Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Coal environmental authority

EPVX00551613 · BYERWEN COAL PTY LTD

Coal environmental authority EPVX00551613 (BYERWEN COAL PTY LTD), Granted. 35 conditions indexed. No PRC plan.

Status
Granted
Holders
BYERWEN COAL PTY LTD
PRC plan
None
How it was read
Numbered conditions (OCR)
Register
Register record · Instrument PDF

Conditions

35 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    Provide a financial assurance in the amount and form required by the administering authority prior to the commencement of activities proposed under this environmental authority.

    page 2OCR text
  2. A2

    The financial assurance is to remain in force until the administering authority is satisfied that no claim on the assurance is likely. Note: Where progressive rehabilitation is completed and acceptable to the administering authority, progressive reductions to the amount of financial assurance will be applicable where rehabilitation has been completed in accordance with the acceptance criteria defined within this environmental authority.

    page 2OCR textRehabilitation
  3. A3

    For exploration activities the environmental authority holder must comply with each of the Standard environmental conditions contained in the Code of Environmental Compliance for Exploration and Mineral Development Projects, with the exception of Condition 13, which is replaced by the conditions in this environmental authority.

    page 2OCR text
  4. A4

    If there is any inconsistency between a standard environmental condition and an additional condition in this environmental authority, the additional condition prevails to the extent of any inconsistency.

    page 2OCR text
  5. A5

    The conditions of this environmental authority are in force until a surrender or the authority is accepted pursuant to the Environmental Protection Act 1994. The conditions apply unless an amendment is approved pursuant to the Environmental Protection Act 1994.

    page 2OCR text
  6. A6

    Words and phrases used throughout this environmental authority are defined in the Definitions section of this authority. Where a definition for a term used in this environmental authority is sought and the term is not defined within this environmental authority, the definitions in the Code of Environmental Compliance for Exploration and Mineral Development Projects and the definitions in the Environmental Protection Act 1994, its regulations and policies must be used. www.derm.qid.gov.au ABN 46 640 294 485 ecoaccess * environmental licences and permits Environmental Authority (Exploration) Non Code Compliant Level 2 Mining Project Permit’ Number: MIN202616311 Byerwen Coal Department Interest — Land Drilling B1 In carrying out mining activities on EPC739 all reasonable and practicable measures must be taken to prevent or minimise the likelihood of environmental harm being caused to any Category B Environmentally Sensitive Area (ESA).

    page 2OCR text
  7. B2

    Mining activities undertaken must be consistent with Attachment 1 — Location of drill holes (EPC739) within Environmentally Sensitive Area Buffer zones, Map 1 and Attachment 2 — Location of drill holes (EPC739) within Environmentally Sensitive Area Buffer zones, Map 2.

    page 3OCR text
  8. B3

    Mining activities undertaken must be consistent with Application for Amendment to Environmental Authority for EPC739 — Supporting Information.

    page 3OCR text
  9. B4

    The environmental authority holder is not authorised to undertake any drilling activities in any Category B ESA. Drill Holes

    page 3OCR text
  10. B5

    The environmental authority holder is authorised to carry out drilling activities on EPC739, within 500m of any Category B ESA.

    page 3OCR text
  11. B6

    The environmental authority holder is authorised to undertake a maximum of 15 drill holes within the 500m buffer zone of any Category B ESA.

    page 3OCR text
  12. B7

    The environmental authority holder is not authorised to undertake any drilling activities within any Category B ESA.

    page 3OCR text
  13. B8

    The operational area in the drill site must not exceed 1000m?.

    page 3OCR text
  14. B9

    Drill holes within 500m of any Category B ESA are to be a maximum of 200mm diameter.

    page 3OCR text
  15. B10

    The construction sumps within 500m of any Category B ESA are must not exceed 10m’.

    page 3OCR text
  16. B11

    ~—- The environmental authority holder must minimise disturbance within 500m of any Category B ESA and avoid clearing mature trees when undertaking drilling activities.

