Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Minerals progressive rehabilitation and closure plan

P-PRCP-100882576 · Mine Feature Name

PRC plan P-PRCP-100882576 for Mine Feature Name (EPML00699113), minerals. Current schedule final milestone 2065-12-10; 18 rehabilitation and improvement areas. 1 applications, including information requests and replies.

Environmental authority
EPML00699113
Holders
AMCOL AUSTRALIA PTY. LTD.
Tenures
ML55007; ML55008; ML55017
Plan versions
P-PRCP-100882576 (effective 2026-02-10)
Current schedule final milestone
2065-12-10
Areas in current schedule
18 · 126 ha

Schedule versions

VersionEffectiveFinal milestoneAreasDocument
1 (current)2026-02-102065-12-1018Schedule PDF

Rehabilitation and improvement areas

From the current schedule's tables. Land use categories are keyword groupings; the schedule's wording is shown beneath.

AreaActivitiesHectaresPost-mining land useFirst milestonePage
RA1rehabilitationPits (Grazing)31.7GrazingMarginal Grazing10/12/202911
RA2rehabilitationPits (Hybrid Ecosystem)25.8Native ecosystemHybrid Ecosystem10/12/202512
RA3rehabilitationTopsoil Stockpiles (Grazing)4.1GrazingMarginal Grazing10/12/202513
RA4rehabilitationTopsoil Stockpiles (Hybrid Ecosystem)12.3Native ecosystemHybrid Ecosystem10/12/202514
RA5rehabilitationOverburden & Laydown Areas (Grazing)0.8GrazingMarginal Grazing10/12/203415
RA6rehabilitationOverburden & Laydown Areas (Hybrid Ecosystem)16.6Native ecosystemHybrid Ecosystem10/12/203916
RA7rehabilitationInfrastructure0.5Infrastructure, industrial or residentialRetained Infrastructure (Infrastructure)10/12/205217
RA8rehabilitationRoads & Tracks (Grazing)2.0GrazingMarginal Grazing10/12/202918
RA9rehabilitationRoads & Tracks (Hybrid Ecosystem)2.3Native ecosystemHybrid Ecosystem10/12/203919
RA10rehabilitationMain Road1.8Infrastructure, industrial or residentialRetained infrastructure (Roads)10/12/205220
RA11rehabilitationSediment Basins & Water Storages (Grazing)1.0GrazingMarginal Grazing10/12/202521
RA12rehabilitationSediment Basins & Water Storages (Hybrid Ecosystem)0.3Native ecosystemHybrid Ecosystem10/12/204822
RA13rehabilitationWater Storages (to remain)1.2Water, diversions and flood landformsRetained infrastructure (Water Storage)10/12/205223
RA14rehabilitationExisting Rehabilitation (Grazing Stage 1)6.9GrazingMarginal Grazing10/12/202524
RA15rehabilitationExisting Rehabilitation (Grazing Stage 2)9.9GrazingMarginal Grazing10/12/202525
RA16rehabilitationExisting Rehabilitation (Grazing Stage 3)1.5GrazingMarginal Grazing10/12/202526
RA17rehabilitationExisting Rehabilitation (Hybrid Ecosystem Stage 1)1.4Native ecosystemHybrid Ecosystem10/12/202527
RA18rehabilitationExisting Rehabilitation (Hybrid Ecosystem Stage 2)6.4Native ecosystemHybrid Ecosystem10/12/202528

Application A-PRCP-NEW-100882562

Plan effective
2026-02-10
Register
Application record