass any sensitive receiving waters or environmental values downstream of the authorised activity that will potentially be directly affected by an authorised release of contaminants. E17 The REMP must address (but not necessarily be limited to) the following: a) Description of potentially affected receiving waters including key communities and background water quality characteristics based on accurate and reliable monitoring data that takes into consideration any temporal variation (e.g. seasonality); b) Description of applicable environmental values and water quality objectives to be achieved (i.e. as scheduled pursuant to the Environmental Protection (Water) Policy 2009); c) Any relevant reports prepared by other governmental or professional research organisations that relate to the receiving environment within which the REMP is proposed; d) Water quality targets within the receiving environment to be achieved, and clarification of contaminant concentrations or levels indicating adverse environmental impacts during the REMP; e) Monitoring for any potential adverse environmental impacts caused by the release; f) Monitoring of stream flow and hydrology; g) Monitoring of toxicants should consider the indicators specified in Table E2 - Contaminant Release Limits to assess the extent of the compliance of concentrations with water quality objectives and/or the ANZECC & ARMCANZ 2000 guidelines for slightly to moderately disturbed ecosystems; h) Monitoring of physical chemical parameters as a minimum those specified in Table E2 - Contaminant Release Limits (in addition to dissolved oxygen saturation and temperature); i) Monitoring biological indicators (for macroinvertebrates in accordance with the AusRivas methodology) and metals/metalloids in sediments (in accordance with ANZECC & ARMCANZ 2000, BATLEY and/or the most recent version of AS5667.1 Guidance on Sampling of Bottom Sediments) for permanent, semi- permanent water holes and water storages; j) The locations of monitoring points (including the locations specified in Table E5 Receiving Water Upstream Background Sites and Down Stream Monitoring Points which are background and downstream impacted sites for each release point); k) The frequency or scheduling of sampling and analysis sufficient to determine water quality objectives and to derive site specific reference values within two (2) years (depending on wet season flows) in

    Groundwater, Surface water, Land and soil, Monitoring and reporting
  23. Page 23

    Permit OFFICIAL Environmental Authority EPML00770913 accordance with the Queensland Water Quality Guidelines 2009. For ephemeral streams, this should include periods of flow irrespective of mine or other discharges; l) The tailored inclusion of dry season monitoring along Boughyard Creek to ensure water quality and potential impacts of shallow groundwater expressions during the dry season; m) Specify sampling and analysis methods and quality assurance and control; n) Any historical datasets to be relied upon; o) Description of the statistical basis on which conclusions are drawn; and p) Any spatial and temporal controls to exclude potential confounding factors. E18 A report outlining the findings of the REMP, including all monitoring results and interpretations in accordance with condition E17 must be prepared annually and made available on request to the administering authority. This must include an assessment of background reference water quality, the conditions of downstream water quality compared against water quality objectives, and the suitability of current discharge limits to protect downstream environment values. E19 All determinations of water quality must be: a) Performed by a person or body possessing appropriate experience and qualifications to perform the required measurements; b) Made in accordance with methods prescribed in the latest edition of the administering authority's Water Quality Sampling Manual; c) Collected from the monitoring locations identified within this environmental authority, within ten (10) hours of each other where possible; d) Carried out on representative samples; and e) Laboratory testing must be undertaken using a laboratory accredited (e.g. NATA) for the method of analysis being used. Note: Condition E19 requires the Water Quality Manual to be followed and where it is not followed because of exceptional circumstances this should be explained and reported with the results. E20 The release of contaminants directly or indirectly to waters: a) Must not produce any visible discolouration of receiving waters; and b) Must not produce any slick or other visible or odorous evidence of oil, grease or petrochemicals nor contain visible floating oil, grease, scum, litter or other objectionable matter. E21 The following information must be recorded in relation to all water monitoring required under the conditions of this environmental authority and submitted to the administering authority in the specified format with each annual return: a) The date on which the sample was taken; b) The time at which the sample was taken; c) The monitoring point at which the sample was taken; d) The measured or estimated daily quantity of the contaminants released from all release points; e) The release flow rate at the time of sampling for each release point; f) The results of all monitoring and details of any exceedances with the conditions of this environmental authority; and g) Water quality monitoring data must be provided to the administering authority in the specified electronic format upon request. E22 A Water Management Plan must be implemented and maintained that provides for the proper and effective management of the actual and potential environmental impacts resulting from the mining activity and to ensure compliance with the conditions of this environmental authority. E23 The water management plan must include at least the following components: a) Contaminant source study;

    Groundwater, Surface water, Monitoring and reporting
  24. Page 24

    Permit OFFICIAL Environmental Authority EPML00770913 b) Site water balance and model; c) Water management system; d) Saline drainage prevention and management measures; e) Acid and metalliferous drainage prevention and management measures (if applicable); f) Emergency and contingency planning; and g) Monitoring and review. E24 Each year the environmental authority holder must undertake a review of the water management plan prior to the wet season (i.e. by 1 November) and a further review following the wet season (i.e. by 1 May the following year) to ensure that proper and effective measures, practices or procedures are in place so that the mine is operated in accordance with the conditions of this environmental authority and that environmental harm is prevented or minimised. E25 A copy of the water management plan and/or a review of the water management plan must be provided to the administering authority on request. E26 The environmental authority holder must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of saline drainage. E27 The environmental authority holder must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of acid and metalliferous drainage. E28 An erosion and sediment control plan must be developed by an appropriately qualified person and implemented for all stages of the mining activities on the site to minimise erosion and the release of sediment to receiving waters and contamination of stormwater. E29 The maintenance and cleaning of any vehicles, plant or equipment must not be carried out in areas from which contaminants can be released into any receiving waters. E30 Any spillage of wastes, contaminants or other materials must be cleaned up as quickly as practicable to minimise the release of wastes, contaminants or materials to any stormwater drainage system or receiving waters. E31 The administering authority and the environmental authority holder both acknowledge that the conditions for release of contaminants to Orange Creek, Boughyard Creek and the Dawson River in this environmental authority have been calculated without the benefit of the findings of projects proposed to be undertaken as per recommendations 2 and 3 of the Study of cumulative impacts on water quality of mining activities in the Fitzroy River Basin (April 2009). The administering authority may, based on the information provided in the study report when it becomes available, all relevant information available at the time and the regulatory framework applicable at that time, consult with the environmental authority holder about the conditions in the environmental authority concerning the treatment and disposal of waste water. The aim of the consultation shall be the meaningful review of the contaminant release limits imposed in this authority having regard to: a) The study results; b) Near field monitoring results; c) QLD Water Quality Guidelines; and d) Best practice environmental management. If this review leads to a change in the requirements on this environmental authority holder, this shall be advanced by way of an authority amendment or a Transitional Environmental Program and as is necessary or desirable. Groundwater E32 Contaminants must not be released directly or indirectly to any groundwater. E33 The taking of or interference with groundwater must not cause environmental harm to any groundwater dependant ecosystems.

