Coal environmental authority

EPVX00162513 · New Hope Exploration Pty Ltd

Coal environmental authority EPVX00162513 (New Hope Exploration Pty Ltd), Granted. 17 conditions indexed. No PRC plan.

Status
Granted
Holders
New Hope Exploration Pty Ltd
PRC plan
None
How it was read
Numbered conditions
Register
Register record · Instrument PDF

Conditions

17 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    The environmental authority does not take effect until the grant of the tenure to the environmental authority holder, or until each environmental authority holder has become a holder, under the Mineral Resources Act 1989, of each of the relevant mining tenements.

  2. A2

    The conditions of this environmental authority are in force until a surrender of the authority is accepted pursuant to the Environmental Protection Act 1994. The conditions apply unless an amendment is approved pursuant to the Environmental Protection Act 1994.

  3. A3

    The environmental authority holder is to give the administering authority a financial assurance in the amount and form and at a time required by the administering authority.

  4. A4

    The environmental authority holder must comply with each of the Standard Environmental Conditions contained in the Code of Environmental Compliance for Exploration and Mineral Development Projects dated January 2001. END OF CONDITIONS FOR SCHEDULE A Schedule B - Environmentally Sensitive Areas

  5. B1

    Condition B1 to Condition C3 are additional conditions under section 209 of the Environmental Protection Act 1994. If there is any inconsistency between a Standard Environmental Condition referred to in Condition A4 and an additional condition, then the additional condition prevails to the extent of any inconsistency.

  6. B2

    The holder of the environmental authority must consult with the Environmental Protection Agency to identify the specific values that must be preserved within the area identified as an Endangered Regional Ecosystem1.

  7. B3

    The holder of the environmental authority is authorised, subject to conditions B1 to C3 to carry out standard exploration activities on the relevant tenement in, or within 500m of areas mapped as Endangered Remnant Ecosystem2; (with the exception of the Category A, Environmentally Sensitive Areas - Irongate Conservation Park located within the tenement boundaries of EPC761 and Lake Broadwater Resource Reserve located near boundary of EPC758 (maps attached). No exploration work is to be undertaken within 1km of the Irongate Conservation Park or the Lake Broadwater Resource Reserve

  8. B4

    When carrying out exploration activities within an Endangered Regional Ecosystem the holder of the environmental authority must do so in accordance with the scale of the activities as outlines below: Drilling or seismic Grid Lines 1.1 spacing of gridlines is not less than 500m apart; and 1.2 spacing may be reduced to 250m at no more than three specified prospects. Drill Sites 1.3. operational areas are no greater than 1000m2 ; 1.4. sump size is no greater than 10m2 ; 1.5. topsoil stripping is limited to sump area; and 1.6. clearing of mature trees is prevented or minimised. Tracks 1.7. spacing between tracks is not less than 500m; and 1.8. existing access and fence line tracks are used where possible and any new tracks are constructed by linking natural clearings where possible; and 1.9. track construction involving blade clearing of established ground cover vegetation and/or clearing of mature trees is prevented or minimised; and 1.10.line of sight clearing is prevented or minimised. Local Land Disturbance 1.11. exploration must not involve costeaning or bulk sampling in areas of Endangered Regional Ecosystems; and 1.12. establishing exploration camps will not involve clearing of areas of Endangered Regional Ecosystems.

    page 5Land and soil, Biodiversity
  9. B5

    Rubber tyred low ground pressure vehicles and machinery is to be used where possible.

  10. B6

    Transport of weeds on vehicles and machinery must be prevented.

  11. B7

    The environmental authority holder will limit total disturbance within any areas identified as Endangered Regional Ecosystems to a maximum area of 1% of the remnant patch or up to a maximum area of 1000 square metres at any one location.

  12. B8

    In regards to complying with Standard Environmental Condition 42, the holder of the environmental authority must revegetate the areas identified as Endangered Regional Ecosystems with plant species from the same ecosystem type. The holder of the environmental authority must consult with the Environmental Protection Agency prior to commencing rehabilitation of disturbed areas in or within 500m of an Endangered Regional Ecosystem to determine the most appropriate technique for the specific area.

    page 6Rehabilitation
  13. B9

    Rehabilitation of all areas disturbed within the Endangered Regional Ecosystem will be completed as soon as practical by no longer than three months after completion of the disturbance activity. 1 Important Note to Condition (B2) Environmentally Sensitive Areas identified in and adjacent to EPC 762 are listed in the table below. Category Land Area Classification General location Who to contact Category B Designated Landscape BRIS 2975 sub-block o p Environmental Protection Agency t u (EPC762) Principle Conservation Officer Area (Meringandan) (Cultural Heritage) Toowoomba BRIS 2899 (07) 46398358 Category B Cultural Heritage sub-block t u y z Environmental Protection Agency (Jondaryan Homestead) BRIS 2900 sub-block v Register and Database Officer

    page 6Rehabilitation
  14. B10

    Access onto all State Forests (Category C Environmentally Sensitive Areas) will be subject to an application for a Permit to Traverse for Exploration Purposes from the Queensland Parks and Wildlife Service Dalby Office. END OF CONDITIONS FOR SCHEDULE B Schedule C - Land Management

  15. C1

    The holder of the environmental authority accepts the rehabilitation liability associated with exploration activities on EPC 762.

    page 7Rehabilitation
  16. C2

    The holder of the environmental authority must consult with the Environmental Protection Agency to determine the existing rehabilitation liability associated with exploration activities undertaken by New Hope Exploration Pty Ltd on EPC 762.

    page 7Rehabilitation
  17. C3

    The holder of the environmental authority must rehabilitate the areas disturbed by exploration activities on EPC 762 to the satisfaction of the Environmental Protection Agency. END OF CONDITIONS FOR SCHEDULE C END OF ENVIRONMENTAL AUTHORITY

    page 7Rehabilitation