Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Minerals progressive rehabilitation and closure plan

P-PRCP-100759426 · VISY GLASS OPERATIONS (AUSTRALIA) PTY LTD

PRC plan P-PRCP-100759426 for VISY GLASS OPERATIONS (AUSTRALIA) PTY LTD (EPML00349813), minerals. Current schedule final milestone 2038-12-10; 5 rehabilitation and improvement areas. 1 applications, including information requests and replies.

Environmental authority
EPML00349813
Holders
VISY GLASS OPERATIONS (AUSTRALIA) PTY LTD
Tenures
ML1124; ML7064
Plan versions
P-PRCP-100759426 (effective 2026-05-08)
Current schedule final milestone
2038-12-10
Areas in current schedule
5 · 97 ha

Schedule versions

VersionEffectiveFinal milestoneAreasDocument
1 (current)2026-05-082038-12-105Schedule PDF

Rehabilitation and improvement areas

From the current schedule's tables. Land use categories are keyword groupings; the schedule's wording is shown beneath.

AreaActivitiesHectaresPost-mining land useFirst milestonePage
RA1rehabilitationMine disturbance (Existing rehabilitated areas)94.8haNative ecosystemNative Ecosystem10/12/202611
RA2ArehabilitationMine infrastructure (Removed infrastructure)0.1haNative ecosystemNative Ecosystem10/12/202612
RA2BrehabilitationMine infrastructure (Bore 2 & 40mm UPVC Piezo)0.0002haNative ecosystemNative Ecosystem10/12/202613
RA2CrehabilitationMine infrastructure (Maintenance workshop) size (ha)Native ecosystemNative Ecosystem10/12/202614
RA3rehabilitationRetained infrastructure (Sealed and unsealed gravel roads, Bore 1 & 3, Energex Supply)1.8haInfrastructure, industrial or residentialRetained Infrastructure10/12/202615

Application A-PRCP-NEW-100759407

Received
2024-10-31
First information request
2025-08-27
Response due
2026-03-03
Extensions
1 (to 2025-08-27)
Plan effective
2026-05-08
Days from receipt to plan effective
554
Register
Application record
22 documents on the register

Information request: 7 items

item 1 General

Department foundThe PRCP planning part document (and the proposed PRCP schedule) makes reference to sections which appear to be incorrect. For instance, the PRCP schedule states that “revegetation plan (Section 7.9.1 of the PRCP RPP”. The revegetation plan appears to be included in section 7.8.1 of the PRCP RPP.

Asked forPlease update the PRCP RPP to ensure references are correct.

Notice, page 3

item 2 General rehabilitation practices (proposed PRC plan and/or PRCP Guideline)

Department foundA final landform design The final landform design provided at section 7.6 of the PRC plan does not comply with the requirements of section 3.6.1 and 3.6.3 of the PRCP guideline, for example: • The information in Section 7.6 of the PRCP report is limited and does not incorporate local data for design. • The erosion estimates have not been sufficiently substantiated. • Section 7.6 (page 56) refers to Table 20, stating that 25-degree slopes have a Factor of Safety (FoS) of 1.34, without presenting local data or analysis on how structural stability was achieved. The expected FoS is 1.5.The Void Closure Plan report (2419A2) indicates the steepest slope as 18 degrees with an FoS of 2.0. Section 1.5.1 of the Void Closure Plan on Slope Stability relies on assumptions of soil data for stability without supporting data and analyses. Rehabilitation program Condition F2-1 of the EA requires that the EA holder “Maintain a rehabilitation program of disturbed areas (including landform design criteria) to meet the outcomes in (F2-1)”. The rehabilitation plan provided with the PRCP is dated November 2009.

Asked forProvide a final landform design that addresses the matter or adopt the proposed PRCP schedule conditions 16 and 17 and relevant milestone criteria. Propose reasonable timeframes for consideration.

Notice, page 3

item 3 Landholder agreement/s (proposed PRC plan and/or PRCP Guideline)

Department foundEvidence of agreement for any infrastructure that will have ownership transferred The Landholder agreement (dated 5 November 2019) has been included in Appendix L of the PRC plan. It is noted that the agreement relates to other areas of Minjerribah (Kounpee, Glass and Dunwich), two of which are not associated to this EA. The infrastructure listed to be retained in the landholder agreement is not consistent with the PRC plan listed infrastructure. For example: • Access tracks are proposed to be retained per the Landholder agreement provided. However, there is also a second agreement ‘Minjerribah TFMS’ which the retainment of specific tracks associated with the Minjerribah Township Fire Management Strategy. The map of the access tracks to be retained, shown in Figure 12 of the PRC plan is inconsistent with the Landholder agreement (Appendix L) and the spatial information provided. • Communications infrastructure has been mentioned in the Landholder agreement (Appendix L) but has not been addressed in the PRC plan. A description of infrastructure that will remain post rehabilitation and the identification of ongoing maintenance requirements The PRC plan indicates that the infrastructure to be retained (subject to a Landholder agreement) is the Maintenance workshop, Bore 1 and Bore 3 and all sealed and unsealed roads. It appears the Landholder agreement (Appendix L) is currently being negotiated and it is unclear if the Maintenance workshop Ongoing maintenance requirements for infrastructure to be retained have not been detailed.