    Groundwater, Surface water, Waste, Land and soil, Monitoring and reporting
  25. Page 25

    Permit OFFICIAL Environmental Authority EPML00770913 E34 The Groundwater Management Program developed by an appropriately qualified person must be implemented and maintained by the environmental authority holder. E35 The Groundwater Management Program required by condition E34 must: a) identify potential sources of contamination and impacts to groundwater from the activity; and b) ensure that all potential groundwater impacts due to the activity are identified, mitigated and monitored; and c) document sampling and monitoring methodology; and d) ensure that adequate groundwater monitoring and data analysis is undertaken to achieve the following objectives: i. detect any impacts to groundwater levels due to the activity; and ii. detect any impacts to groundwater quality due to the activity; and iii. determine compliance with condition E45; and iv. determine trends in groundwater quality showing decreasing and increasing trends; and e) include an appropriate quality assurance and quality control program; and f) include a groundwater model which includes an assessment of current seepage rates and predicted post- mining seepage rates; and g) include a review process to identify improvements to the program that includes addressing any comments provided by the administering authority. E36 The Groundwater Management Program must be reviewed annually by an appropriately qualified person. The review must include at a minimum: a) an assessment that the Groundwater Monitoring and Management Program continues to meet the requirements stated in condition E35; and b) a review of all the historical groundwater data against the limits specified in Table E7 - Groundwater quality limits; and c) determine the representativeness of current groundwater conditions and suitability of Limit A and Limit B in Table E7 - Groundwater quality limits; and d) an assessment of the suitability of the monitoring network for groundwater specified in Table E6 - Groundwater monitoring locations and frequency to detect impacts from the mining activities; and e) where relevant information gaps or uncertainty are identified as pertinent to the accuracy of the investigations finding/conclusions, include recommendations and associated timeframes to address those information gaps and resolve uncertainty. E37 The Groundwater Management Program and annual review required under condition E36 must be provided to the administering authority annually from 30 January 2022. E38 The holder of the environmental authority must report the results and analysis of groundwater monitoring to the administering authority on request. E39 Groundwater levels must be monitored, and groundwater draw down fluctuations in excess of two (2) metres per year, not resulting from the pumping of licensed bores, must be notified as per conditions A10 - A11. E40 Groundwater quality and standing water level must be monitored: a) at the locations specified in Table E6 - Groundwater monitoring locations and frequency; and b) at the frequencies specified in Table E6 - Groundwater monitoring locations and frequency; and c) for the quality characteristics identified in Table E7 - Groundwater quality limits for the hydrogeological feature in which the bore is located. E41 Groundwater measured from any compliance bore specified in Table E6 - Groundwater monitoring locations and frequency must not exceed the corresponding Limit A specified in Table E7 - Groundwater quality limits on any five consecutive sampling occasions. E42 Groundwater measured from any compliance bore specified in Table E6 - Groundwater monitoring locations and frequency must not exceed the corresponding Limit B specified in Table E7 - Groundwater quality limits on any three consecutive sampling occasions. E43 If groundwater measured from any compliance bore specified in Table E6 - Groundwater monitoring locations and frequency exceeds the corresponding Limit B specified in Table E7 - Groundwater quality

    Groundwater, Monitoring and reporting
  26. Page 26

    Permit OFFICIAL Environmental Authority EPML00770913 limits on any one sampling occasion the environmental authority holder must resample the groundwater within the compliance bore for all exceeding quality characteristics within ten business days of receipt of results. E44 If groundwater measured from any compliance bore specified in Table E6 - Groundwater monitoring locations and frequency exceeds the corresponding Limit B specified in Table E7 - Groundwater quality limits on any one sampling occasion the environmental authority holder must review and implement actions identified in the Groundwater Management Program and Seepage Management Plan as required by condition E34 and E52 for effectiveness within ten business days of receipt of resampled results and document the review. Note: The resampling event is not considered a sampling occasion and therefore not a consecutive exceedance of the Limit B for the quality characteristic/s for the purposes of condition E42. E45 From 30 July 2021, the environmental authority holder must ensure that the groundwater quality measured in operational bores specified in Table E6 - Groundwater monitoring locations and frequency does not have increasing trends. E46 The following information must be recorded in relation to all groundwater sampling: a) The date on which the sample was taken; b) The time at which the sample was taken; c) The monitoring point at which the sample was taken; and d) The results of all monitoring. E47 Monitoring and sampling must be carried out in accordance with written procedures and must address the requirements of the latest version of the following documents unless otherwise approved by the administering authority: a) for waters and aquatic environments, Monitoring and Sampling Manual: Environmental Protection (Water) b) for groundwater, Groundwater Sampling and Analysis - A Field Guide (2009:27 GeoCat#6890.1) and Australian Standard AS/NZS 5667.11:1998 Water Quality - Sampling - Part 11: Guidance on sampling of groundwaters; c) for subterranean aquatic fauna, the Guideline for the Environmental Assessment of Subterranean Aquatic Fauna (Queensland Herbarium, DSITI December 2015). E48 The construction, maintenance and decommissioning of groundwater monitoring bores must be undertaken in a manner that: a) prevents contaminants entering the groundwater; and b) ensures the integrity of the bores to obtain representative groundwater samples from the target aquifer; and c) maintains the hydrogeological environment within the aquifer. E49 A bore log# must be completed for each groundwater monitoring bore which includes: a) bore identification reference and geographic coordinate location; and b) specific construction information including but not limited to depth of bore, depth and length of casing, depth and length of screening and bore sealing details; and c) standing groundwater level and water quality characteristics including physical characteristics and results of laboratory analysis for the possible trigger characteristics; and d) lithological data, stratigraphic interpretation by an appropriately qualified person to identify important features associated with groundwater monitoring; and e) target hydrogeological formation of the bore. #Note: No bore log records available prior to 1 January 2000 for MB02 andTD4/DS. E50 The environmental authority holder must install, operate and maintain seepage management systems to prevent seepage from all site infrastructure moving beyond the operational bores specified in Table E6 - Groundwater monitoring locations and frequency.

