P-EA-100300302 · VIKING HOARD PTY LTD
Minerals environmental authority P-EA-100300302 (VIKING HOARD PTY LTD), Granted. 19 conditions indexed. No PRC plan.
- Status
- Granted
- Holders
- VIKING HOARD PTY LTD
- Tenures
- ML100303
- PRC plan
- None
- How it was read
- Numbered conditions
- Register
- Register record · Instrument PDF
Conditions
19 numbered conditions read from the current instrument. Page numbers link into the register PDF.
- V1
With the exception of any variations, the conditions of approval for this environmental authority are the standard conditions contained within the document Eligibility criteria and standard conditions for mining
- V2
All reasonable steps must be taken to ensure the activity complies with the eligibility criteria and standard conditions.
- V3
Prior to carrying out mining activities in the category C environmentally sensitive area - Brooklyn Nature Refuge, the holder of the environmental authority must consult with the relevant administering authority. If it is determined that additional conditions are necessary to manage environmental impacts, the holder must apply to amend the environmental authority.
- V4
Any new road or track disturbance must be minimised to avoid impact of environmental values on ML100303.
- V5
The holder of this environmental authority must prevent the spread of weeds by ensuring all vehicles and machinery are cleaned prior to undertaking mining activities. The holder of the environmental authority must keep records of the cleaning history of vehicles, machinery and equipment and must be made available to the administering authority on request.
- V6
Within active mine areas, the holder of this environmental authority must: a) carry out erosion management in a timely manner; and b) maintain roads and tracks in good condition; and c) carry out a targeted weed control program.
- V7
The holder of this environmental authority must ensure an appropriately qualified person(s) undertakes a targeted survey prior to carrying out mining activities, to detect the presence, density, diversity or absence of: a) endangered or vulnerable plant species; and b) endangered or vulnerable wildlife species.
- V8
The targeted survey required by condition V7 must occur in accordance with the latest version of the Terrestrial Vertebrate Fauna Survey Guidelines for Queensland, Ecological Sciences, Queensland Herbarium and the Flora Survey Guidelines - Protected Plants. Wildlife and Threatened Species
- V9
Prior to undertaking any mining activities, the holder of this environmental authority must obtain an appropriately qualified person(s) to prepare a Management Plan for any threatened species identified during the survey required under V7, to mitigate or minimise potential impacts of mining activities. The holder of the environmental authority must: a) submit the Management Plan to the administering authority prior to undertaking any land disturbance; and b) have due regard for any comments received by the administering authority; and c) update the Management Plan accordingly and implement.
- V10
Vegetation clearing of trees identified in the survey required by condition V7 as actual or potential habitat or nesting trees must not occur. Permit Environmental authority P-EA-100300302
- V11
Vegetation clearing must be minimised to the greatest extent possible to maintain landscape connectivity.
- V12
Disturbance for creek access points must be minimised to the greatest extent possible to maintain connectivity of the riparian vegetation.
- V13
Rock armouring or appropriate stabilisation of the any creek access points must occur to prevent or minimise erosion of disturbed areas both during mining operations and after rehabilitation is completed.
- V14
The holder of this environmental authority must obtain an appropriately qualified person(s) to develop a Revegetation Plan. The holder of the environmental authority must: a) submit the Revegetation Plan to the administering authority prior to undertaking mining activities; and b) have due regard for any comments received by the administering authority; and c) update the Revegetation Plan accordingly and implement.
- V15
Land that has been disturbed by mining activities must be rehabilitated in a manner such that: a) all disturbed land is reprofiled to match, as near as possible, the surrounding undisturbed areas; and b) revegetate disturbed areas with a suitable mix of locally endemic plant species with consideration of the Revegetation Plan required under condition V14; and c) erosion is minimised and controlled; and d) the vegetation community is self-sustaining.
- V16
The holder of this environmental authority must obtain an appropriately qualified person(s) to verify rehabilitation meets condition V15 and provide with any application for surrender or progressive certification.
- V17
Rehabilitation of land disturbed for mining activities must take place progressively as works are staged and prior to new mining areas being commenced. Water
- V18
Mining activities within the beds and banks of creeks are not authorised to occur when there is any flowing water within the proposed area to be mined. Waste Management
- V19
Notwithstanding condition B6, general waste cannot be buried within 100 m of a watercourse. Permit Environmental authority P-EA-100300302 Definitions Key terms and/or phrases used in Part 1 of this document are defined in this section and the Eligibility criteria defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies must be used. If a word remains undefined it has its ordinary meaning. 'appropriately qualified person' means a person who has professional qualifications, training, skills or experience relevant to the nominated subject matter and can give authoritative assessment, advice and analysis on performance relating to the subject matter using the relevant protocols, standards, methods or literature. `connectivity' includes both structural connectivity (the physical arrangements of disturbance and/or patches) and functional connectivity (the movement of individuals across contours of disturbance and/or among patches). `disturbed' means land that has been impacted by mining activities and includes: a) compacting, removing, covering, exposing or stockpiling of earth b) removal or destruction of vegetation or topsoil or both to an extent where the land has been made susceptible to erosion c) carrying out mining within a watercourse, waterway, wetland or lake d) the submersion of areas by tailings or hazardous contaminant storage and dam/structure walls e) temporary infrastructure, including any infrastructure (roads, tracks, bridges, culverts, dam/structures, bores, buildings, fixed machinery, hardstand areas, airstrips, helipads etc) which is to be removed after the mining activity has ceased f) releasing of contaminants into the soil, or underlying geological strata. However, the following areas are not included when calculating areas of `disturbance': i. areas off lease (e.g. roads or tracks which provide access to the mining lease) ii. areas previously disturbed which have achieved the rehabilitation outcomes iii. by agreement with the administering authority, areas previously disturbed which have not achieved the rehabilitation objective(s) due to circumstances beyond the control of the mine operator (such as climatic conditions) and disturbance that pre-existed the grant of the tenure. iv. areas under permanent infrastructure. Permanent infrastructure includes any infrastructure (roads, tracks, bridges, culverts, dam/structures, bores, buildings, fixed machinery, hardstand areas, airstrips, helipads etc) which is to be left by agreement with the landowner v. disturbance that pre-existed the grant of the tenure. `land' means land excluding waters and the atmosphere, that is, the term has a different meaning from the term as defined in the Environmental Protection Act 1994. For the purposes of the Acts Interpretation Act 1954, it is expressly noted that the term `land' in this environmental authority relates to physical land and not to interests in land. `self-sustaining' means not requiring on-going intervention and maintenance to maintain functional riverine processes and characteristics. `threatened' as defined in the Nature Conservation Act 1992. END OF ENVIRONMENTAL AUTHORITY