Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Minerals environmental authority

EPVL01491513 · Timothy Francis Pyke

Minerals environmental authority EPVL01491513 (Timothy Francis Pyke), Granted. 8 conditions indexed. No PRC plan.

Status
Granted
Holders
Timothy Francis Pyke; Emma Pyke
Tenures
ML70510
PRC plan
None
How it was read
Numbered conditions
Register
Register record · Instrument PDF

Conditions

8 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. F1

    buffer of any Category B Environmentally Sensitive Areas. The environmental authority holder is not authorised to undertake any mining activities in any

  2. F2

    Category B Environmentally Sensitive Area. Roads and Tracks Existing access and fence line tracks must be used wherever possible. Any new tracks are to be

  3. F3

    constructed (with prior consultation of the landowner) by linking naturally cleared or disturbed areas. When constructing tracks, the environmental authority holder must minimise disturbance and

  4. F4

    avoid clearing of trees in or within the 1km buffer and in Category B Environmentally Sensitive Areas. Rehabilitation Rehabilitation must be carried out in accordance with the Code of Environmental Compliance for

    page 5Rehabilitation
  5. F5

    Mining Lease Projects. Rehabilitation of disturbance within the 1km buffer of Category B Environmentally Sensitive

    page 5Rehabilitation
  6. F6

    Areas must be completed as soon as practicable, but no longer than three (3) months after completion of the disturbance activity. All land subject to mining activities must be rehabilitated within six (6) months of concluding

    page 5Rehabilitation
  7. F7

    mining activities to a non-polluting, safe, stable and self-sustaining landform as per the Code of Environmental Compliance for Mining Lease Projects. Reporting An annual report must be prepared each year and made available to the administering authority upon request. The report must include a map identifying all mining activities undertaken to date

    page 5Monitoring and reporting
  8. F8

    on each tenure under this environmental authority. The map is to clearly distinguish between proposed, completed and rehabilitated mining activities to demonstrate compliance with this environmental authority. END OF CONDITIONS DEFINITIONS Key terms and/or phrases used in this document are defined in this section. Applicants should note that where a term is not defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies and codes must be used. If a word remains undefined it has its ordinary meaning. Activity means the environmentally relevant activities, whether resource activities or prescribed activities, to which the environmental authority relates. predecessors. Contaminant A contaminant can be - a) a gas, liquid or solid; or b) an odour; or c) an organism (whether alive or dead), including a virus; or d) energy, including noise, heat, radioactivity and electromagnetic radiation; or e) a combination of contaminants. Disturbed means any area that has had its natural state altered by the action or interference of carrying out an activity associated with the mining project. Environmental authority means an environmental authority under Chapter 5 of the Environmental Protection Act 1994. Environmental nuisance (the Act) is unreasonable interference or likely interference with an environmental value caused by- a) aerosols, fumes, light, noise, odour, particles or smoke; or b) an unhealthy, offensive or unsightly condition because of contamination; or c) another way prescribed by regulation. Environmental value (the Act) is- a) a quality or physical characteristic of the environment that is conducive to ecological health or public amenity or safety; or b) another quality of the environment identified and declared to be an environmental value under an environmental protection policy or regulation. Financial assurance means a security required under the Environmental Protection Act 1994 by the administering authority to cover the cost of rehabilitation or remediation of disturbed land or to secure compliance with the environmental authority. Track/s means roads, tracks or paths, greater than ten (10) metres in length, that have been fully stripped of all vegetation to enable the progress of vehicles, equipment or pedestrians. END OF DEFINITIONS END OF PERMIT

    page 5Rehabilitation, Air, Noise and vibration, Biodiversity