    Groundwater, Biodiversity, Monitoring and reporting
  27. Page 27

    Permit OFFICIAL Environmental Authority EPML00770913 Table E6 - Groundwater monitoring locations and frequency (`Table E6') Location GroundwaterMonitoring QualityFrequency Monitoring Point[1] (GDA94 - Aquifer Standing Zone 56) Water Level Latitude Longitude RL (m) [2] Screened interval RL (m) [2] Surface RL (m)[2] Compliance bores Tailings Storage Facility 1 (TSF1) KMB3 225658 7200274 Camboon Volcanics 310 7.5-10.5 KMB5A 325.3 30.9- 225977 7199892 Camboon Volcanics 325.5 36.0 352.5 12.8- KMB5B 225981 7199891 Camboon Volcanics 292.4 18.8 36.3- KMB7 226476 7200319 Camboon Volcanics 350.8 41.3 358.80 KMB12 225363 7200277 Camboon Volcanics 318.9 24-30.5 TD4/DS 226295 Tailings Dam 4 (TD4) 21.5- 7202014 Camboon Volcanics 29.87 24-30 TD4/DS2 226367 7201916 Camboon Volcanics 15.5- TD4/OC 225873 7202066 Blue Basalt 24.5 26.5- TD4/US2A 226908 7201999 Camboon Volcanics 389.2 32.5 & Quarterly 68.5- Monthly TD4/US3A 227078 7202054 Camboon Volcanics 372.2 74.5 GW4B 51-63 227435 Tailings Dam 1 and 2 (TD1/TD2) 347.87 TD1/DSA 227488 7199565 Camboon Volcanics 343.90 27-30 KMB8 7199466 Camboon Volcanics 363.2 20.8- 29.8 CEX/DS 227037 7199626 Camboon Volcanics 16.1- KMB9 19.1 KMB9B Waste Rock Dumps and Open Cut Pits 15-18, TSF2AS 225951 7201384 Camboon Volcanics 320.10 27-30 TSF2AN 355.76 52.4- 228361 7201588 Camboon Volcanics 355.8 64.4 228362 7201588 Camboon Volcanics/ 9-15 Colluvium 13.5- Tailings Storage Facility 2 (TSF2) 19.5 19.8- 223134 7202218 Barfield Formation 235.59 25.8 223089 7202366 Barfield Formation 234.38

    Groundwater, Regulated structures, Waste, Monitoring and reporting
  28. Page 28

    Permit OFFICIAL Environmental Authority EPML00770913 Operational Bores3 Tailings Storage Facility 1 (TSF1) KMB1 225013 7200058 Camboon Volcanics 285.66 23-29 KMB6A 318.5 26.4- 226104 7200382 Camboon Volcanics 32.4 KMB6B 318.6 4.7-9.7 KMB10 226108 7200384 Camboon Volcanics 320.5 5-20 Quarterly KMB11 225930 7200416 Camboon Volcanics 328.6 6-12 Monthly MB065 226218 7200577 Camboon Volcanics 314.86 19-25 MB08 226033 7200340 Camboon Volcanics 328.37 18-24 226044 7199887 Camboon Volcanics 12-18 & MB10 Camboon Volcanics 300.57 24-30 225547 7200313 9.22 - MB2 226262 Tailings Dam 4 (TD4) 335.5 17.84 7202116 Camboon Volcanics 5-6 TD4/US2B 226908 7202002 Colluvium 389.3 5-6 372.2 TD4/US3B 227080 7202055 Colluvium 3.6-6.0 354.40 TD1/DSB 227228 Tailings Dam 1 and 2 (TD1/TD2) 12-18 Observation Bores4 7199458 Camboon Volcanics 258 358.55 17-23 KMB2 223924 7200595 Barfield Formation/ 348.76 9.74- RB01 227239 7202652 Camboon Volcanics 348.76 15.74 RB02 225977 7202915 353.90 7.5-10.5 Colluvium 370.70 15-21 397.02 28-34 Camboon Volcanics 296.80 25-31 357.58 8-11 RB03 222823 7203261 Barfield Formation 8-17 Quarterly RB05 226024 7203185 Camboon Volcanics 18.2- Monthly RB06 226264 7203900 Camboon Volcanics 21.2 2.5-3.5 TD4/DS2B 226495 7202403 Siltstone 3-5 MB11 225462 7200521 Camboon Volcanics TD3 226464 7200518 Tailings TD3B 226463 7200606 Tailings 358.13 TSF2-BS 223134 7202218 Alluvium 235.59 TSF2-BN 223089 7202366 Alluvium 234.38 1 Monitoring point depicted in Schedule J - Figure 4. 2 RL must be measured at the top of the bore casing to the nearest 5cm. 3 Groundwater quality when measured in operational bores must comply with condition E45. 4 Observation bores are for interpretation purposes only. 5 Condition E39 does not apply to MB06.

    Groundwater, Regulated structures, Waste, Monitoring and reporting
  29. Page 29

    Permit OFFICIAL Environmental Authority EPML00770913 Table E7 - Groundwater contaminant trigger values and limits (`Table E7') Quality Characteristic Bores Limit A Limit B pH All bores 6 - 8.5 1900 Electrical Conductivity (-s/cm) KMB7, CEX/DS 1700 KMB8, GW4B, TD4/OC, 4200 4400 TD4/US2A, TD4/US3A KMB12, KMB3 5500 6000 KMB5A, KMB5B, 9200 10000 TD4/DS, TD4/DS2 TD1/DSA 4540 4560 Sulfate (mg/L) CEX/DS, TD4/US3A 84 86 KMB7 302 311 KMB8, TD4/DS2, 765 1150 GW4B, TD4/OC TD4/DS, TD1/DSA, 1430 1720 TD4/US2A KMB12, KMB5A, KMB3 2600 2880 KMB5B 3600 3840 Fluoride (mg/L) TD4/OC - 2.5 TD4/US2A - 3.1 All bores - 2 Ammonia (mg/L) All bores - 0.9 Cyanide Free (mg/L) All bores - 0.007 Cyanide Total (mg/L) All bores - 0.08 Aluminium (mg/L) Dissolved All bores - 0.055 Arsenic (mg/L) Dissolved All bores - 0.013 TD4/DS21 N/A1 N/A1 Cadmium (mg/L) Dissolved All bores 0.0002 0.0003 Chromium (mg/L) Dissolved All bores 0.001 0.005 Cobalt (mg/L) Dissolved GW4B, KMB5B, 0.0334 0.054 KMB12, KMB3, TD4/US2A, TD1/DSA All other bores 0.009 0.0122 Copper (mg/L) Dissolved All bores 0.005 0.0073 Iron (mg/L) Dissolved All bores 0.3 0.4952 KMB91 N/A1 N/A1 CEX/DS1 N/A1 N/A1 Lead (mg/L) Dissolved All bores - 0.0034 Manganese (mg/L) Dissolved All bores - 1.9 KMB91 N/A1 N/A1 CEX/DS1 N/A1 N/A1 Mercury (mg/L) Dissolved TD1/DSA 0.0043 0.0049 All other bores N/A 0.0006 Molybdenum (mg/L) Dissolved All bores - 0.034 Nickel (mg/L) Dissolved KMB5A 0.011 0.03 All other bores 0.018 Selenium (mg/L) Dissolved All bores - 0.01 Silver (mg/L) Dissolved All bores - 0.001 Vanadium (mg/L) Dissolved All bores - 0.01 Zinc (mg/L) Dissolved All bores - 0.151 Total Hardness All bores Major ions All bores For interpretation purposes Total Dissolved Solids (mg/L) All bores 1 Condition E45 applies for the nominated bore and quality characteristic. 2 Zone 21 of the Lower Dawson Groundwaters (DEHP 2011) - Deep 80th percentile

