Data as at 14 September 2026 · from the Queensland EP Act public register
EPML01978714 · Dysart East Coal Project
Minerals environmental authority EPML01978714 (Dysart East Coal Project), Granted. 17 conditions indexed. Holds PRC plan P-PRCP-100896397.
- Status
- Granted
- Holders
- Bengal Coal Pty Ltd
- Tenures
- ML70507
- PRC plan
- P-PRCP-100896397 · effective 2025-06-30
- How it was read
- Numbered conditions, partial, plus page text (OCR)
- Register
- Register record · Instrument PDF
Conditions
17 numbered conditions read from the current instrument. Page numbers link into the register PDF.
- A2
Scope of activity This environmental authority authorises a coal extraction rate of up to 1.9 million tonnes per annum (Mtpa) of run of mine (ROM) coal from the Dysart East Coal Project located on MLA70507.
- A3
In carrying out the mining activities authorised by this environmental authority, the holder must comply with Appendix A - Dysart East Coal Project authorised surface disturbance footprint and Appendix B - Dysart East Coal Project authorised underground (bord and pillar) disturbance footprint.
- A4
Maintenance and operation of plant and equipment The holder of this environmental authority must: a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) maintain such measures, plant and equipment in a proper and efficient condition; Cc) operate such measures, plant and equipment in a proper and efficient manner; and d) ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated. neces Permit Environmental Authority EPML01978714 — Dysart East Coal Project | AS | Monitoring | Except where specified otherwise in another condition of this environmental! authority, all monitoring records or reports required by this environmental authority must be kept for a period of not less than five (5) years. i
- A6
Financial assurance ; authority and any costs or expenses, or likely costs or expenses, mentioned in section 298 of the Environmental Protection Act 1994. The activity must not be carried out until the environmental authority holder has given financial assurance to the administering authority as security for compliance with this environmental The amount of financial assurance must be reviewed by the holder of this environmental authority when a plan of operations is amended or replaced or the authority is amended The holder of this environmental authority must develop and implement a risk management i system for mining activities which mirrors the content requirement of the Standard for Risk Management (ISO31000:2009), or the latest edition of an Australian standard for risk | management, to the extent relevant to environmental management, prior to commencing project | stage 1. i AQ | Notification of emergencies, incidents and exceptions The holder of this environmental authority must notify the administering authority by written | notification within twenty four (24) hours, after becoming aware of any emergency or incident | which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with, the Conditions of this environmental authority.
- A10
Within ten (10) business days following the initial notification of an emergency or incident, or | receipt of monitoring results, whichever is the latter, further written advice must be provided to the | administering authority, including the following: | a) results and interpretation of any samples taken and analysed; | | b) ourromes of actions taken at the time to prevent or minimise unlawful environmental harm; | an c) proposed actions to prevent a recurrence of the emergency or incident. |
- A11
Complaints | The holder of this environmental authority must record all environmental complaints received about the mining activities including: a) name, address and contact number for of the complainant; b) time and date of complaint; c) reasons for the complaint; | d) investigations undertaken; |e) conclusions formed; f) actions taken to resolve the complaint; | g) any abatement measures implemented; and | i”) person responsible for resolving the complaint. | iP Permit Environmental Authority EPML01978714 — Dysart East Coal Project undertake relevant specified monitoring within a reasonable timeframe nominated or agreed to by the administering authority to investigate any complaint of environmental harm. The results of the investigation (including an analysis and interpretation of the monitoring results) and abatement measures, where implemented, must be provided to the administering authority within ten (10) business days of completion of the investigation, or no later than ten (10) business days after the end of the timeframe nominated by the administering authority to undertake the investigation.
- A12
| The holder of this environmental authority must, when requested by the administering authority, ]
- A13
Third-party reporting The holder of this environmental authority must: a) within one (1) year of the commencement of this environmental authority, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) obtain further such reports at regular intervals, not exceeding three (3) yearly intervals, from the completion of the report referred to above; and c) provide each report to the administering authority within ninety (90) days of its completion. Where a condition of this environmental authority requires compliance with a standard, policy or guideline published externally to this environmental authority and the standard is amended or changed to provide a better environmental outcome, subsequent to the issue of this environmental authority, the holder must: a) comply with the amended or changed standard, policy or guideline within two (2) years of the amendment or change being made, unless a different period is specified in the amended standard or relevant legislation; and b) until compliance with the amended or changed standard, policy or guideline is achieved, continue to remain in compliance with the corresponding provision that was current immediately prior to the relevant amendment or change. Chemicals and flammable or combustible liquids | All explosives, hazardous chemicals, corrosive substances, toxic substances, gases and dangerous goods should be stored and handled in accordance with the current Australian standard where such is applicable. | Permit Environmental Authority EPML01978714 — Dysart East Coal Project Schedule B: Air Condition | Condition number The environmental authority holder shall ensure that all reasonable and feasible avoidance and mitigation measures are employed so that the dust and particulate matter emissions generated by the mining activities do not cause exceedances of the following levels when measured at any sensitive or commercial place: 1a) dust deposition of 120 milligrams per square metre per day, averaged over one (1) month, when monitored in accordance with the most recent version of Australian Standard AS3580.10.1 Methods for sampling and analysis of ambient air—Determination of particulate matter—Deposited matter — Gravimetric method. b) aconcentration of particulate matter with an aerodynamic diameter of less than 10 micrometres (PM,9) suspended in the atmosphere of 50 micrograms per cubic metre over a 24-hour averaging time, for no more than five (5) exceedances* recorded each year, when monitored in accordance with the most recent version of either: i) Australian Standard AS3580.9.6 Methods for sampling and analysis of ambient air—
- A141
adj, 15 mins ' H ! | |AV=10 |AV=10 | AV=5 AV=10 AV=10 | AV=5— Commercial Place Noise level dB(A) Monday to Saturday Sundays and Public Holidays measured as: 7am to 6pm | 40pm | 7am to 6pm to 40pm to to10pm =| to7am | 6pm 10pm 7am CV =45 | CV =40 AV = 10 AV =8 Linea, adj, 15 mins | | NOTE: Table D1 — Noise limits: 1. CV= Critical Value 2. AV =Adjustment Value 3. To calculate noise limits in Table D1: If bg s (CV — AV): Noise limit = bg + AV If (CV — AV) < bg < CV: Noise limit = CV If bg > CV: Noise limit = bg + 0 4. In the event that measured bg (Lago, acj, 15 mins) is less than 30 dB(A), then 30 dB(A) can be substituted for the measured background level 5. bg = background noise level (Lago, ag, 15 mins) Measured over 3-5 days at the nearest sensitive receptor 6. if the project is unable to meet the noise limits as calculated above alternative limits may be calculated using the processes outlined in the “Planning for Noise Contro!” guideline. Table D2 — Blasting noise limits Sensitive or commercial Blasting noise limits place limits. Blasting Noise 7am to 6pm 6pm to 7am Airblast overpressure 115 dB (Linear) Peak for 9 out of 10 consecutive blasts initiated and not greater than 120 bB (Linear) Peak at | | any time. No surface blasting to occur. Sub-surface blasting to not exceed noise limits specified in Table D1 — Noise limits for a sensitive place on a Sunday or public holiday. Ground vibration | 5mm/second peak particle velocity | No surface blasting to occur.
- F1
Contaminant release Contaminants that will, or have the potential to cause environmental harm must not be released directly or indirectly to any waters as a result of the authorised mining activities, except as permitted under the conditions of this environmental authority. Unless otherwise permitted under the conditions of this environmental authority, the release of mine affected water to waters must only occur from the release points specified in Table F1 - Mine affected water release points, sources and receiving waters and depicted in Appendix D — Authorised release points and surface water monitoring points attached to this environmental authority. The release of mine affected water to internal water management infrastructure installed and operated in accordance with a water management plan that complies with Condition F24 is permitted. Table F1 - Mine affected water release points, sources and receiving waters Release | Latitude Longitude Mine affected Monitorin Receiving point (decimal degree, | (decimal degree, water source and oint g waters (RP) GDA94) GDA94) location P description NOTE: This environmental authority does not authorise contaminant releases until the tables in Schedule F: Water are amended to specify the required details. The release of mine affected water to waters in accordance with condition F2 must not exceed the release limits stated in Table F2 — Mine affected water release limits when measured at the monitoring points specified in Table F1 — Mine affected water release points, sources and receiving waters for each quality characteristic. Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table F2 - Mine affected water release limits | Quality characteristic | Release limits Monitoring Comment frequency Electrical TBA | Daily during release (the conductivity — tet first sample must be taken (yS/cm) (Release limits specified in Table within two hours of
- F4
— Mine affected water release during flow events for variable flow criteria.) commencement of release) | | Daily during release (the . | first sample must be taken pH (pH Unit) TBA within two hours of commencement of release) | 5 pS TBA (Current limit or limit derived from |_| Turbidity is required to suspended solids limit and : Daily during release (first assess ecosystems | 1ogs . { . . . Turbidity (NTU) | demonstrated correlation between | Sample within two hours of | impacts and can turbidity to suspended solids commencement of release) provide instantaneous | historical monitoring data for dam results. | water.) i a NOTE: This environmental authority does not authorise contaminant releases until the tables in Schedule F: Water are amended to specify the required details. r
- F5
| The release of mine affected water to waters from the release points must be monitored at the | {ocations specified in Table F1 — Mine affected water release points, sources and receiving i waters for each quality characteristic and at the frequency specified in Table F2 — Mine affected water release limits and Table F3 — Release contaminant trigger investigation levels, potential contaminants. ! NOTE: The administering authority will take into consideration any extenuating circumstances prior to determining an appropriate enforcement response in the event condition FS is contravened due to a temporary lack of safe or practical access. The administering authority expects the environmental authority | holder to take all reasonable and practicable measures to maintain safe and practical access to designated | monitoring locations. NN — — ev_lO Permit Environmental Authority EPMLO1978714 — Dysart East Coal Project Table F3 — Release contaminant trigger investigation levels, potential contaminants Trigger levels (ug/L unless characteristic | specified otherwise Comment on trigger level For aquatic ecosystem protection, based on SMD Aluminium ae ll guideline For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on SMD guideline Arsenic Cadmium For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on LOR for ICPMS For aquatic ecosystem protection, based on low reliability guideline For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on LOR for CV FIMS
- F16
The environmental authority holder must, within twenty-eight (28) days of a release that is not | compliant with the conditions of this environmental authority, provide a report to the administering authority detailing: quality characteristic and at the monitoring frequency stated in Table F5 — Receiving waters contaminant trigger levels. \ | a) the reason for the release; j | | b) the location of the release; | | c) the total volume of the release and which (if any) part of this volume was non-compliant; | d) the total duration of the release and which (if any) part of this period was non-compliant; e) all water quality monitoring results (including all laboratory analyses); f) identification of any environmental harm as a result of the non-compliance; g) all calculations; and h) any other matters pertinent to the water release event. i | F17 Receiving environment monitoring and contaminant trigger levels | The quality of the receiving waters must be monitored at the locations specified in Table F6 — Receiving water upstream background sites and downstream monitoring points for each | Table F5 — Receiving waters contaminant trigger levels Trigger Level | TBA | Quality Characteristic Monitoring Frequency f ' | DH (pH units) Daily during the release Electrical Conductivity (uS/cm) Suspended solids (mg/L) | Suiphate (SO,”) | TBA (mg/L) | | 1 i NOTE: This environmental authority does not authorise contaminant releases until the tables in Schedule F: Water are amended to specify the required details. Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table F6 — Receiving water upstream background sites and downstream monitoring points Latitude Longitude
- F21
| The environmental authority holder must submit a REMP design document to the administering | | authority for approval by 12 months from the granting of the tenure. The REMP design document must describe all monitoring sites and all parameters that will be monitored as part of the REMP, the frequency with which they will be monitored, the flow conditions under which they will be monitored and all methods used to accomplish the monitoring.
