Data as at 14 September 2026 · from the Queensland EP Act public register
EPVX00140213 · BHP COAL PTY LTD
Coal environmental authority EPVX00140213 (BHP COAL PTY LTD), Granted. 10 conditions indexed. No PRC plan.
- Status
- Granted
- Holders
- BHP COAL PTY LTD; BHP Queensland Coal Investments Pty Ltd; Mitsubishi Development Pty Ltd; QCT INVESTMENT PTY. LTD.; QCT MINING PTY. LTD.; QCT RESOURCES PTY LIMITED; Umal Consolidated Pty Ltd
- PRC plan
- None
- How it was read
- Numbered conditions (OCR)
- Register
- Register record · Instrument PDF
Conditions
10 numbered conditions read from the current instrument. Page numbers link into the register PDF.
- B1-1
The environmental authority holder is authorised to construct two borehole on EPC718 within the 500m ERE buffer. The subsequent conditions, B2-1 to B4-2, authorises the environmental disturbance related to this borehole. Drill sites (B2-1} The operational area of the drill site within ERE 500m buffer must not exceed 1000m?.
- B2-2
The drill hole within the buffer of the ERE is limited to less than 200mm in diameter.
- B2-3
The construction of sumps within the ERE buffer must not exceed 10m?.
- B2-4
Topsoil stripping within the ERE buffer is limited to an area no greater than 25m x 25m. (B2-5} ‘The environmental holder must minimise disturbance within the ERE buffer and avoid clearing of trees. Tracks (B3-1} Existing access and fence line tracks must be used wherever possible. Any new tracks are to be constructed by linking natural cleared or disturbed areas. (B3-2)} Track construction must avoid clearing of trees; and
- B3-3
Where new tracks are required they will not be constructed greater than 5m in width.
- B3-4
Track construction involving blade clearing of established ground cover vegetation and/or clearing of mature trees is to be minimised.
- B3-5
No clearing of disturbance for access to boreholes will take place within the ERE. yp ecoaccess environmental licences and permits Permit Permit number: MIN200535207 Other land disturbance
- B4-1
Exploration within the ERE buffer must not involve costeaning or bulk sampling activities.
- B4-2
Exploration camps must not be established within the ERE and 500m buffer.
- B4-3
Rehabilitation of drill sites and sumps will be in accordance with the Code of Environmental Compliance for Exploration and Mineral Development Projects. END OF CONDITIONS FOR SCHEDULE B C~ Schedule C - Definitions “authority” means environmental authority (mining activities) under the Environmental Protection Act 1994. “environmental authority holder” means the holder of this environmental authority. “ERE” means Endangered Regional Ecosystem. “land” in the “land schedule” of this document means land excluding waters and the atmosphere. . END OF CONDITIONS