    Groundwater
  30. Page 30

    Permit OFFICIAL Environmental Authority EPML00770913 E51 The Seepage Management Systems required by condition E50 must, at a minimum: a) include effective control measures to minimise seepage from all site infrastructure; and b) include effective control measures to capture and pump-back seepage sufficient to prevent migration into surface waters; and c) include effective control measures to ensure seepage does not report to groundwater in the receiving environment; and d) include effective control measures to ensure compliance with condition E45; and e) include adequate detection measures to analyse and confirm the effectiveness of all control measures required by this condition E52 The environmental authority holder must implement and maintain a Seepage Management Plan developed and documented by an appropriately qualified person(s). The SMP must, at a minimum: a) describe the Seepage Management Systems required by condition E50; and b) include adequate control measures to ensure groundwater quality in compliance bores listed in Table E6- Groundwater monitoring locations and frequency comply with all limits specified in Table E7 - Groundwater quality limits; and c) include all measures necessary to ensure that the management intent for groundwater is achieved in accordance with condition E45; and d) include all measures necessary to ensure compliance with condition E1 and E32; and e) include adequate measures to intercept seepage sufficient to prevent migration beyond the operational as specified in Table E6 - Groundwater monitoring locations and frequency; and f) include adequate measures and review processes to determine if any additional control measures e.g. interception bores or interception trenches are required; and g) include an action plan to implement and/or install any additional control measures that are required; and h) include a map or figure that depicts the location and type of seepage control measures installed; and i) be reviewed annually for the effectiveness of the components and include details of improvements undertaken in the previous year; and j) record the volumes of seepage collected and/or handled as part of the seepage management system. k) address any comments made by the administering authority E53 The Seepage Management Plan must be made available to the administering authority annually from 30 January 2022. TSF2 Groundwater E54 If groundwater standing water level (relative level) in groundwater monitoring bores TSF2AN and TSF2AS is less than the trigger threshold of 5 meters, when monitored in accordance with Table E6 - Groundwater monitoring locations and frequency (as measured in accordance with Table E6 - Groundwater monitoring locations and frequency note 2), the environmental authority holder must: a) Within ten business days of exceedance, review and implement actions identified in the: (i) Groundwater Management Program as required by condition E34; and (ii) Seepage Management Plan as required by condition E52; and b) Document the review. E55 By 30 June 2027, the environmental authority holder must develop and implement a groundwater monitoring network that is representative of the TSF2 site groundwater flow conditions including additional fit for purpose groundwater monitoring bores to inform the groundwater assessment report required by condition E56. E56 By 30 June 2028, an appropriately qualified person must prepare a TSF2 groundwater assessment report that includes but is not limited to the following: a) A review of all relevant groundwater data; and b) A hydrogeological conceptualisation and assessment of the adequacy of the groundwater monitoring network in accordance with the Australian groundwater modelling guidelines (Barnett et al., 2012); and c) Consideration of the requirements of the groundwater management program required by condition E34; and

    Groundwater, Surface water, Monitoring and reporting
  31. Page 31

    Permit OFFICIAL Environmental Authority EPML00770913 d) Recommendations for changes to the groundwater management program and seepage management plan as required by condition E34 and E53; and e) Recommendation for whether a numerical groundwater model is required. E57 The environmental authority holder must provide a copy of the groundwater assessment report required under condition E56 to the administering authority within 90 days of its completion. END OF CONDITIONS FOR SCHEDULE E

    Groundwater, Monitoring and reporting
  32. Page 32

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule F - Biodiversity Biodiversity offsets F1 Significant residual impacts to prescribed environmental matters, are not authorised under this environmental authority or the Environmental Offsets Act 2014. F2 Records demonstrating that each impact to a prescribed environmental matter did not, or is not likely to, result in a significant residual impact to that matter must be: a) completed by an appropriately qualified person; and b) kept for the life of the environmental authority. END OF CONDITIONS FOR SCHEDULE F

    Biodiversity, Monitoring and reporting
  33. Page 33

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule G - Land and Rehabilitation G1 The environmental authority holder must rehabilitate all land disturbed by the mining activities in a manner that ensures rehabilitated areas achieve the following rehabilitation objectives: a) Safe for humans and wildlife; b) Non-polluting; c) Stable; d) Able to sustain an agreed post-mining land-use; e) Revegetated with species endemic to the area with no declared pest species; and f) Compliant with all conditions of this environmental authority. G2 A Final Land Use Rehabilitation Plan (`FLURP') that describes how the rehabilitation objectives in condition G1 will be achieved must be developed, documented and implemented for all stages of the mining activity by 30 June 2017. The FLURP must at minimum include: a) Schematic representation of the proposed final land form inclusive of site drainage features; b) Details of proposed slope design and erosion and sediment controls; c) Proposed cover designs for encapsulation of waste material, including performance criteria; d) Proposed re-vegetation methods inclusive of plant species selection, propagation methods and establishment of suitable plant growth medium (i.e. top soil); e) Materials balance for all rehabilitation requirements including available top soil and material suitable for encapsulating waste in accordance with the proposed encapsulation methodology; f) Geotechnical, geochemical and hydrological studies necessary to demonstrate likely success of proposed rehabilitation methodology to achieve the required rehabilitation outcomes; g) An investigation of proposed residual voids including potential for generation/mobilisation of contaminants, potential pathways for release of contaminants to waters (including groundwater) and a long-term void water balance model; and h) A rehabilitation monitoring program sufficient to identify if required rehabilitation outcomes have been achieved. G3 Rehabilitation in accordance with condition G2 must commence progressively in accordance with the plan of operations. G4 Residual voids must not cause any serious or material environmental harm, other than the environmental harm constituted by the existence of the residual void itself, subject to any other condition within this environmental authority. G5 All explosives, flammable or corrosive substances, hazardous chemicals, toxic substances, gases and dangerous goods must be stored and handled in accordance with: a) The current Australian Standard where applicable; or b) Where no relevant Australian Standard exists, store such materials within an on-site containment system sufficient to prevent release to the receiving environment. G6 Minimise the potential for contamination of land by hazardous contaminants. G7 The environmental authority holder may conduct one (1) heap leach trial comprising of 2000 tonnes of ore with dimensions 20m x 20m x 4m high on the surface of TD2 within a three (3) month period. The holder of the environmental authority must design and operate the heap leach process within a bunded area with a capacity to contain the maximum volume of solution used in the leaching process in addition to rainfall runoff for a 1:100 ARI, 72 hour duration. G8 The legacy disturbance identified in Table G1- Legacy Disturbance must be managed in accordance with the conditions of this environmental authority.