Asked forEvidence of agreement Provide an updated Rehabilitation Planning Part that includes clear and contemporary information and a landholder agreement that is consistent with the PRCP schedule and PRC plan, and meets the requirements of section 3.6.5 of the PRCP guideline. The agreement should itemise the relevant infrastructure that will be retained by the landholder. The agreement should be easily interpreted and use agreed naming of infrastructure as identified in the EA and PRCP schedule. Maps may also assist in providing this level of clarity. If an updated landholder agreement cannot be provided then include appropriate rehabilitation milestones and criteria to return the land to a native ecosystem PMLU. Infrastructure that will remain post rehabilitation and ongoing maintenance requirements Provide details of rehabilitation and maintenance requirements for infrastructure to be retained. Update Table 26 of the PRC plan to remove the reference relating to the Landholder’s responsibility. Provide advice on the status of the testing that was proposed to be carried out to determine the extent of residual contamination.

Notice, page 4

item 4 Surface water and Groundwater (proposed PRC plan and/or PRCP Guideline)

Department foundThe PRCP schedule proposes rehabilitation outcome criteria for surface and groundwater limits as specified in Schedule C of the EA to demonstrate the achievement of post mining land use to a stable condition (native ecosystems). Limits included in the PRCP schedule must be fit for purpose (closure, not operation), site-specific and based on WQOs, guidelines and background data. As monitoring data has not been provided to support the proposed limits, water quality objectives (WQOs) have been included in the attached PRCP consultation schedule.

Asked forEither adopt the proposed WQOs in the attached PRCP consultation schedule, or propose appropriate site specific parameters and include supporting data in the format specified (attached). Limits proposed must be fit for purpose (closure, not operation), site-specific and based on WQOs, guidelines and background data. Background data can be used to determine site-specific limits as follows: (a) For surface water, the 80th percentile of data for upstream/reference sites should be used for phys-chem indicators and the 95th percentile for toxicants. For groundwater, the 95th percentile of baseline (ideally pre mining) data can be used to determine site-specific limits for all indicators. See DES 2021 Groundwater Guideline https://www.publications.qld.gov.au/dataset/groundwater- quality-assessment-guideline/resource/472cc88a-000a- 4bb8-a60d-204cfe7e0238.

Notice, page 5

item 5 Erosion monitoring requirements (proposed PRC plan and/or PRCP Guideline)

Department foundSection 7.5.1.3 of the Rehabilitation Planning Part provides information regarding an erosion monitoring program that was carried out up until 2012. Conditions F2-1 and F2-2 of the EA require a rehabilitation outcome whereby areas are progressively rehabilitated to a native ecosystem with landforms that are stable, with erosion comparable to analogue sites. Section 5.1.2 of the Rehabilitation program provided as Appendix B to the Rehabilitation Planning Part indicated that soil erosion monitoring to quantify erosion rates, and be done every 12 months. Contemporary results of this monitoring program have not been provided, presumably the same monitoring program mentioned at section 7.5.1.3 of the Rehabilitation Planning Part.

Asked forEither adopt the proposed PRCP conditions 14 and 15 and relevant rehabilitation milestone criteria proposed in the schedule or, alternatively, provide data and interpretation of analogue and final landform erosion monitoring program with a view to proposing appropriate target erosion threshold for annual erosion rates based on that monitoring.

Notice, page 6

item 6 PRCP consultation schedule

Department foundThe department has attached an early draft of a proposed PRCP schedule for the purpose of consultation and to communicate how the information requested would be considered in further revision of a draft PRCP schedule. The PRCP assessment process is an iterative process whereby ongoing awareness of the site’s rehabilitation needs will lead to additions and variations to the draft schedule. Amendments proposed by the department in the provided draft are provided with a view to ongoing engagement towards the development of SMART criteria.

Asked forConsider the proposed amendments and where dates and or timeframes are not yet proposed, consider appropriate timeframes for further discussion. Consider the proposed amendments more broadly with a view to further engagement with the department.

Notice, page 7

item 7 Rehabilitation Planning Part

Department foundChanges to the RPP may be required.

Asked forProvide an updated Rehabilitation Planning Part as necessary to provide consistency.

Notice, page 7