- F22
A REMP report outlining the findings of the REMP, including all monitoring results and | interpretations must be prepared annually and made available on request to the administrating authority. All data should be maintained for a minimum of five (5) years in an appropriate electronic format. This must include an assessment of background reference water quality, the condition of downstream water quality compared against water quality objectives, and the suitability of current discharge limits to protect downstream environmental values.
- F23
| Water reuse | Mine affected water may be piped or trucked or transferred by some other means that does not ! contravene the Conditions of this environmental authority and deposited into artificial water storage structures, such as farm dams or tanks, or used directly at properties owned by the environmental authority holder or a third party (with the consent of the third party). A Water Management Plan must be developed by an appropriately qualified person and | implemented. | Stormwater and Water Sediment Controls
- F24
Water Management Plan a An Erosion and Sediment Control Plan must be developed by an appropriately qualified person and implemented for all stages of the mining activities on the site to minimise erosion and the release of sediment to receiving waters and contamination of stormwater. F26 Stormwater, other than mine affected water, is permitted to be released to waters from: a) erosion and sediment control structures that are installed and operated in accordance with the Erosion and Sediment Control Plan required by condition F25; and 7 N ao b) water management infrastructure that is installed and operated, in accordance with a Water Management Plan that complies with condition F24, for the purpose of ensuring water does | not become mine affected water. | Schedule G: Sewage treatment Condition | Condition number | The only contaminant permitted to be released to land is treated sewage effluent in compliance with the release limits stated in Table G1 — Contaminant release limits to land. Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table G1 — Contaminant release limits to land The application of treated effluent to land must be carried out in a manner such that: a) vegetation is not damaged; b) there is no surface ponding of effluent; and c) there is no run-off of effluent. cm c 3 If areas irrigated with effluent are accessible to employees or the general public, prominent Signage must be provided advising that effluent is present and care should be taken to avoid consuming or otherwise coming into unprotected contact with the effluent. G | bh
Instrument text by page (numbering incomplete)
Numbering in this instrument has gaps, so its full text is also shown page by page.
- Page 1
Permit’ Environmental Protection Act 1994 Environmental authority EPML01978714 — Dysart East Coal Project This environmental authority is issued by the administering authority under Chapter 5 of the Environmental Protection Act 1994. Permit’ number: EPML01978714 Environmental authority takes effect: Upon grant of tenure MLA70507 Anniversary date: The anniversary dates of this environmental authority are the same day each year as the effective date. An annual return and the payment of the annual fee will be due each year on this day. The first annual fee is payable within 20 business days of the effective date. Registered address Level 10, 12 Creek Street BRISBANE CITY QLD 4000 Mining Lease Application (MLA) 70507 Environmental authority holder(s) Bengal Coal Pty Ltd Environmentally relevant activity and location details Environmentally relevant activity(ies) Environmental Protection Regulation 2008, Schedule 2A ERA 13 Mining black coal Environmental Protection Regulation 2008, Schedule 2 ERA 15 Fuel burning — using fuel burning equipment that is capable of burning at least 500kg of fuel in an hour. ERA 31 Mineral! Processing — Threshold 2 processing, ina year, the following quantities of mineral products, other than coke — (b) more than 100,000t. ERA 63 Sewage Treatment — Threshold 1 operating sewage treatment works, other than no-release works, with a total daily peak design capacity of — (b) more than 100 but not more than 1500 EP — (i) if treated effluent is discharged from the works to an infiltration trench or through an irrigation scheme. ' Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as required by legislation www.ehp.qid.gov.au ABN 46 640 294 485 Spit DH LAGAN oy Queensland Government
- Page 2
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Additional information for applicants Environmentally relevant activities The description of any environmentally relevant activity (ERA) for which an environmental authority is issued is a restatement of the ERA as defined by legislation at the time the approval is issued. Where there is any inconsistency between that description of an ERA and the Conditions stated by an environmental authority as to the scale, intensity or manner of carrying out an ERA, then the Conditions prevail to the extent of the inconsistency. An environmental authority authorises the carrying out of an ERA and does not authorise any environmental harm unless a Condition stated by the authority specifically authorises environmental harm. A person carrying out an ERA must also be a registered suitable operator under the Environmental Protection Act 1994 (EP Act). Contaminated land It is a requirement of the EP Act that if an owner or occupier of land becomes aware a notifiable activity (as defined in Schedule 3 and Schedule 4) is being carried out on the land, or that the land has been, or is being, contaminated by a hazardous contaminant, the owner or occupier must, within 22 business days after becoming so aware, give written notice to the chief executive. fp 2 : Ut | 3//& [16 | Ke - Signature Date Kate Bennink Enquiries: Environmental Protection Act 1994 Protection PO Box 3028 EMERALD QLD 4720 Phone: 07 4987 9320 Email: CRMining@ehp.qld.gov.au I I
- Page 3
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Obligations under the Environmental Protection Act 1994 In addition to the requirements found in the Conditions of this environmental authority, the holder must also meet their obligations under the EP Act, and the regulations made under the EP Act. For example, the holder must comply with the following provisions of the Act: * general environmental duty (section 319); e duty to notify environmental harm (section 320-320G); ¢ offence of causing serious or material environmental harm (sections 437-439); ¢ offence of causing environmental nuisance (section 440); ¢ offence of depositing prescribed water contaminants in waters and related matters (section 440ZG); and ¢ offence to place contaminant where environmental harm or nuisance may be caused (section 443). Conditions of environmental authority The environmentally relevant activity(ies) conducted at the location as described above must be conducted in accordance with the following site specific Conditions of approval. Schedule A: General Condition number This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm. A2 Scope of activity This environmental authority authorises a coal extraction rate of up to 1.9 million tonnes per annum (Mtpa) of run of mine (ROM) coal from the Dysart East Coal Project located on MLA70507. A3 In carrying out the mining activities authorised by this environmental authority, the holder must comply with Appendix A - Dysart East Coal Project authorised surface disturbance footprint and Appendix B - Dysart East Coal Project authorised underground (bord and pillar) disturbance footprint. A4 Maintenance and operation of plant and equipment The holder of this environmental authority must: a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) maintain such measures, plant and equipment in a proper and efficient condition; Cc) operate such measures, plant and equipment in a proper and efficient manner; and d) ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated. neces
- Page 4
Permit Environmental Authority EPML01978714 — Dysart East Coal Project | AS | Monitoring | Except where specified otherwise in another condition of this environmental! authority, all monitoring records or reports required by this environmental authority must be kept for a period of not less than five (5) years. i A6 Financial assurance ; authority and any costs or expenses, or likely costs or expenses, mentioned in section 298 of the Environmental Protection Act 1994. The activity must not be carried out until the environmental authority holder has given financial assurance to the administering authority as security for compliance with this environmental The amount of financial assurance must be reviewed by the holder of this environmental authority when a plan of operations is amended or replaced or the authority is amended The holder of this environmental authority must develop and implement a risk management i system for mining activities which mirrors the content requirement of the Standard for Risk Management (ISO31000:2009), or the latest edition of an Australian standard for risk | management, to the extent relevant to environmental management, prior to commencing project | stage 1. i AQ | Notification of emergencies, incidents and exceptions The holder of this environmental authority must notify the administering authority by written | notification within twenty four (24) hours, after becoming aware of any emergency or incident | which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with, the Conditions of this environmental authority. A10 Within ten (10) business days following the initial notification of an emergency or incident, or | receipt of monitoring results, whichever is the latter, further written advice must be provided to the | administering authority, including the following: | a) results and interpretation of any samples taken and analysed; | | b) ourromes of actions taken at the time to prevent or minimise unlawful environmental harm; | an c) proposed actions to prevent a recurrence of the emergency or incident. | A11 Complaints | The holder of this environmental authority must record all environmental complaints received about the mining activities including: a) name, address and contact number for of the complainant; b) time and date of complaint; c) reasons for the complaint; | d) investigations undertaken; |e) conclusions formed; f) actions taken to resolve the complaint; | g) any abatement measures implemented; and | i”) person responsible for resolving the complaint. | iP
- Page 5