    Rehabilitation, Groundwater, Waste, Land and soil, Biodiversity, Monitoring and reporting
  34. Page 34

    Permit OFFICIAL Environmental Authority EPML00770913 Table G1 - Legacy disturbance Mining Lease Mine Feature Name/ Location Maximum Disturbance (MGA 94, Zone 56)1 Area (Hectares) Description <1.0 maximum disturbance (at ML3221 TD1/TD2 227,333E; 7,200,141N various locations) ML8009 8.1 Easement disturbance 227189E; 7200274N 0.1 TD3 unnamed tributary 225771E; 7200338N 1.79 ML3229 Roses Pride 224,274E; 7,202,856N 1.2 ML80089 Klondyke 225,235E; 7,200,546N 1.3 (clay borrow pits) 225,133E; 7,200,293N 0.85 (Klondyke) Notes: 1: The location coordinates represent the approximate centroid of each respective polygon shown in Schedule J - Figure 6. G9 The disturbance areas identified in Table G2 - Legacy Disturbance areas not authorised to be disturbed are not the responsibility of the environmental authority holder and are not authorised to be disturbed by the environmental authority holder. Table G2 - Legacy disturbance areas not authorised to be disturbed Mining Mine Feature Name/ Description Location Maximum Disturbance Lease (MGA 94, Zone 56)1 Area (Hectares) ML3234 Historical tailings deposition 227,850E; 7,199,370N 14.8 ML3228 Historical diggings Various occurrences 40.02 ML3219 Historical diggings within the ML 18.62 ML3232 Historical diggings 28.92 ML3229 Roses Pride historical shaft and 224,370E; 7,202,840N 0.6 process plant ML3221 Historical process plant 227,257E; 7,200,263N 1.3 ML3221 UQ House 227,138E; 7,200,275N 0.6 (excludes easement) ML80089 Historical infrastructure 225,117E; 7,200,525N, 1.0 Notes: 1: The location coordinates represent the approximate centroid of each respective polygon shown in Schedule J - Figure 6. 2: The maximum disturbance area represents the whole polygon, within which only minor legacy disturbance exists. Disturbance areas have not been specifically identified within these polygons END OF CONDITIONS FOR SCHEDULE G

    Waste
  35. Page 35

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule H - Regulated Structures H1 The consequence category of any structure must be assessed by a suitably qualified and experienced person in accordance with the Manual for assessing consequence categories and hydraulic performance of structures a) Prior to the construction of the structure, if it is not an existing structure; or b) If it is an existing structure, by 20 December 2016; or c) Prior to any change in its purpose or the nature of its stored contents. H2 A consequence assessment report and certification must be prepared for each structure assessed and the report may include a consequence assessment for more than one structure. H3 Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for assessing consequence categories and hydraulic Design and construction of a regulated structure H4 All regulated structures constructed after 20 December 2016, must be designed by, and constructed under the supervision of, a suitably qualified and experienced person in accordance with the requirements of the H5 Construction of a regulated structure after 20 December 2016 is prohibited unless the environmental authority holder has submitted to the administering authority and 28 days have elapsed, the following: a) a consequence category assessment report, as required by condition H2, and b) the suitably qualified and experienced person certified design and design plan; and c) the associated suitably qualified and experienced person certified operating procedures. H6 Certification for regulated structures constructed after 20 December 2016, must be provided by the suitably qualified and experienced person who oversees the preparation of the design plan in the form set out in the must be recorded in the Regulated Structures register. H7 Regulated structures constructed after 20 December 2016, must: a) be designed and constructed in accordance with and conform to the requirements of the Manual for b) be designed and constructed with due consideration given to ensuring that the design integrity would not be compromised on account of: i) floodwaters from entering the regulated structure from any watercourse or drainage line; and ii) wall failure due to erosion by floodwaters arising from any watercourse or drainage line H8 Certification by the suitably qualified and experienced person who supervises the construction of regulated structures after 20 December 2016, must be submitted to the administering authority within 90 days of the completion of construction of the regulated structure, and state that: a) the 'as constructed' drawings and specifications meet the original intent of the design plan for that regulated structure; b) construction of the regulated structure is in accordance with the design plan. Operation of a regulated structure H9 Operation of a regulated structure must not commence unless the environmental authority holder has submitted to the administering authority: a) One paper copy and one electronic copy of the design plan and certification of the `design plan' in accordance with condition H6, and b) A set of `as constructed' drawings and specifications, and

    Surface water, Regulated structures, Land and soil, Monitoring and reporting
  36. Page 36