    page 3OCR text
  17. B12

    No clearing disturbance for access to boreholes will take place within 500m of any Category B ESA. www.derm.qid.gov.au ABN 46 640 294 485 ecoaccess environmental licences and permits Environmental Authority (Exploration) Non Code Compliant Level 2 Mining Project Permit' Number: MIN202616311 Byerwen Coal

    page 3OCR text
  18. B13

    ~~ Rehabilitation of drill sites and sumps will be in accordance with the Code of Environmental Compliance for Exploration and Mineral Development Projects. Seismic surveys

    page 4OCR textRehabilitation
  19. B14

    ~The environmental authority holder is not authorised to undertake seismic surveying within 500m of any Category B ESA. Tracks

    page 4OCR text
  20. B15

    —_— Existing access and fence line tracks must be used. New tracks may only be constructed with approval from the administering authority.

    page 4OCR text
  21. B16

    Constructed tracks must be less than 3m in width.

    page 4OCR text
  22. B17

    ~— Authorised track construction involving blade clearing of established ground cover vegetation and/or clearing of mature trees is to be minimised.

    page 4OCR textBiodiversity
  23. B18

    _— All new tracks are to be recorded with GPS in GDA94 coordinate system and records kept of their location and made available to the administering authority on request.

    page 4OCR textMonitoring and reporting
  24. B19

    ~— All tracks, including watercourse crossings, must be commissioned and operated in accordance with the Code of Practice for Native Timber Forest Production on State Lands 2007.

    page 4OCR textSurface water
  25. B20

    ‘Tracks should not be used when soil is saturated and prone to displacement or erosion by vehicle movement. Other land disturbance

    page 4OCR textLand and soil
  26. B21

    Activities must not include costeaning or bulk sampling.

    page 4OCR text
  27. B22

    _ all equipment such as earthmoving and drilling equipment must be used in a manner which prevents the spread of weeds and minimises unnecessary disturbance of topsoil and ground cover vegetation.

    page 4OCR textLand and soil, Biodiversity
  28. B23

    _—~ Prior to entering any area which is within 500m of any Category B ESA all vehicles, machinery and equipment must be washed down and hold a current Weed Hygiene Declaration. Additional information: The EA holder is required to comply with all other legislative requirements with regards invasive species management, including the Land Protection (Pest and Stock Route Management) Act 2002 or Local Government Law. www.derm.qid.gov.au ABN 46 640 294 485 ecoaccess * environmental licences and permits Environmental Authority (Exploration) Non Code Compliant Level 2 Mining Project Permit' Number: MIN202616311 Byerwen Coal

    page 4OCR text
  29. B24

    Campsites must not be established within a Category B ESA or within 500m of any Category B ESA.

    page 5OCR text
  30. B25

    ~~ All waste must be removed and disposed of offsite.

    page 5OCR textWaste
  31. B26

    ~=Burning of vegetation is not permitted.

    page 5OCR textBiodiversity
  32. B27

    ~— Sediment control barriers installed on EPC739 should be made of non-organic material to prevent the spread of weeds. Rehabilitation and reporting

    page 5OCR textRehabilitation, Land and soil, Monitoring and reporting
  33. B28

    ~=Rehabilitation of areas disturbed within 500m of any Category B ESA must commence as soon as practicable to the extent that erosion impacts are minimised, and to be completed as soon as practicable but no longer than 3 months after completion of the disturbance activity.

    page 5OCR textRehabilitation, Land and soil
  34. B29

    ~—- Rehabilitation must be undertaken in accordance with requirements of the Code of Environmental Compliance for Exploration and Mineral Development Projects, and to the satisfaction of the administering authority.

    page 5OCR textRehabilitation
  35. B30

    An annual report must be prepared and submitted each year. The report must include a map showing the location of completed drill holes authorised by this environmental authority, as well as details of progressive rehabilitation works completed to demonstrate compliance with Conditions Bs8 and B29 of this environmental authority. Department Interest — Waste

    page 5OCR textRehabilitation, Waste, Monitoring and reporting