Data as at 14 September 2026 · from the Queensland EP Act public register
Coal progressive rehabilitation and closure plan
PRCP-EPML00732813 · SUNGELA PTY LTD
PRC plan PRCP-EPML00732813-V4 for SUNGELA PTY LTD (EPML00732813), coal. Current schedule final milestone 2032-12-10; 16 rehabilitation and improvement areas.
- Environmental authority
- EPML00732813
- Holders
- SUNGELA PTY LTD; THUNGELA RESOURCES AUSTRALIA PTY LIMITED
- Tenures
- ML700061; ML70049; ML70326; ML70365; ML70366; ML70367; ML7459; ML7460
- Plan versions
- PRCP-EPML00732813-V1 (effective 2022-05-18), PRCP-EPML00732813-V2 (effective 2022-08-23), PRCP-EPML00732813-V3 (effective 2023-07-14), PRCP-EPML00732813-V4 (effective 2024-06-25)
- Current schedule final milestone
- 2032-12-10
- Areas in current schedule
- 16 · 7,814 ha
Schedule versions
| Version | Effective | Final milestone | Areas | Document |
|---|---|---|---|---|
| 1 (current) | 2022-05-18 | 2032-12-10 | 16 | Schedule PDF |
| 1 (current) | 2022-08-23 | 2032-12-10 | 16 | Schedule PDF |
| 1 (current) | 2023-07-14 | 2033-12-10 | 16 | Schedule PDF |
| 1 (current) | 2024-06-25 | 2028-12-10 | 16 | Schedule PDF |
Rehabilitation and improvement areas
From the current schedule's tables. Land use categories are keyword groupings; the schedule's wording is shown beneath.
| Area | Activities | Hectares | Post-mining land use | First milestone | Page |
|---|---|---|---|---|---|
| RA1rehabilitation | - | 662.8 | GrazingCattle grazing | Progressive rehabilitation certified in 2018 and 2021 | 8 |
| RA2rehabilitation | Mine domain 1 - Overburden / infrastructure areas, including overburden emplacement areas, low walls, mine infrastructure areas, and surface disturbance associated with underground mining (Figure 9-10 Rehabilitation Area 2 (RA 02)) | 861.7 | GrazingCattle grazing | 1/01/2022 | 9 |
| RA3rehabilitation | Mine domain 4 – cleared areas (Figure 9-11 Rehabilitation Area 3 (RA 03)) | 44.1 | Native ecosystemNative bushland corridor | 1/01/2022 | 11 |
| RA4rehabilitation | Mine domain 3 - Boggy creek diversion (Figure 9-12 Rehabilitation Area 4 (RA 04)) | 78.8 | Water, diversions and flood landformsBoggy Creek diversion | 1/01/2022 | 13 |
| RA5rehabilitation | Mine domain 1 – Overburden / infrastructure areas, including overburden emplacement areas, low walls, mine infrastructure areas, borrow pits, sewage ponds, roads and dams (Figure 9-13 Rehabilitation Area 5 (RA 05)) | 617.3 | GrazingCattle grazing | 1/01/2022 | 15 |
| RA6rehabilitation | Mine domain 3 – Overburden / mine disturbed areas including overburden emplacement areas, low walls, highwalls and cleared areas (Figure 9-14 Rehabilitation Area 6 (RA 06)) | 137.3 | Native ecosystemNative bushland corridor | 1/01/2022 | 17 |
| RA7rehabilitation | Mine domain 3 - Boggy creek diversion (adjoining areas) (Figure 9-15 Rehabilitation Area 7 (RA 07)) | 1137.2 | Water, diversions and flood landformsBoggy creek diversion | 1/01/2022 | 19 |
| RA9rehabilitation | Mine domain 3 – Overburden emplacement areas and highwalls (Figure 9-17 Rehabilitation Area 9 (RA9)) area size (ha) first milestone: RM3 | Native ecosystemNative bushland corridor | 23 | ||
| RA10rehabilitation | Mine domain 7 - Flood protection landform constructed over existing levee and overburden emplacement areas (Figure 9-18 Rehabilitation Area 10 (RA10)) | 35.7 | Water, diversions and flood landformsFlood protection landform | 1/01/2038 | 25 |
| RA11rehabilitation | Mine domain 1 – Overburden / infrastructure areas, including overburden emplacement areas, low walls, highwalls, mine infrastructure areas, stockpiles/laydowns, roads and dams (Figure 9-19 Rehabilitation Area 11 (RA11)) | 927.1 | GrazingCattle grazing | 1/01/2028 | 27 |
| RA12rehabilitation | Mine domain 3 – Overburden emplacement areas and highwalls (Figure 9-20 Rehabilitation Area 12 (RA12)) | 76.2 | Native ecosystemNative bushland corridor | 1/01/2034 | 29 |
| RA13rehabilitation | Mine domain 7 - Flood protection landform constructed over existing levee (Figure 9-21 Rehabilitation Area 13 (RA13)) | 29.6 | Water, diversions and flood landformsFlood protection landform | 1/01/2028 | 31 |
| RA14rehabilitation | Mine domain 2 – roads, bridge, powerlines, dams and associated water infrastructure (eg. pipelines) (Figure 9-22 Rehabilitation Area 14 (RA14)) | 38.5 | Infrastructure, industrial or residentialLandholder retained infrastructure | 1/01/2028 | 33 |
| RA15rehabilitation | Underground Mining (Figure – RA15) | 3,168 | NUMA or voidExisting surface use, or RA PMLU or IA NUMA where applicable | 1/1/2038 | 35 |
| IA1improvement | Mine domain 6 – A Central, A North, B, C, D & E Pit Highwalls (Figure 9-23 Improvement Area 1 (IA 01)) | NUMA or voidHighwalls | 1/01/2032 | 45 | |
| IA2improvement | Mine domain 5 - A Central, A North, B, C & D Pits Groundwater daylighting water areas (Figure 9 -24 Improvement Area 2 (IA 02)) | Water, diversions and flood landformsGroundwater daylighting water areas | 1/01/2036 | 47 |