    Permit OFFICIAL Environmental Authority EPML00770913 c) Certification of those `as constructed drawings and specifications' in accordance with condition H8, and d) Where the regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the design storage allowance (DSA) volume across the system, a copy of the certified system design plan; e) A statement that confirms: i. The requirements of this authority relating to the construction of the regulated structure have been met; ii. The details required under this authority, have been entered into a Register of Regulated Structures; and iii. There is a current operational plan for the regulated structures. H10 For existing structures that are regulated structures: a) where the existing structure that is a regulated structure is managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, the environmental authority holder must submit to the administering authority within three (3) months of the commencement of this condition a copy of the certified system design plan including that structure; and b) There must be a current operational plan for the existing structures. H11 Each regulated structure must be maintained and operated, for the duration of its operational life until decommissioned and rehabilitated, in a manner that is consistent with the current operational plan and, if applicable, the current design plan and associated certified `as constructed' drawings. Mandatory reporting level H12 Other than for regulated Structures that have been certified as low consequence category for `failure to contain - overtopping' and with the exception of the Golden Plateau Pit, the Mandatory Reporting Level (the MRL) specified in Table H1 must be marked on a regulated structure in such a way that during routine inspections of that structure, it is clearly observable. H13 Other than for regulated Structures that have been certified as low consequence category for `failure to contain - overtopping', the environmental authority holder must, as soon as practical and within forty-eight (48) hours of becoming aware, notify the administering authority when the level of the contents of a regulated structure reaches the MRL. H14 Other than for regulated Structures that have been certified as low consequence category for `failure to contain - overtopping', the environmental authority holder must, immediately on becoming aware that the MRL has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated structure. H15 Other than for regulated Structures that have been certified as low consequence category for `failure to contain - overtopping', the environmental authority holder must record any changes to the MRL in Table H1 and in the Register of Regulated Structures. Design storage allowance H16 The environmental authority holder must assess the performance of each regulated structure or linked containment system over the preceding November to May period based on actual observations of the available storage in each regulated structure or linked containment system taken prior to 1 July of each year. H17 By 1 November of each year, storage capacity must be available in each regulated structure (or network of linked containment systems with a shared DSA volume), to meet the Design Storage Allowance (DSA) volume for the structure (or network of linked containment systems), as specified in Table H1. H18 The environmental authority holder must, as soon as possible and within forty-eight (48) hours of becoming aware that the regulated structure (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, notify the administering authority.

    Rehabilitation, Regulated structures, Monitoring and reporting
  37. Page 37

    Permit OFFICIAL Environmental Authority EPML00770913 H19 The environmental authority holder must, immediately on becoming aware that a regulated structure (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated structure or linked containment systems. Annual inspection report H20 Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person. H21 At each annual inspection, the condition and adequacy of all components of the regulated structure must be assessed and a suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and include recommended actions, if applicable, to ensure the integrity of the regulated structure. H22 The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for assessing consequence categories and hydraulic performance of H23 The environmental authority holder must within 20 business days of receipt of the annual inspection report, provide to the administering authority: a) The recommendations section of the annual inspection report; and b) If applicable, any details of any actions being taken in response to those recommendations. Transfer arrangements H24 The environmental authority holder must provide a copy of any reports, documentation and certifications prepared under this authority, including but not limited to any Register of Regulated Structures, consequence assessment, design plan and other supporting documentation, to a new holder on transfer of this authority. Decommissioning and rehabilitation H25 Regulated structures and structures must not be abandoned but must be decommissioned and rehabilitated to achieve compliance with conditions G1 and G2 of this environmental authority. Hydraulic performance of regulated structures H26 Each regulated structure authorised by this environmental authority as specified in Schedule A - Table A1 Authorised Disturbance, must meet the hydraulic performance criteria listed in Table H1 for that structure. H27 The water level must be measured and recorded electronically at Bore NS8, in order to enable monitoring of the Mandatory Reporting Level in the Golden Plateau Pit.

    Rehabilitation, Groundwater, Regulated structures, Monitoring and reporting
  38. Page 38

    Permit OFFICIAL Environmental Authority EPML00770913 Table H1 - Hydraulic performance criteria (`Table H1') Design Storage Mandatory Allowance (DSA) Name of Consequence Spillway Capacity Reporting Level Purpose Regulated Category of Structure (MRL) structure Design mAHD Design ML Design mAHD Criteria Criteria Criteria TSF1 356.65 151 356.1 (stage 5) TSF2 1:1000 251.8 1:100 299 1 in 250.7 Tailings (Stage 3A) AEP 253.2 100AEP 252.0 deposition High AEP 4 72hr TSF2 duration Tailings (Stage 3B) month 321 deposition TSF2 (Stage 4) 256.2 318 255.1 Water TSF2 storage (Stage 5) 258.7 316 257.5 Water 60.81 storage TD4 High 1:1000 394 1:100 1 in 100 393.1 Water (Stage 6) AEP AEP 4 AEP storage month as 72hr at 1 Nov duration each year Golden Significant 1:100 365 1:20 AEP 305.4 1:10 341.9 Plateau AEP 4-month AEP 359.7 Pit 72hr 339.1 duration Central Significant 1:100 361.17 1:20 AEP 40 1:10 Extended AEP 4-month AEP Pit 72hr duration Golden Significant 1:100 341.33 1:20 AEP 97.7 1:10 Mile Pit AEP 4-month AEP 72 hr duration 1. Calculated using the method of operational simulation. H28 The hydraulic performance criteria specified in Table H1 are the minimum mandatory performance requirements; regulated structures must be managed in a manner that ensures compliance with all conditions of this environmental authority. END OF CONDITIONS FOR SCHEDULE H

    Regulated structures, Waste, Monitoring and reporting
  39. Page 39

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule I - Definitions Definitions Key terms and/or phrases used in this document are defined in this section and bolded throughout this document. Applicants should note that where a term is not defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies must be used. If a word remains undefined it has its ordinary meaning. Word / Phrase Definition Acid drainage Means any contaminated discharge emanating from a mining activity Acid and metalliferous drainage formed through a series of chemical and/or biological reactions. Refer to Acid and metalliferous drainage. Annual inspection report Means any contaminated discharge emanating from a mining activity formed through a series of chemical and/or biological reactions. The term acid and metalliferous drainage is used to describe any drainage type and includes: - Acid drainage - Neutral and metalliferous drainage - Saline drainage Means an assessment prepared by a suitably qualified and experienced person containing details of the assessment against the most recent consequence assessment report and design plan (or system design plan): a) Against recommendations contained in previous annual inspections reports; b) Against recognised dam safety deficiency indicators; c) For changes in circumstances potentially leading to a change in consequence category; d) For conformance with the conditions of this environmental authority; e) For conformance with the `as constructed' drawings; f) For the adequacy of the available storage in each regulated dam, based on an actual observation or observations taken after 31 May each year but prior to 1 November of that year, of accumulated sediment, state of the containment barrier and the level of liquids in the dam (or network of linked containment systems); For evidence of conformance with the current operational plan. Annual exceedance probability or The probability that at least one event in excess of a particular AEP magnitude will occur in any given year. Appropriately qualified person Means a person who has professional qualifications, training, skills or experience relevant to the nominated subject matter and can give authoritative assessment, advice and analysis on performance relative to the subject matter using the relevant protocols, standards, methods or literature. Assessed or assessment By a suitably qualified and experienced person in relation to a consequence assessment of a dam, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an independent audit of the assessment: (a) exactly what has been assessed and the precise nature of that