Permit Environmental Authority EPML01978714 — Dysart East Coal Project undertake relevant specified monitoring within a reasonable timeframe nominated or agreed to by the administering authority to investigate any complaint of environmental harm. The results of the investigation (including an analysis and interpretation of the monitoring results) and abatement measures, where implemented, must be provided to the administering authority within ten (10) business days of completion of the investigation, or no later than ten (10) business days after the end of the timeframe nominated by the administering authority to undertake the investigation. A12 | The holder of this environmental authority must, when requested by the administering authority, ] A13 Third-party reporting The holder of this environmental authority must: a) within one (1) year of the commencement of this environmental authority, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) obtain further such reports at regular intervals, not exceeding three (3) yearly intervals, from the completion of the report referred to above; and c) provide each report to the administering authority within ninety (90) days of its completion. Where a condition of this environmental authority requires compliance with a standard, policy or guideline published externally to this environmental authority and the standard is amended or changed to provide a better environmental outcome, subsequent to the issue of this environmental authority, the holder must: a) comply with the amended or changed standard, policy or guideline within two (2) years of the amendment or change being made, unless a different period is specified in the amended standard or relevant legislation; and b) until compliance with the amended or changed standard, policy or guideline is achieved, continue to remain in compliance with the corresponding provision that was current immediately prior to the relevant amendment or change. Chemicals and flammable or combustible liquids | All explosives, hazardous chemicals, corrosive substances, toxic substances, gases and dangerous goods should be stored and handled in accordance with the current Australian standard where such is applicable. |
- Page 6
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Schedule B: Air Condition | Condition number The environmental authority holder shall ensure that all reasonable and feasible avoidance and mitigation measures are employed so that the dust and particulate matter emissions generated by the mining activities do not cause exceedances of the following levels when measured at any sensitive or commercial place: 1a) dust deposition of 120 milligrams per square metre per day, averaged over one (1) month, when monitored in accordance with the most recent version of Australian Standard AS3580.10.1 Methods for sampling and analysis of ambient air—Determination of particulate matter—Deposited matter — Gravimetric method. b) aconcentration of particulate matter with an aerodynamic diameter of less than 10 micrometres (PM,9) suspended in the atmosphere of 50 micrograms per cubic metre over a 24-hour averaging time, for no more than five (5) exceedances* recorded each year, when monitored in accordance with the most recent version of either: i) Australian Standard AS3580.9.6 Methods for sampling and analysis of ambient air— Determination of suspended particulate matter—PMyo high volume sampler with size- selective inlet — Gravimetric method; or ii) Australian Standard AS3580.9.9 Methods for sampling and analysis of ambient air— Determination of suspended particulate matter—PMyo low volume sampler—Gravimetric method. | c) aconcentration of particulate matter with an aerodynamic diameter of less than 2.5 | micrometres (PM25) suspended in the atmosphere of 25 micrograms per cubic metre over a 24-hour averaging time, when monitored in accordance with the most recent version of Determination of suspended particulate matter—PM (sub)2.5(/sub) low volume sampler— Gravimetric method. id) aconcentration of particulate matter suspended in the atmosphere of 90 micrograms per cubic metre over a one (1) year averaging time, when monitored in accordance with the most recent version of Australian Standard AS/NZS3580.9.3:2003 Methods for sampling and analysis of ambient air—Determination of suspended particulate matter— Total suspended particulate matter (TSP)—High volume sampler gravimetric method. ij Australian Standard AS/NZS3580.9.10 Methods for sampling and analysis of ambient air— I | | * The five (5) exceedances for the PM,o standard outlined in condition B4 b) were introduced to account for the impact of bushfires, dust storms and fuel reduction burning for fire management purposes. The five (5) exceedances are in essence arbitrary in that the number was chosen as it is difficult to determine exactly the number of times these events may happen in any one year. | More than five (5) exceedances as a result of one or more of these events would not be | considered to be a breach of condition. re |
- Page 7
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Schedule C: Waste Management Condition | Condition number Unless otherwise permitted by the conditions of this environmental authority or with prior approval from the administering authority and in accordance with a relevant standard operating procedure, waste must not be burnt. | C2 Tailings disposal Tailings must be managed in accordance with procedures contained within the current plan of operations. These procedures must include provisions for: a) containment of tailings; b) the management of seepage and leachates both during operation and until this environmental authority is surrendered; c) the control of fugitive emissions to air; d) a program of progressive sampling and characterisation to identify acid producing potential and metal concentrations of tailings; e) maintaining records of the relative locations of any other waste stored within the tailings; f) rehabilitation strategy; and g) monitoring of rehabilitation, research and/or trials to verify the requirements and methods for decommissioning and final rehabilitation of tailings, including the prevention and management of acid mine drainage, erosion minimisation and establishment of vegetation cover. Schedule D: Noise Condition | Condition number Noise limits The holder of this environmental authority must ensure that noise generated by the mining activities does not cause the criteria in Table D1 — Noise limits to be exceeded at a sensitive place or commercial place. — Airblast overpressure nuisance The holder of this environmental authority must ensure that blasting does not cause the limits for peak particle velocity and air blast overpressure in Table D2 — Blasting noise limits to be exceeded at a sensitive place or commercial place. __|
- Page 8
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table D1 — Noise limits Sensitive Place Noise level dB(A) | Monday to Saturday | Sundays and Public Holidays measured as: 6pm to 10pm to 10pm 9am i" Cv =50 [Cv =45 [CV =40 |Cv=45 |Cv=40 |CV=35 | | Laegs adj, 15 mins | | AV=5 AV=5 AV =0 AV=5 AV=5 | AV =0 L lov =55 |cv=50 |cv=45 |[Cv=50 |CV=45 | CV =40 A141 adj, 15 mins ' H ! | |AV=10 |AV=10 | AV=5 AV=10 AV=10 | AV=5— Commercial Place Noise level dB(A) Monday to Saturday Sundays and Public Holidays measured as: 7am to 6pm | 40pm | 7am to 6pm to 40pm to to10pm =| to7am | 6pm 10pm 7am CV =45 | CV =40 AV = 10 AV =8 Linea, adj, 15 mins | | NOTE: Table D1 — Noise limits: 1. CV= Critical Value 2. AV =Adjustment Value 3. To calculate noise limits in Table D1: If bg s (CV — AV): Noise limit = bg + AV If (CV — AV) < bg < CV: Noise limit = CV If bg > CV: Noise limit = bg + 0 4. In the event that measured bg (Lago, acj, 15 mins) is less than 30 dB(A), then 30 dB(A) can be substituted for the measured background level 5. bg = background noise level (Lago, ag, 15 mins) Measured over 3-5 days at the nearest sensitive receptor 6. if the project is unable to meet the noise limits as calculated above alternative limits may be calculated using the processes outlined in the “Planning for Noise Contro!” guideline. Table D2 — Blasting noise limits Sensitive or commercial Blasting noise limits place limits. Blasting Noise 7am to 6pm 6pm to 7am Airblast overpressure 115 dB (Linear) Peak for 9 out of 10 consecutive blasts initiated and not greater than 120 bB (Linear) Peak at | | any time. No surface blasting to occur. Sub-surface blasting to not exceed noise limits specified in Table D1 — Noise limits for a sensitive place on a Sunday or public holiday. Ground vibration | 5mm/second peak particle velocity | No surface blasting to occur. peak particle for 9 out of 10 consecutive blasts and | . velocity not greater than 10 mm/second peak | Sub-surface blasting not to exceed 0.15mm/second particle velocity at any time | peak particle velocity for 9 out of 10 consecutive blasts and not greater than 1.0 mm/second peak | particle velocity at any time.
- Page 9
Permit Environmental Authority EPML01978714 — Dysart East Coal Project —_—— Monitoring and reporting Noise monitoring and recording must include the following descriptor characteristics and matters: a) Lan (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins); b) background noise LAQO; c) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels; d) atmospheric Conditions including temperature, relative humidity and wind speed and directions; e) effects due to any extraneous factors such as traffic noise; f) location, date and time of monitoring; and g) if the complaint concerns low frequency noise, Max LpLIN,T and one third octave band measurements in dB(LIN) for centre frequencies in the 10 — 200 Hz range. The holder of this environmental authority must develop and implement a blast monitoring program to monitor compliance with Table D2 — Blasting noise limits for: a) 100% of all blasts undertaken on this site at the nearest sensitive place or commercial place; and b) all blasts conducted during any time period specified by the administering authority at the nearest sensitive place or commercial place. Schedule E: Groundwater Condition | Condition number The holder of this environmental authority must not release contaminants to groundwater. 7 All determinations of groundwater quality and biological monitoring must be performed by an appropriately qualified person. Monitoring and reporting Groundwater quality and levels must be monitored at the locations and frequencies defined in Table — E1 Groundwater monitoring locations and frequency and Appendix C - Groundwater bore monitoring locations for quality characteristics identified in Table E2 — Groundwater quality triggers and limits.
