PRCP-EPML00417213 · ABERDARE COLLIERIES PROPRIETARY LIMITED

PRC plan PRCP-EPML00417213-V1 for ABERDARE COLLIERIES PROPRIETARY LIMITED (EPML00417213), coal. Current schedule final milestone 2067-12-10; 8 rehabilitation and improvement areas.

Environmental authority
EPML00417213
Holders
ABERDARE COLLIERIES PROPRIETARY LIMITED
Tenures
ML50074
Plan versions
PRCP-EPML00417213-V1 (effective 2022-04-29)
Current schedule final milestone
2067-12-10
Areas in current schedule
8 · 776 ha

Schedule versions

VersionEffectiveFinal milestoneAreasDocument
1 (current)2022-04-292067-12-108Schedule PDF

Rehabilitation and improvement areas

From the current schedule's tables. Land use categories are keyword groupings; the schedule's wording is shown beneath.

AreaActivitiesHectaresPost-mining land useFirst milestonePage
RA1rehabilitationIn-pit and out-of-pit waste rock emplacements425.2GrazingLight grazing20229
RA2ArehabilitationRetained water management infrastructure (including Dam 8, Sediment dam 1 and 2, OPAC sediment dam and Eastern Creek Branch diversion)10.3Native ecosystemWater storage and fauna habitat204710
RA2BrehabilitationRehabilitated water management infrastructure (including North ROM pond, Dam 1, Dam 2, Test Pit, Dam 4, 5 and 6, IADA Lower Pond and all levee areas)43.4GrazingLight grazing202211
RA3rehabilitationMine infrastructure areas (including major haul roads)94.4GrazingLight grazing204712
RA4rehabilitationResidual void floor13Native ecosystemFauna habitat204313
RA5rehabilitationResidual void high wall / low wall63.1Native ecosystemFauna habitat204314
RA6rehabilitationIn-Pit Ash Cells and Out-Pit Ash Cell batters81.7GrazingLight grazing202215
RA7rehabilitationExploration tracks and drill pads45.3GrazingLight grazing202216