    Regulated structures, Land and soil, Monitoring and reporting
  40. Page 40

    Permit OFFICIAL Environmental Authority EPML00770913 Word / Phrase Definition Benign waste rock determination; Certification (b) the relevant legislative, regulatory and technical criteria on which Certifying, certify or certified the assessment has been based; (c) the relevant data and facts on which the assessment has been Commercial place based, the source of that material, and the efforts made to obtain all Construction or constructed relevant data and facts; and (d) the reasoning on which the assessment has been based using the relevant data and facts, and the relevant criteria. Is waste rock that has been shown through appropriate and relevant geochemistry testing, to not produce acid and metalliferous drainage. Means assessment and approval must be undertaken by a suitably qualified and experienced person in relation to any assessment or documentation required by this Manual, including design plans, `as constructed' drawings and specifications, construction, operation or an annual report regarding regulated structures, undertaken in accordance with the Board of Professional Engineers of Queensland Policy Certification by RPEQs (ID: 1.4 (2A)). By an appropriately qualified and experienced person in relation to a design plan or an annual report regarding dams/structures, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an independent audit at any time: a) exactly what is being certified and the precise nature of that certification b) the relevant legislative, regulatory and technical criteria on which the certification has been based c) the relevant data and facts on which the certification has been based, the source of that material, and the efforts made to obtain all relevant data and facts d) the reasoning on which the certification has been based using the relevant data and facts, and the relevant criteria. Means a workplace used as an office or for business or commercial purposes, which is not part of the mining activity and does not include employees' accommodation or public roads. In relation to a regulated structure includes building a new regulated structure and lifting or otherwise modifying an existing regulated structure, but does not include investigations and testing necessary for the purpose of preparing a design plan. Consequence In relation to a structure as defined, means the potential for Consequence category environmental harm resulting from the collapse or failure of the structure to perform its primary purpose of containing, diverting or controlling flowable substances. Means a category, either low, significant or high, into which a dam is assessed as a result of the application of tables and other criteria in

    Regulated structures, Waste, Monitoring and reporting
  41. Page 41

    Permit OFFICIAL Environmental Authority EPML00770913 Word / Phrase Definition Dam the Manual for assessing consequence categories and hydraulic Dam crest volume Means a land-based structure or a void that contains, diverts or Design plan controls flowable substances, and includes any substances that are Design storage allowance or DSA thereby contained, diverted or controlled by that land-based structure or void and associated works. Effluent Associated works means: Emergency action plan a) Operations of any kind and all things constructed, erected or Existing structure installed for that dam; and Flowable substance Geochemical characterisation b) Any land used for those operations. Groundwater dependent Means the volume of material (liquids and/or solids) that could be ecosystem within the walls of a dam at any time when the upper level of that Hydraulic performance material is at the crest level of that dam. That is, the instantaneous maximum volume within the walls, without regard to flows entering or leaving (for example, via spillway). Is a document setting out how all identified consequence scenarios are addressed in the planned design and operation of a regulated structure. Means an available volume, estimated in accordance with the Manual for assessing consequence categories and hydraulic administering authority, must be provided in a dam as at 1 November each year in order to prevent a discharge from that dam to an annual exceedance probability (AEP) specified in that Manual. Means treated waste water discharged from sewage treatment plants. Means documentation forming part of the operational plan held by the holder or a nominated responsible officer, that identifies emergency conditions that sets out procedures and actions that will be followed and taken by the dam owner and operating personnel in the event of an emergency. The actions are to minimise the risk and consequences of failure and ensure timely warning to downstream communities and the implementation of protection measures. The plan must require dam owners to annually update contact. Means a structure that was in existence prior to the adoption of this schedule of conditions under the environmental authority. Means matter or a mixture of materials which can flow under any conditions potentially affecting that substance. Constituents of a flowable substance can include water, other liquids fluids or solids, or a mixture that includes water and any other liquids fluids or solids either in solution or suspension. Means establishing all elements present in the ore or waste material and the likelihood to produce acid and metalliferous drainage. Means ecosystems that require access to groundwater to meet all or some of their water requirements on a permanent or intermittent basis, so as to maintain their communities of plants and animals, ecosystem processes and ecosystem services. Means the capacity of a regulated dam to contain or safely pass flowable substances based on the design criteria specified for the

    Groundwater, Regulated structures, Waste
  42. Page 42

    Permit OFFICIAL Environmental Authority EPML00770913 Word / Phrase Definition relevant consequence category in the Manual for assessing consequence categories and hydraulic performance of structures LA 10, adj, 10 mins Means the A-weighted sound pressure level, (adjusted for tonal character and impulsiveness of the sound) exceeded for 10% of any 10-minute measurement period, using Fast response. LA 1, adj, 10 mins Means the A-weighted sound pressure level, (adjusted for tonal character and impulsiveness of the sound) exceeded for 1% of any 10-minute measurement period, using Fast response. LA, max adj, T Means the average maximum A-weighted sound pressure level, adjusted for noise character and measured over any 10-minute period, using Fast response. Land use Term to describe the selected post mining use of the land, which is planned to occur after the cessation of mining operations. Levee Means an embankment that only provides for the containment and diversion of stormwater or flood flows from a contributing catchment, or containment and diversion of flowable materials resulting from releases from other works, during the progress of those stormwater or flood flows or those releases; and does not store any significant volume of water or flowable substances at any other times. Mandatory reporting level or MRL Means a warning and reporting level determined in accordance with the criteria in the Manual for assessing consequence categories and the administering authority. Natural Flow Natural flow is defined as a flow event caused as a result of a local rainfall event, within a defined catchment area and measured within the same receiving waters. Neutral mine drainage Means any contaminated discharge emanating from a mining activity formed through a series of chemical and/or biological reactions. Non-acid forming, or non-acid Refer to Acid and metalliferous drainage. producing (NAP) Rock that when exposed to an oxidising environment will not Operational plan produce acid solutions. Compare with "ore or waste rock characterised as having acid forming potential. Includes: a) Normal operating procedures and rules (including clear documentation and definition of process inputs in the DSA allowance); b) Contingency and emergency action plans including operating procedures designed to avoid and/or minimise environmental impacts including threats to human life resulting from any overtopping or loss of structural integrity of the regulated structure. Ore or waste rock characterised as Means any rock with either a Net Acid Producing Potential of greater having acid forming potential than 5 kg of H2SO4/tonne or a Net Acid Generation oxidation pH of less than 4.5 (pH unit). Potentially acid forming (PAF) Means ore or waste rock characterised as having acid forming potential. Prescribed environmental matters Has the meaning in section 10 of the Environmental Offsets Act