- Page 10
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table E1 — Groundwater monitoring locations and frequency | Location Monitoring Frequency Monitoring Surface RL : Easting Northing | pl | (GDA94 - Zone | (GDA94 - (m) Quality sae ON | 55) Zone 55) | ALLUVIUM AQUIFER(S) | r Upstream MB1 | TBA TBA TBA Quarterly | Monthly for the first | 12 months of operation and quarterly thereafter Downstream | TBA | TBA TBA MB2 ! TERTIARYAQUIFER(S) DMB0‘1 643800 7506697 TBA Quarterly | Monthly for the first 12 months of | DMBO2 645006 7505158 i TBA operation and L | quarterly thereafter DMBO03 645516 7507278 ; TBA DMB04a 645143 7506841 | 188.46 PERMIAN AQUIFER(S) ; MB04b 645138 7506836 | 188.46 | Quarterly | Monthly for the first | t +- 5 12 months of | VWP1 — DYE008 | 643795 , 7506692 190.82 | operation and : quarterly thereafter VWP2 — DYE010 | 645001 7505153 | 197.57 | VWP3 - DYE015 | 645511 7507273 198.72 | i es Le NOTE: 1. SWL means Standing Water Level 2. Fields marked “TBA” must be provided to the administering authority prior to the commencement of project stage 2. cP
- Page 11
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table E2 — Groundwater quality triggers and limits Parameter Contaminant Triggers (pg/L) Contaminant Limit (ug/L) Aluminium TBA TBA Antimony TBA TBA — Arsenic TBA TBA | Calcium TBA TBA Chloride TBA TBA “| CO; TBA TBA TBA TBA Electrical Conductivity TBA TBA TBA TBA Iron TBA TBA Magnesium TBA TBA Mercury TBA TBA Molybdenum TBA TBA Total Petroleum TBA pH TBA | Potassium TBA | Selenium TBA | Silver TBA TBA TBA NOTE. Fields marked ‘TBA’ must be submitted to the administering authority for approval prior to the commencement of project stage 2. ~
- Page 12
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table E3 — Groundwater level monitoring Monitoring location ALLUVIUM AQUIFER(S) Level trigger threshold Upstream MB1 ! Downstream MB2 | DMBO2 ; DMB03 | TBA | DMB04a | TBA PERMIAN AQUIFER(S) | MB04b TBA | VWP3 — DYE015 NOTE: Fields marked ‘TBA’ must be submitted to the administering authority for approval prior to the commencement of project stage 2. NOTE 2: The proponent must establish replacement monitoring bores prior to the removal of each bore that is mined through as mining progresses. E4 Exceedance Investigation | If quality characteristics of groundwater from compliance bores identified in Table E1 — Groundwater monitoring locations and frequency exceed any of the trigger levels stated in Table E2 — Groundwater quality triggers and limits or exceed any of the groundwater level trigger thresholds stated in Table E3 - Groundwater level monitoring, the holder of this environmental authority must compare the compliance monitoring bore results to the reference | bore results and complete an investigation in accordance with the ANZECC and ARMCANZ 2000. E5 | Results of monitoring of groundwater from compliance bores identified in Table E1 — Groundwater monitoring locations and frequency, must not exceed any of the limits defined in | Table E3 - Groundwater quality triggers and limits Bore construction and maintenance and decommissioning. | The construction, maintenance and management of groundwater bores (including groundwater monitoring bores) must be undertaken in a manner that prevents or minimises impacts to the environment and ensures the integrity of the bores to obtain accurate monitoring. |
- Page 13
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Schedule F: Water Condition | Condition number F1 Contaminant release Contaminants that will, or have the potential to cause environmental harm must not be released directly or indirectly to any waters as a result of the authorised mining activities, except as permitted under the conditions of this environmental authority. Unless otherwise permitted under the conditions of this environmental authority, the release of mine affected water to waters must only occur from the release points specified in Table F1 - Mine affected water release points, sources and receiving waters and depicted in Appendix D — Authorised release points and surface water monitoring points attached to this environmental authority. The release of mine affected water to internal water management infrastructure installed and operated in accordance with a water management plan that complies with Condition F24 is permitted. Table F1 - Mine affected water release points, sources and receiving waters Release | Latitude Longitude Mine affected Monitorin Receiving point (decimal degree, | (decimal degree, water source and oint g waters (RP) GDA94) GDA94) location P description NOTE: This environmental authority does not authorise contaminant releases until the tables in Schedule F: Water are amended to specify the required details. The release of mine affected water to waters in accordance with condition F2 must not exceed the release limits stated in Table F2 — Mine affected water release limits when measured at the monitoring points specified in Table F1 — Mine affected water release points, sources and receiving waters for each quality characteristic.
- Page 14
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table F2 - Mine affected water release limits | Quality characteristic | Release limits Monitoring Comment frequency Electrical TBA | Daily during release (the conductivity — tet first sample must be taken (yS/cm) (Release limits specified in Table within two hours of F4 — Mine affected water release during flow events for variable flow criteria.) commencement of release) | | Daily during release (the . | first sample must be taken pH (pH Unit) TBA within two hours of commencement of release) | 5 pS TBA (Current limit or limit derived from |_| Turbidity is required to suspended solids limit and : Daily during release (first assess ecosystems | 1ogs . { . . . Turbidity (NTU) | demonstrated correlation between | Sample within two hours of | impacts and can turbidity to suspended solids commencement of release) provide instantaneous | historical monitoring data for dam results. | water.) i a NOTE: This environmental authority does not authorise contaminant releases until the tables in Schedule F: Water are amended to specify the required details. r F5 | The release of mine affected water to waters from the release points must be monitored at the | {ocations specified in Table F1 — Mine affected water release points, sources and receiving i waters for each quality characteristic and at the frequency specified in Table F2 — Mine affected water release limits and Table F3 — Release contaminant trigger investigation levels, potential contaminants. ! NOTE: The administering authority will take into consideration any extenuating circumstances prior to determining an appropriate enforcement response in the event condition FS is contravened due to a temporary lack of safe or practical access. The administering authority expects the environmental authority | holder to take all reasonable and practicable measures to maintain safe and practical access to designated | monitoring locations. NN — — ev_lO
- Page 15
Permit Environmental Authority EPMLO1978714 — Dysart East Coal Project Table F3 — Release contaminant trigger investigation levels, potential contaminants Trigger levels (ug/L unless characteristic | specified otherwise Comment on trigger level For aquatic ecosystem protection, based on SMD Aluminium ae ll guideline For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on SMD guideline Arsenic Cadmium For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on LOR for ICPMS For aquatic ecosystem protection, based on low reliability guideline For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on LOR for CV FIMS For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on low reliability guideline For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on low reliability guideline Chromium Mercury Nickel TBA Manganese TBA Molybdenum Selenium TBA For aquatic ecosystem protection, based on LOR for ICPMS Silver TBA For aquatic ecosystem protection, based on LOR for ICPMS Uranium TBA For aquatic ecosystem protection, based on LOR for ICPMS . TBA For aquatic ecosystem protection, based on LOR Vanadium for ICPMS . TBA For aquatic ecosystem protection, based on SMD raiment guideline Nitrate TBA For aquatic ecosystem protection, based on ambient Qld WQ Guidelines (2006) for TN Petroleum TBA hydrocarbons - Petroleum TBA T hydrocarbons - : TBA Protection of livestock and short term irrigation Fluoride (total) guideline TBA Sodium Monitoring frequency Commencement of release and thereafter weekly during release
- Page 16
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Trigger levels Gually (ug/L unless | Comment on trigger level Monitoring characteristic | specified frequency Suspended Solids Sulphate Drinking water environmental values from | (SO,." NHMRC 2006 guidelines OR ANZECC 14. All metals and metalloids must be measured as total (unfiltered) and dissolved (filtered). Trigger levels for metal/metalloids apply if dissolved results exceed trigger. 2. The quality characteristics required to be monitored as per Table F3 — Release contaminant trigger investigation levels, potential contaminants can be reviewed once the results of two years monitoring data is available, or if sufficient data is available to adequately demonstrate negligible environmental risk, and it may be determined that a reduced monitoring frequency is appropriate or that certain quality characteristics can be removed from Table F3 — Release contaminant trigger investigation levels, potential contaminants by amendment. 3. SMD - slightly moderately disturbed !evel of protection, guideline refers ANZECC & ARMCANZ (2000). 4. LOR - typical reporting for method stated. ICPMS/CV FIMS — analytical method required to achieve LOR. i If quality characteristics of the release exceed any of the trigger levels specified in Table F3 — Release contaminant trigger investigation levels, potential contaminants during a release : event, the environmental authority holder must compare the downstream results in the receiving | waters to the trigger values specified in Table F3 — Release contaminant trigger investigation levels, potential contaminants and: 1) where the trigger values are not exceeded then no action is to be taken, or 2) where the downstream results exceed the trigger values specified Table F3 — Release contaminant trigger investigation levels, potential contaminants for any quality characteristic, compare the results of the downstream site to the data from background monitoring sites and: a) if the result is less than the background monitoring site data, then no action is to be taken, or b) if the result is greater than the background monitoring site data, complete an investigation into the potential for environmental harm and provide a written report to the administering authority within ninety (90) days of receiving the result, outlining: i) details of the investigations carried out; and ii) actions taken to prevent environmental harm. | | NOTE: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with condition F6 2) b) of this condition, no further reporting is required for subsequent trigger events for that | : quality characteristic. | lf an exceedance in accordance with condition F6 2) b) is identified, the holder of the environmental authority must notify the administering authority in writing within twenty-four (24) hours of receiving the result. Mine affected water release events The holder must ensure a stream flow gauging station/s is installed, operated and maintained to determine and record stream flows at the locations and flow recording frequency specified in | Table F4 — Mine affected water release during flow events.
