Data as at 14 September 2026 · from the Queensland EP Act public register
EPSL00065813 · Tangawa Gold Pty Ltd
Minerals environmental authority EPSL00065813 (Tangawa Gold Pty Ltd), Granted. 12 conditions indexed. No PRC plan.
- Status
- Granted
- Holders
- Tangawa Gold Pty Ltd
- Tenures
- ML10024; ML10189
- PRC plan
- None
- How it was read
- Numbered conditions (OCR)
- Register
- Register record · Instrument PDF
Conditions
12 numbered conditions read from the current instrument. Page numbers link into the register PDF.
- A1
The conditions of this environmental authority are in force until a surrender of the authority is accepted pursuant to the Environmental Protection Act 1994. The conditions apply unless an amendment i is approved pursuant to the Environmental Protection Act 1994.
- A2
The environmental authority holder is to give the administering authority a financial assurance in the amount and form and at a time required by the administering authority.
- A3
The environmental authority holder must comply with each of the Standard Environmental Conditions contained in the Code of Environmental Compliance for Mining Lease Projects dated January 2001." Schedule B — Additional Conditions' (B1} The environmental authority holder must ensure that any person employed or contracted is made aware of, understands and complies with conditions B2 to B10.
- B2
The requirements of this environmental authority, during the currency of the Mining Leases, shall continue until the site has been inspected by an officer of State Water Projects and any works may be directed are completed to the satisfaction of State Water Projects and the environmental authority holder has been notified in writing.
- B3
No chemicals whatsoever are to be used in connection with the processing of materials within the bed and banks of the Burdekin River (the River).
- B4
All waste, oil and grease are to be removed from site. Two hundred litres is the maximum volume of fuel allowed to be stored on site at any time. The fuel is to be contained within a secure vessel. A suitable container will be installed at all times to prevent any possible spillage within the bed and banks of the River.
- B5
No materials are to be extracted from the River's main low flow section located on the far right hand side of the River’s bed.
- B6
€xtraction of materials is restricted to river wash only. No materials are to be disturbed or taken from the River's banks. All excavations made shall have a batter flatter than one on three.
- B7
The bed of the watercourse shail be left with an even longitudinal grade, smooth and free from holes and ridges.
- B8
The campsite location should be such that no domestic or industrial waste can enter the River. All rubbish is to be disposed of by authorised rubbish dumps.
- B9
Ail toilet facilities are to be located at least 400m away from the river and shall be adequate to prevent any overflow or non-treated effluent entering the River.
- B10
All requirements for relevant licences and authorisations under the Water Resources Act are to be approved prior fo any mining being undertaken. These relate to construction of dams, watercourse alterations and extractions of water from the River. " Schedule B reflects the conditions imposed as conditions of Mining Lease 10024 by State Water Projects, Department of Natural Resources. END OF ENVIRONMENTAL AUTHORITY “2 01/01 Page 2/of 2