    Surface water, Regulated structures, Noise and vibration, Waste, Biodiversity, Monitoring and reporting
  43. Page 43

    Permit OFFICIAL Environmental Authority EPML00770913 Word / Phrase Definition Receiving environment 2014, limited to the matters of state environmental significant listed in schedule 2 of the Environmental Offsets Regulation 2014. Receiving waters Register of Regulated Structures In relation to an activity that causes or may cause environmental harm, means the part of the environment to which the harm is, or may be, caused. The receiving environment includes (but is not limited to): a) a watercourse or surface waters b) groundwater Has the same meaning as receiving environment. Includes: a) Date of entry in the register; b) Name of the dam, its purpose and intended/actual contents; c) The consequence category of the dam as assessed using the Manual for assessing consequence categories and d) Dates, names, and reference for the design plan plus dates, names, and reference numbers of all document(s) lodged as part of a design plan for the dam; e) Name and qualifications of the suitably qualified and experienced person who certified the design plan and 'as constructed' drawings; f) For the regulated dam, other than in relation to any levees - i. The dimensions (metres) and surface area (hectares) of the dam measured at the footprint of the dam; ii. Coordinates (latitude and longitude in GDA94) within five metres at any point from the outside of the dam including its storage area iii. Dam crest volume (megalitres); iv. Spillway crest level (metres AHD). v. Maximum operating level (metres AHD); vi. Storage rating table of stored volume versus level (metres AHD); vii. Design storage allowance (megalitres) and associated level of the dam (metres AHD); viii. Mandatory reporting level (metres AHD); g) The design plan title and reference relevant to the dam; h) The date construction was certified as compliant with the design plan; i) The name and details of the suitably qualified and experienced person who certified that the constructed dam was compliant with the design plan; j) Details of the composition and construction of any liner; k) The system for the detection of any leakage through the floor and sides of the dam; l) Dates when the regulated dam underwent an annual inspection for structural and operational adequacy, and to ascertain the available storage volume for 1 November of any year;

    Groundwater, Surface water, Regulated structures, Biodiversity, Monitoring and reporting
  44. Page 44

    Permit OFFICIAL Environmental Authority EPML00770913 Word / Phrase Definition m) Dates when recommendations and actions arising from the annual inspection were provided to the administering authority; n) Dam water quality as obtained from any monitoring required under this environmental authority as at 1 November of each year. Regulated dam Means any dam in the significant or high consequence category as assessed using the Manual for assessing consequence categories by the administering authority. Rehabilitation Means the process of reshaping and revegetating land to restore it to a stable landform and in accordance with the acceptance criteria set out in this environmental authority and, where relevant, includes remediation of contaminated land. Residual void Means an open pit resulting from the removal of ore and/or waste Saline Drainage rock which will remain following the cessation of all mining activities Sensitive place and is not required to sustain a post mining land use. Means any contaminated discharge emanating from a mining activity Significant residual impact formed through a series of chemical and/or biological reactions. Refer to Acid and metalliferous drainage. Means: a) a dwelling, residential allotment, mobile home or caravan park, residential marina or other residential premises, or b) a motel, hotel or hostel, or c) an educational institution, or d) a medical centre or hospital, or e) a protected area under the Nature Conservation Act 1992, the Marine Parks Act 1992 or a World Heritage Area, or f) a public park or gardens. Has the meaning in section 8 of the Environmental Offsets Act 2014. Spillway Means a weir, channel, conduit, tunnel, gate or other structure designed to permit discharges form the dam, normally under flood conditions or in anticipation of flood conditions. Stable In relation to land, means landform dimensions are or will be stable within tolerable limits now and in the foreseeable future. Stability includes consideration of geotechnical stability, settlement and consolidation allowances, bearing capacity (trafficability), erosion resistance and geochemical stability with respect to seepage, leachate and related contaminant generation. Suitably qualified and experienced In relation to regulated structures means a person who is a person Registered Professional Engineer of Queensland (RPEQ) under the provisions of the Professional Engineers Act 2002, and has demonstrated competency and relevant experience: a) For regulated dams, an RPEQ who is a civil engineer with the required qualifications in dam safety and dam design. b) For regulated levees, an RPEQ who is a civil engineer with the required qualifications in the design of flood protection embankments.

    Rehabilitation, Regulated structures, Waste, Land and soil, Biodiversity, Monitoring and reporting
  45. Page 45

    Permit OFFICIAL Environmental Authority EPML00770913 Word / Phrase Definition System design plan Note: It is permissible that a suitably qualified and experienced person Void obtain subsidiary certification from an RPEQ who has demonstrated Waters competence and relevant experience in either geomechanics, hydraulic design or engineering hydrology. Wet season Means a plan that manages an integrated containment system that shares the required DSA and/or ESS volume across the integrated containment system. Means any constructed, open excavation in the ground. Includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined water in natural or artificial watercourses, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater or any part- thereof. Means the time of year, covering one or more months, when most of the average annual rainfall in a region occurs. For the purposes of DSA determination this time of year is deemed to extend from 1 November in one year to 31 May in the following year inclusive. END OF SCHEDULE I

    Groundwater, Surface water, Regulated structures, Subsidence
  46. Page 46

    Permit OFFICIAL Environmental Authority EPML00770913 Schedule J - Maps and Figures Figure 1 - Location of authorised disturbance.

  47. Page 47

    Permit OFFICIAL Environmental Authority EPML00770913 Figure 2 - Location of authorised disturbance including authorised footprint of TSF2 Stage 3B, 4 and 5.

  48. Page 48

    Permit OFFICIAL Environmental Authority EPML00770913 Figure 3 - Waste Disposal Trench ML80089

    Waste
  49. Page 49

    Permit OFFICIAL Environmental Authority EPML00770913 Figure 4 - Groundwater monitoring point locations

    Groundwater, Monitoring and reporting
  50. Page 50

    Permit OFFICIAL Environmental Authority EPML00770913 Figure 5 - Regulated Structures

    Regulated structures
  51. Page 51

    Permit OFFICIAL Environmental Authority EPML00770913 Figure 6 - Legacy Disturbance END OF PERMIT