- Page 17
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Notwithstanding any other condition of this environmental authority, the release of mine affected water to waters in accordance with condition F2 must only take place during periods of natural flow in accordance with the receiving water flow criteria for discharge specified in Table F4 — Mine affected water release during flow events for the release point(s) specified in Table F1 — Mine affected water release points, sources and receiving waters. _| F10 The release of mine affected water to waters in accordance with Condition F2 must not exceed the maximum release rate (for all combined release point flows) for each receiving water flow criterion for discharge specified in Table F4 — Mine affected water release during flow events when measured at the monitoring points specified in Table F1 — Mine affected water release | points, sources and receiving waters.
- Page 18
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table F4 — Mine affected water release during flow events Receiving | Release | Gauging | Gauging | Gauging Receiving | Receiving | Maximum j; Electrical waters/ point | station station station water flow | water flow | release conductivity stream (RP) latitude longitude | recording | criteriafor ; rate (for release limits | | (decimal (decimal frequency | discharge .: all degree, combined i pasa | (see RP flows) | GDA94) ; Electrical conductivity (uS/cm): TBA Continuous | Low Flow (minimum daily) TBA Medium Electrical Flow conductivity (uS/cm): TBA Electrical conductivity (uS/cm): TBA Electrical conductivity (uS/cm): TBA pf i NOTE: This environmental authority does not authorise contaminant releases until the tables in Schedule F: Water are amended to specify the required details. The daily quantity of mine affected water released from each release point must be measured and | recorded, | Releases to water must be undertaken so as not to cause erosion of the bed and banks of the t ( | | | receiving waters, or cause a material build-up of sediment in such waters. | | a
- Page 19
Permit Environmental Authority EPML01978714 — Dysart East Coal Project F13 | Notification of release event The environmental authority holder must notify the administering authority as soon as practicable and no later than twenty-four (24) hours after commencing to release mine affected water to the receiving environment. Notification must include the submission of written advice to the administering authority of the following information: a) release commencement date/time; b) details regarding the compliance of the release with the conditions of Schedule F: Water of this environmental authority (that is, contaminant limits, natural flow, discharge volume); c) release point/s; d) release rate; e) release salinity; and f) receiving water/s including the natural flow rate. NOTE: Notification to the administering authority must be addressed to the Manager and Project Manager of the local Administering Authority via email or WaTERS notification. The environmental authority holder must notify the administering authority as soon as practicable and nominally no later than twenty-four (24) hours after cessation of a release event notified under condition F13, and within twenty-eight (28) days or another period agreed in writing with the administering authority, provide the following information in writing: a) release cessation date/time; b) natural flow rate in receiving water; c) volume of water released; d) details regarding the compliance of the release with the conditions of Schedule F: Water of this environmental authority (i.e. contaminant limits, natural flow, discharge volume); €) all in-situ water quality monitoring results; and f) any other matters pertinent to the water release event. NOTE: Successive or intermittent releases occurring within twenty-four (24) hours of the cessation of any individual release can be considered part of a single release event and do not require individual notification for the purpose of compliance with conditions F13 and F14, provided the relevant details of the release are included within the notification provided in accordance with conditions F13 and F14. (Fis Notification of release event exceedance If the release limits defined in Table F2 — Mine affected water release limits are exceeded, the holder of the environmental authority must notify the administering authority within twenty-four (24) hours of receiving the results.
- Page 20
Permit Environmental Authority EPML01978714 — Dysart East Coal Project F16 The environmental authority holder must, within twenty-eight (28) days of a release that is not | compliant with the conditions of this environmental authority, provide a report to the administering authority detailing: quality characteristic and at the monitoring frequency stated in Table F5 — Receiving waters contaminant trigger levels. \ | a) the reason for the release; j | | b) the location of the release; | | c) the total volume of the release and which (if any) part of this volume was non-compliant; | d) the total duration of the release and which (if any) part of this period was non-compliant; e) all water quality monitoring results (including all laboratory analyses); f) identification of any environmental harm as a result of the non-compliance; g) all calculations; and h) any other matters pertinent to the water release event. i | F17 Receiving environment monitoring and contaminant trigger levels | The quality of the receiving waters must be monitored at the locations specified in Table F6 — Receiving water upstream background sites and downstream monitoring points for each | Table F5 — Receiving waters contaminant trigger levels Trigger Level | TBA | Quality Characteristic Monitoring Frequency f ' | DH (pH units) Daily during the release Electrical Conductivity (uS/cm) Suspended solids (mg/L) | Suiphate (SO,”) | TBA (mg/L) | | 1 i NOTE: This environmental authority does not authorise contaminant releases until the tables in Schedule F: Water are amended to specify the required details.
- Page 21
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table F6 — Receiving water upstream background sites and downstream monitoring points Latitude Longitude Receiving waters location description Monitoring points (decimal degree, (decimal degree, GDA94) GDA94) Upstream background monitoring points Downstream monitoring points MP2(D) Downs Creek | NOTE: This environmental authority does not authorise contaminant releases until the tables in Schedule F: Water are amended to specify the required details. If quality characteristics of the receiving water at the downstream monitoring points exceed any of | the trigger levels specified in Table F5 — Receiving water contaminants trigger levels during a release the environmental authority holder must: a) compare the downstream results to the upstream results in the receiving water and where the downstream result is the same or a lower value than the upstream value for the quality characteristic then no action is to be taken; b) where the downstream results exceed the upstream results, provide the administering authority written notification within twenty-four (24) hours of becoming aware of the exceedance and then complete an investigation into the potential for environmental harm and provide a written report to the administering authority within twenty (20) business days of receiving the results, outlining: i) details of the investigation carried out; and ii) actions taken to prevent environmental harm. NOTE: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with condition F18 b) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic. All determinations of water quality and_ biological monitoring must be performed by an | appropriately qualified person. Receiving environment monitoring program (REMP) The environmental authority holder must develop and implement a Receiving Environment Monitoring Program (REMP) to monitor, identify and describe any adverse impacts to surface water environmental values, quality and flows due to the authorised mining activity. The REMP must include monitoring for a period sufficient to characterise water quality and ecological condition in order to obtain a baseline description of the receiving environment during flow conditions. Following the approval of mine affected water releases under condition F2, the REMP must monitor the effects of the mine on the receiving environment periodically (under natural flow conditions) and while mine affected water is being discharged from the site. For the purposes of the REMP, the receiving environment is the waters of Downs Creek and connected or surrounding waterways within 10km downstream of the release. The REMP should encompass any sensitive receiving waters or environmental values downstream of the authorised mining activity that will potentially be directly affected by an authorised release of mine affected water.
- Page 22
Permit Environmental Authority EPML01978714 — Dysart East Coal Project | F21 | The environmental authority holder must submit a REMP design document to the administering | | authority for approval by 12 months from the granting of the tenure. The REMP design document must describe all monitoring sites and all parameters that will be monitored as part of the REMP, the frequency with which they will be monitored, the flow conditions under which they will be monitored and all methods used to accomplish the monitoring. F22 A REMP report outlining the findings of the REMP, including all monitoring results and | interpretations must be prepared annually and made available on request to the administrating authority. All data should be maintained for a minimum of five (5) years in an appropriate electronic format. This must include an assessment of background reference water quality, the condition of downstream water quality compared against water quality objectives, and the suitability of current discharge limits to protect downstream environmental values. F23 | Water reuse | Mine affected water may be piped or trucked or transferred by some other means that does not ! contravene the Conditions of this environmental authority and deposited into artificial water storage structures, such as farm dams or tanks, or used directly at properties owned by the environmental authority holder or a third party (with the consent of the third party). A Water Management Plan must be developed by an appropriately qualified person and | implemented. | Stormwater and Water Sediment Controls F24 Water Management Plan a An Erosion and Sediment Control Plan must be developed by an appropriately qualified person and implemented for all stages of the mining activities on the site to minimise erosion and the release of sediment to receiving waters and contamination of stormwater. F26 Stormwater, other than mine affected water, is permitted to be released to waters from: a) erosion and sediment control structures that are installed and operated in accordance with the Erosion and Sediment Control Plan required by condition F25; and 7 N ao b) water management infrastructure that is installed and operated, in accordance with a Water Management Plan that complies with condition F24, for the purpose of ensuring water does | not become mine affected water. | Schedule G: Sewage treatment Condition | Condition number | The only contaminant permitted to be released to land is treated sewage effluent in compliance with the release limits stated in Table G1 — Contaminant release limits to land.
- Page 23
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Table G1 — Contaminant release limits to land The application of treated effluent to land must be carried out in a manner such that: a) vegetation is not damaged; b) there is no surface ponding of effluent; and c) there is no run-off of effluent. cm c 3 If areas irrigated with effluent are accessible to employees or the general public, prominent Signage must be provided advising that effluent is present and care should be taken to avoid consuming or otherwise coming into unprotected contact with the effluent. G | bh hr All sewage effluent released to land must be monitored at the frequency and for the parameters 7 F — ; “au Monitoring Quality Release limit Units Limit type frequency 5 Day Biochemical oxygen . demand (BOD) 20 mg/L maximum Monthly Total suspended solids 30 mg/L maximum Monthly Nitrogen 30 | molt maximum Monthly L Phosphorus 15 mg/L Maximum Monthly E-coli | 1000 Organisms/100ml | Maximum Monthly pH 6.0 - 9.0 pH units range Monthly | specified in Table G1 — Contaminant release limits to land. G oa effluent released. When circumstances prevent the irrigation or beneficial reuse of treated sewage effluent such as during or following rain events, waters must be directed to a wet weather storage or alternative measures must be taken to store/lawfully dispose of effluent | The daily volume of effluent release to land must be measured and records kept of the volumes 7 treated sewage effluent. NOTE: The supply of treated wastewater for re-use is regulated under the Water Supply (Safety and Reliability) Act 2008. Treated sewage effluent must only be supplied to another person or organisation that has a written plan detailing how the user of the treated sewage effluent will comply with their general environmental duty under section 319 of the Environmental Protection Act 1994 whilst using the _| LC151026 » EM797
- Page 24
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Schedule H: Land Condition | number Condition number Rehabilitation Land disturbed by mining must be rehabilitated in accordance with Appendix E — Rehabilitation requirements of this environmental authority. A Rehabilitation Management Plan that provides all rehabilitation completion criteria in Appendix : E - Rehabilitation requirements must be provided to the administering authority by 2 years after | the granting of the tenure. | | The administering authority must approve the Rehabilitation Management Plan required by | | condition H2. | Subsidence = a H7 H9 | administering authority a site investigation report under the Environmental Protection Act 1994, in Mining related subsidence is not authorised to occur within the riparian zone of Downs Creek. Within ten (10) business days of becoming aware, the holder of this environmental authority must report any surface subsidence to the administering authority, which results in soil movement greater than typical seasonal variations. A Subsidence Monitoring Program must be developed, documented and certified by a suitably qualified person, prior to the commencement of project stage 2. The SMP must be capable of determining the occurrence and extent of any subsidence caused by the mining activity. include: The Subsidence Monitoring Program as per condition H6 of this environmental authority must ; a) annual (as a minimum) collation of baseline ground level data; | b) the Factor of Safety (FOS) approach for each subsidence domain, which is to include the FOS operations detailed in a map that lists the boundary coordinates of each subsidence domain. c) asubsidence monitoring schedule; d) the monitoring methodology; and e) proposed mitigation measures to be undertaken if subsidence results from the mining activity. A Subsidence Monitoring Report detailing the extent to which the environmental authority holder has complied with conditions H4 to H7, which has been certified by a suitably qualified person, must be completed annually and submitted to the administering authority upon request. Contaminated Land Before applying for surrender of a mining lease, the holder must (if applicable) provide to the relation to any part of the mining lease which has been used for notifiable activities or which the holder is aware is likely to be contaminated land, and also carry out any further work that is required as a result of that report to ensure that the land is suitable for its final land use H10 Before applying for progressive rehabilitation certification for an area, the holder must (if applicable) provide to the administering authority a site investigation report under the Act, in relation to any part of the area the subject of the application which has been used for notifiable activities or which the holder is aware is likely to be contaminated land, and also carry out any further work that is required as a result of that report to ensure that the land is suitable for its final land use under condition H1 of this environmental authority. a in LC151026 » EM797
- Page 25
Permit Environmental Authority EPML01978714 — Dysart East Coal Project H11 Minimise the potential for contamination of land by hazardous contaminants. | Schedule I: Regulated Structures Condition amber Condition number Assessment of consequence category The consequence category of any structure must be assessed by a suitably qualified and experienced person in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) at the following times: a) prior to the design and construction of the structure, if it not an existing structure; or b) prior to any change in its purpose or the nature of its stored contents. A consequence assessment report and certification must be prepared for each structure assessed and the report may include a consequence assessment for more than one structure. Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635). Design and construction of a regulated structure 14 All regulated structures must be designed by, and constructed under the supervision of a suitably qualified and experienced person in accordance with the requirements of the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635). — Construction of a regulated structure is prohibited unless the holder has: a) submitted a consequence category assessment report and certification to the administering 15 authority; and b) received certification from a suitably qualified and experienced person for the design and design plan and the associated operating procedures in compliance with the relevant Condition of this authority. Certification must be provided by the suitably qualified and experienced person who oversees the I6 Preparation of the design plan in the form set out in the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635), and must be recorded in the | R egister of Regulated Structures.
- Page 26
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Regulated structures must: a) be designed and constructed in accordance with and conform to the requirements of the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635); b) be designed and constructed with due consideration given to ensuring that the design integrity would not be compromised on account of: 7 i) floodwaters from entering the regulated dam from any watercourse or drainage line; and ii) wail failure due to erosion by floodwaters arising from any watercourse or drainage line; and c) have the floor and sides of the dam designed and constructed to prevent or minimise the passage of the wetting front and any entrained contaminants through either the floor or sides of the dam during the operational life of the dam and for any period of decommissioning and rehabilitation of the dam. Certification by the suitably qualified and experienced person who supervises the construction must be submitted to the administering authority on the completion of construction of the regulated structure, and state that: - a) the ‘as constructed’ drawings and specifications meet the original intent of the design plan for that regulated structure; and b) construction of the regulated structure is in accordance with the design plan. | Operation of a regulated structure | Operation of a regulated structure, except for an existing structure, is prohibited unless: a) the holder has submitted to the administering authority: i) one paper copy and one electronic copy of the design plan and certification of the ‘design plan’ in accordance with condition 16; ii) aset of ‘as constructed’ drawings and specifications; iii) certification of those ‘as constructed drawings and specifications’ in accordance with 19 condition 18; iv) where the regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the design storage allowance (DSA) volume across the system, a copy of the certified system design plan; v) the requirements of this authority relating to the construction of the regulated structure have been met: vi) the holder has entered the details required under this authority into a Register of Regulated Structures; and | vii) there is a current operational plan for the regulated structures. Each regulated structure must be maintained and operated, for the duration of its operational life until decommissioned and rehabilitated, in a manner that is consistent with the current operational plan, and if applicable, the current design plan and associated certified ‘as constructed’ drawings. | | ! | Mandatory reporting level | my | Conditions 112 to 115 inclusive only apply to regulated structures which have not been certified as | | low consequence category for ‘failure to contain — overtopping’.
- Page 27
Permit Environmental Authority EPML01978714 — Dysart East Coal Project The Mandatory Reporting Level (the MRL) must be marked on a regulated dam in such a way that during routine inspections of that dam, it is clearly observable. The holder must, as soon as practical and within forty-eight (48) hours of becoming aware, notify the administering authority when the level of the contents of a regulated dam reaches the MRL. The holder must, immediately on becoming aware that the MRL has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated dam. The holder must record any changes to the MRL in the Register of Regulated Structures. Design storage allowance The holder must assess the performance of each regulated dam or linked containment system over the preceding November to May period based on actual observations of the available storage in each regulated dam or linked containment system taken prior to 1 July of each year. By 1 November of each year, Storage capacity must be available in each regulated dam (or network of linked containment systems with a shared DSA volume), to meet the Design Storage Allowance (DSA) volume for the dam (or network of linked containment systems). The holder must, as soon as possible and within forty-eight (48) hours of becoming aware that the regulated dam (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, notify the administering authority. The holder must, immediately on becoming aware that a regulated dam (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated dam or linked containment systems. Annual inspection report Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person. At each annual inspection, the Condition and adequacy of all components of the regulated Structure must be assessed and a Suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and include recommended actions to ensure the integrity of the regulated structure. The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635). The holder must: a) within twenty (20) business days of receipt of the annual inspection report, provide to the administering authority: 123 i) the recommendations section of the annual inspection report; ii) if applicable, any actions being taken in response to those recommendations; and b) if, following receipt of the recommendations and (if applicable) actions, the administering authority requests a full copy of the annual inspection report from the holder, provide this to the administering authority within ten (10) business days of receipt of the request. | |)
- Page 28
Permit Environmental Authority EPML01978714 — Dysart East Coal Project ] i Transfer arrangements The holder must provide a copy of any reports, documentation and certifications prepared under 124 this authority, including but not limited to any Register of Regulated Structures, consequence | assessment, design plan and other supporting documentation, to a new holder on transfer of this authority. Decommissioning and rehabilitation Dams must not be abandoned but be either: a) decommissioned and rehabilitated to achieve compliance with Appendix E - Rehabilitation requirements attached to this environmental! authority; or b) be left in-situ for a beneficial use(s) provided that: 125 i) it no longer contains contaminants that will migrate into the environment; ii) it contains water of a quality that is demonstrated to be suitable for its intended beneficial use(s); and iii) the administering authority, the holder of the environmental authority and the landholder agree in writing that the dam will be used by the landholder following the cessation of the environmentally relevant activity(ies). | Register of Regulated Structures | A Register of Regulated Structures must be established and maintained by the holder for each ; regulated dam. The holder must provisionally enter the required information in the Register of Regulated Structures when a design plan for a regulated dam is submitted to the administering authority. | The holder must make a final entry of the required information in the Register of Regulated | Structures once compliance with condition 19 has been achieved. The holder must ensure that the information contained in the Register of Regulated Structures Dams is current and complete on any given day. All entries in the Register of Regulated Structures must be approved by the chief executive officer for the holder of this authority, or their delegate, as being accurate and correct. The holder must, at the same time as providing the annual return, supply to the administering authority a copy of the records contained in the Register of Regulated Structures, in the electronic | format required by the administering authority. | End of Conditions ee
- Page 29
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Definitions Words and phrases used throughout this environmental authority are defined below. Where a definition for a term used in this environmental authority is not provided within this environmental authority, but is provided in the EP Act 1994 or subordinate legislation, the definition in the EP Act or subordinate legislation must be used. ‘acid rock drainage’ means any contaminated discharge emanating from a mining activity formed through a series of chemical and biological reactions, when geological strata is disturbed and exposed to oxygen and moisture. ‘administering authority’ is the agency that administers the environmental author provisions under the Environmental Protection Act 1994. ‘affected person’ is someone whose drinking water can potentially be impacted as a result of discharges from a dam or their life can be put at risk due to dwellings or workplaces being in the path of a dam break flood. ‘airblast overpressure’ means energy transmitted from the blast site within the atmosphere in the form of pressure waves. The maximum excess pressure in this wave, above ambient pressure is the peak airblast overpressure measured in decibels linear (dBL). ‘annual inspection report’ means an assessment prepared by a suitably qualified and experienced person containing details of the assessment against the most recent consequence assessment report and design plan (or system design plan): cy ) against recommendations contained in previous annual inspections reports; b) against recognised dam safety deficiency indicators; c) for changes in circumstances potentially leading to a change in consequence category; d) for conformance with the Conditions of this authority; e) for conformance with the ‘as constructed’ drawings; f) for the adequacy of the available storage in each regulated dam, based on an actual observation or observations taken after 31 May each year but prior to 1 November of that year, of accumulated sediment, state of the containment barrier and the level of liquids in the dam (or network of linked containment systems); and g) for evidence of conformance with the current operational plan. ‘annual exceedance probability or AEP’ the probability that at least one event in excess of a particular magnitude will occur in any given year. ‘assessed or assessment’ by a suitably qualified and experienced person in relation to a consequence assessment of a dam, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an independent audit of the assessment: a) exactly what has been assessed and the precise nature of that determination; b) the relevant legislative, regulatory and technical criteria on which the assessment has been based; c) the relevant data and facts on which the assessment has been based, the source of that material, and the efforts made to obtain all relevant data and facts; and d) the reasoning on which the assessment has been based using the relevant data and facts, and the relevant criteria. “associated works’ in relation to a dam, means: a) operations of any kind and all things constructed, erected or installed for that dam; and b) any land used for those operations.
- Page 30
Permit Environmental Authority EPML01978714 — Dysart East Coal Project ‘appropriately qualified person’ means a person who has professional qualifications, training, skills or experience relevant to the nominated subject matter and can give authoritative assessment, advice and analysis on performance relating to the subject matter using the relevant protocols, standards, methods or literature. ‘authority’ means this environmental authority EPML001978714. ‘background’, with reference to the water schedule means the average of samples taken prior to the commencement of mining from the same waterway that the current sample has been taken. ‘blasting’ means the use of explosive materials to fracture: a) rock, coal and other minerals for later recovery; or b) structural components or other items to facilitate removal from a site or for reuse. ‘certification’, ‘certifying’ or ‘certified’ by an appropriately qualified and experienced person in relation toa design plan or an annual report regarding dams/structures, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an independent audit at any time: a) exactly what is being certified and the precise nature of that certification; b) the relevant legislative, regulatory and technical criteria on which the certification has been based; c) the relevant data and facts on which the certification has been based, the source of that material, and the efforts made to obtain all relevant data and facts; d) the reasoning on which the certification has been based using the relevant data and facts, and the relevant criteria; e) drawings and specifications, construction, operation or an annual report regarding regulated structures, undertaken in accordance with the Board of Professional Engineers of Queensland Policy Certification by RPEQs (ID: 1.4 (2A)). ‘certifying’, ‘certify’ or ‘certified’ have a corresponding meaning as ‘certification’. ‘chemical’ means: a) an agricultural chemical product or veterinary chemical product within the meaning of the Agricultural and Veterinary Chemicals Code Act 1994 (Commonwealth); or b) adangerous good under the Australian Code for the Transport of Dangerous Goods by Road and Rail approved by the Australian Transport Council; or c) alead hazardous substance within the meaning of the Workplace Health and Safety Regulation 1997; d) adrug or poison in the Standard for the Uniform Scheduling of Drugs and Poisons prepared by the Australian Health Ministers’ Advisory Council and published by the Commonwealth; or e) any substance used as, or intended for use as: i) apesticide, insecticide, fungicide, herbicide, rodenticide, nematocide, miticide, fumigant or related product; or ii) asurface active agent, including, for example, soap or related detergent; or iii) a paint solvent, pigment, dye, printing ink, industrial polish, adhesive, sealant, food additive, bleach, sanitiser, disinfectant, or biocide; or iv) a fertiliser for agricultural, horticultural or garden use; or v) asubstance used for, or intended for use for mineral processing or treatment of metal, pulp and paper, textile, timber, water or wastewater; or vi) manufacture of plastic or synthetic rubber. a
- Page 31
Permit Environmental Authority EPML01978714 — Dysart East Coal Project ‘commercial place’ means a workplace used as an office or for business or commercial purposes, which is not part of the mining activity and does not include employees’ accommodation, public roads, railway infrastructure or electricity substations. ‘construction’ or ‘constructed’ in relation to a regulated structure includes building a new regulated structure and lifting or otherwise modifying an existing regulated structure, but does not include investigations and testing necessary for the purpose of preparing a design plan. ‘consequence’ in relation to a structure as defined, means the potential for environmental harm resulting from the collapse or failure of the structure to perform its primary purpose of containing, diverting or controlling flowable substances. ‘consequence category’ means a category, either low, significant or high, into which a dam is assessed as a result of the application of tables and other criteria in the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635). ‘dam’ means a land-based structure or a void that contains, diverts or controls flowable substances, and includes any substances that are thereby contained, diverted or controlled by that land-based structure or void and associated works. ‘dam crest volume’ means the volume of material (liquids and/or solids) that could be within the walls of a dam at any time when the upper level of that material is at the crest level of that dam. That is, the instantaneous maximum volume within the walls, without regard to flows entering or leaving (for example, via spillway). ‘design plan’ is a document setting out how all identified consequence scenarios are addressed in the planned design and operation of a regulated structure. ‘design storage allowance’ or ‘DSA’ means an available volume, estimated in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) published by the administering authority, must be provided in a dam as at 1 November each year in order to prevent a discharge from that dam to an annual exceedance probability (AEP) specified in that Manual. ‘designer’ for the purposes of a regulated dam, means the certifier of the design plan for the regulated dam. ‘disturbance’ of land includes: a) compacting, removing, covering, exposing or stockpiling of earth; b) removal or destruction of vegetation or topsoil or both to an extent where the land has been made susceptible to erosion; ¢) carrying out mining within a watercourse, waterway, wetland or lake; d) the submersion of areas by tailings or hazardous contaminant storage and dam/structure walls; e) temporary infrastructure, including any infrastructure (roads, tracks, bridges, culverts, dam/structures, bores, buildings, fixed machinery, hardstand areas, airstrips, helipads etc) which is to be removed after the mining activity has ceased; or f) releasing of contaminants into the soil, or underlying geological strata. However, the following areas are not included when calculating areas of ‘disturbance’: g) areas off lease (e.g. roads or tracks which provide access to the mining lease); h) areas previously disturbed which have achieved the rehabilitation outcomes; i) by agreement with the administering authority, areas previously disturbed which have not achieved the rehabilitation objective(s) due to circumstances beyond the control of the mine operator (such as climatic Conditions); j) areas under permanent infrastructure. Permanent infrastructure includes any infrastructure (roads, tracks, bridges, culverts, dam/structures, bores, buildings, fixed machinery, hardstand areas, airstrips, helipads etc) which is to be left by agreement with the landowner. k) disturbance that pre-existed the grant of the tenure. we
- Page 32
Permit Environmental Authority EPML01978714 — Dysart East Coal Project ‘EC’ means electrical conductivity. ‘effluent’ treated waste water released from sewage treatment plants. ‘emergency action plan’ means documentation forming part of the operational plan held by the holder or a nominated responsible officer, that identifies emergency Conditions that sets out procedures and actions that will be followed and taken by the dam owner and operating personnel in the event of an emergency. The actions are to minimise the risk and consequences of failure, and ensure timely warning to downstream communities and the implementation of protection measures. The plan must require dam owners to annually update contact. ‘equilibrium’: a state where ‘balance’ is achieved despite changing variables. ‘extreme storm surge’ or ‘ESS’ means a storm storage allowance determined in accordance with the criteria in the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) published by the administering authority. ‘flowable substance’ means matter or a mixture of materials which can flow under any Conditions potentially affecting that substance. Constituents of a flowable substance can include water, other liquids fluids or solids, or a mixture that includes water and any other liquids fluids or solids either in solution or suspension. ‘functionality’: the purpose that something is designed or expected to fulfil. ‘holder’ for a mining tenement, means a holder of the tenement under the Mineral Resources Act 1989, and the holder of the associated environmental authority under the Environmental Protection Act 1994. ‘hydraulic performance’ means the capacity of a regulated dam to contain or safely pass flowable substances based on the design criteria specified for the relevant consequence category in the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM6385). ‘infrastructure’ means water storage dams, levees, roads and tracks, buildings and other structures built for the purpose of the mining activity. ‘and’ in ‘Schedule H: Land’ of this document means land excluding waters and the atmosphere, that is, the term has a different meaning from the term as defined in the Environmental Protection Act 1994. For the purposes of the Acts Interpretation Act 1954, it is expressly noted that the term ‘land’ in this environmental authority relates to physica! land and not to interests in land. ‘land use’ means the selected post mining use of the land, which is planned to occur after the cessation of mining operations. ‘leachate’ means a liquid that has passed through or emerged from, or is likely to have passed through or emerged from, a material stored, processed or disposed of at the operational land which contains soluble, suspended or miscible contaminants likely to have been derived from the said material. ‘levee’ means an embankment that only provides for the containment and diversion of stormwater or flood flows from a contributing catchment, or containment and diversion of flowable materials resulting from releases from other works, during the progress of those stormwater or flood flows or those releases; and does not store any significant volume of water or flowable substances at any other times. ‘licensed place’ means the mining activities carried out at the mining tenements detailed in Table: Environmentally relevant activity and location details (page 1) of this environmental authority. ‘low consequence dam’ means any dam that is not a high or significant consequence category as assessed using the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) ‘m’ means metres. ‘mandatory reporting level’ or ‘MRL’ means a warning and reporting level determined in accordance with the criteria in the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) published by the administering authority. ‘manual’ means the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) published by the administering authority. ‘modification’ or ‘modifying’ (see definition of ‘construction’)
- Page 33
Permit Environmental Authority EPML01978714 — Dysart East Coal Project ‘mine affected water’: 1) means the following types of water: a) pit water, tailings dam water, processing plant water; b) water contaminated by a mining activity which would have been an environmentally relevant activity under Schedule 2 of the Environmental Protection Regulation 2008 if it had not formed part of the mining activity; c) rainfall runoff which has been in contact with any areas disturbed by mining activities which have not yet been rehabilitated, excluding rainfall runoff discharging through release points associated with erosion and sediment control structures that have been installed in accordance with the standards and requirements of an Erosion and Sediment Control Plan to manage such runoff, provided that this water has not been mixed with pit water, tailings dam water, processing plant water or workshop water; d) groundwater which has been in contact with any areas disturbed by mining activities which have not yet been rehabilitated: e) groundwater from the mine’s dewatering activities; f) amix of mine affected water under any of paragraphs a) — e) above and other water. 2) does not include surface water runoff which, to the extent that it has been in contact with areas disturbed by mining activities that have not yet been completely rehabilitated, has only been in contact with: a) land that has been rehabilitated to a stable landform and either capped or revegetated in accordance with the acceptance criteria set out in the environmental authority but only still awaiting maintenance and monitoring of the rehabilitation over a specified period of time to demonstrate rehabilitation success; or b) land that has partially been rehabilitated and monitoring demonstrates the relevant part of the landform with which the water has been in contact does not cause environmental harm to waters or groundwater, for example: i) areas that are been capped and have monitoring data demonstrating hazardous material adequately contained with the site; ii) evidence provided through monitoring that the relevant surface water would have met the waiter quality parameters for mine affected water release limits in this environmental authority, if those parameters had been applicable to the surface water runoff; or c) both. ‘measures’ includes any measures to prevent or minimise environmental impacts of the mining activity such as bunds, silt fences, diversion drains, capping, and containment systems. ‘NATA’ means National Association of Testing Authorities, Australia. ‘natural flow’ means the flow of water through waters caused by nature. ‘non polluting’ means having no adverse impacts upon the receiving environment. ‘operational plan’ includes: a) normal operating procedures and rules (including clear documentation and definition of process inputs in the DSA allowance); and b) contingency and emergency action plans including operating procedures designed to avoid and/or minimise environmental impacts including threats to human life resulting from any overtopping or loss of structural integrity of the regulated structure. ‘peak particle velocity (ppv)’ means a measure of ground vibration magnitude which is the maximum rate of change of ground displacement with time, usually measured in millimetres/second (mm/s).
- Page 34
Permit Environmental Authority EPML01978714 — Dysart East Coal Project ‘project stage 1’ means project activities carried out under this environmental authority prior to commencement of significant ground disturbance including: a) pre-construction surveying and technical assessment including geotechnical, establishment of site security arrangements (including signs, fences, safety barriers, and temporary security personnel facilities) and maintenance of existing roads and tracks; b) installation of facilities for the purpose of environmental monitoring compliance; and c) other works limited to the existing site facilities and access roads. ‘project stage 2’ means project activities under this environmental authority, other than activities carried out under project stage 1, leading to the production of coal including: a) removal of existing structures, site clearance; b) construction of access roads, potable water treatment and sewage treatment plants, new power plants, mine administrative buildings, water storage infrastructure and hardstand areas; c) removal and stockpiling of overburden and excavation of the drift for underground mining; and d) commencement of dewatering operations. ‘protected area’ means — a) aprotected area under the Nature Conservation Act 1992; or b) amarine park under the Marine Parks Act 1992; or c) aWorld Heritage Area. ‘receiving environment’ in relation to an activity that causes or may cause environmental harm, means the part of the environment to which the harm is, or may be, caused. The receiving environment includes (but is not limited to): a) awatercourse; b) groundwater; and c) anarea of land that is not specified in Appendix A: Dysart East Coal Project authorised surface disturbance footprint of this environmental authority. ‘receiving waters’ means the waters into which this environmental authority authorises releases of mine affected water. ‘Register of Regulated Structures’ includes: a) date of entry in the register; b) name of the dam, its purpose and intended/actual contents; c) the consequence category of the dam as assessed using the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635); d) dates, names, and reference for the design plan plus dates, names, and reference numbers of all document(s) lodged as part of a design plan for the dam; e) name and qualifications of the suitably qualified and experienced person who certified the design plan and ‘as constructed’ drawings; f) for the regulated dam, other than in relation to any levees — i) the dimensions (metres) and surface area (hectares) of the dam measured at the footprint of the dam; ii) coordinates (latitude and longitude in GDA94) within five metres at any point from the outside of the dam including its storage area iii) dam crest volume (megalitres); Q
- Page 35
Permit Environmental Authority EPML01978714 — Dysart East Coal Project iv) spillway crest level (metres AHD). v) maximum operating level (metres AHD); vi) storage rating table of stored volume versus level (metres AHD); vii) design storage allowance (megalitres) and associated level of the dam (metres AHD); viii) mandatory reporting level (metres AHD); g) the design plan title and reference relevant to the dam; h) the date construction was certified as compliant with the design plan; i) the name and details of the suitably qualified and experienced person who certified that the constructed dam was compliant with the design plan: j) details of the composition and construction of any liner; k) the system for the detection of any leakage through the floor and sides of the dam; 1) dates when the regulated dam underwent an annual inspection for structural and operational adequacy, and to ascertain the available storage volume for 1 November of any year; m) dates when recommendations and actions arising from the annual inspection were provided to the administering authority; and n) dam water quality as obtained from any monitoring required under this authority as at 1 November of each year. ‘regulated dam’ means any dam in the significant or high consequence category as assessed using the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) published by the administering authority. ‘regulated structure’ includes land-based containment structures, levees, bunds and voids, but not a tank or container designed and constructed to an Australian Standard that deals with strength and structural integrity. ‘rehabilitation’ the process of reshaping and revegetating land to restore it to a stable landform ‘release event’ means a surface water discharge from mine affected water storages or contaminated areas on the licensed place. ‘riparian zone’ means a vegetation ecosystem that includes groundwater-dependent vegetation growing on, or immediately adjacent to, the banks of a lagoon or watercourse. ‘RL’ means reduced level, relative to mean sea level as distinct from depths to water. ‘representative’ means a sample set which covers the variance in monitoring or other data either due to natural changes or operational phases of the mining activities. ‘saline drainage’ The movement of waters, contaminated with salts, as a result of the mining activity. ‘sensitive place’ means: a) adwelling, residential allotment, mobile home or caravan park, residential marina or other residential premises; or b) amotel, hotel or hostel; or c) an educational institution; or d) amedical centre or hospital; or e) a protected area under the Nature Conservation Act 1992, the Marine Parks Act 1992 or a World Heritage Area; or f) a public park or gardens. NOTE: The definition of ‘sensitive place’ and ‘commercial place’ is based on Schedule 1 of the Environmental Protection Policy (Noise) 2008. That is, a sensitive place is inside or outside on a dwelling, library & educational
- Page 36
Permit Environmental Authority EPML01978714 — Dysart East Coal Project institution, childcare or kindergarten, school or playground, hospital, surgery or other medical institution, commercial & retail activity, protected area or an area identified under a conservation plan under Nature Conservation Act 1992 as a critical habitat or an area of major interest, marine park under Marine Parks Act 2004, park or garden that is outside of the mining lease and open to the public for the use other than for sport or organised entertainment. A commercial place is inside or outside a commercial or retail activity. A mining camp (i.e., accommodation and ancillary facilities for mine employees or contractors or both, associated with the mine the subject of the environmental authority) is not a sensitive place for that mine or mining project, whether or not the mining camp is located within a mining tenement that is part of the mining project the subject of the environmental authority. For example, the mining camp might be located on neighbouring land owned or leased by the same company as one of the holders of the environmental authority for the mining project, or a related company. Accommodation for mine employees or contractors is a sensitive place if the land is held by a mining company or related company, and if occupation is restricted to the employees, contractors and their families for the particular mine or mines which are held by the same company or a related company. For example, a township (occupied by the mine employees, contractors and their families for multiple mines that are held by different companies) would be a sensitive place, even if part or all of the township is constructed on land owned by one or more of the companies. ‘structure’ means dam or levee. ‘spillway’ means a weir, channel, conduit, tunnel, gate or other structure designed to permit discharges form the dam, normally under flood Conditions or in anticipation of flood Conditions. ‘suitably qualified and experienced person’ in relation to regulated structures means a person who is a Registered Professional Engineer of Queensland (RPEQ) under the provisions of the Professional Engineers Act 2002, and has demonstrated competency and relevant experience: a) for regulated dams, an RPEQ who is a civil engineer with the required qualifications in dam safety and dam design. b) for regulated levees, an RPEQ who is a civil engineer with the required qualifications in the design of flood protection embankments. NOTE: It is permissible that a suitably qualified and experienced person obtain subsidiary certification from an RPEQ who has demonstrated competence and relevant experience in either geomechanics, hydraulic design or engineering hydrology. ‘system design plan’ means a plan that manages an integrated containment system that shares the required DSA and/or ESS volume across the integrated containment system. ‘the Act’ means the Environmental Protection Act 1994. ‘uS/cm’ means micro siemens per centimetre. ‘watercourse’ has the meaning in Schedule 4 of the Environmental Protection Act 1994 and means a river, creek or stream in which water flows permanently or intermittently— a) in anatural channel, whether artificially improved or not; or b) in an artificial channel that has changed the course of the watercourse. Watercourse includes the bed and banks and any other element of a river, creek or stream confining or containing water. ‘waters’ includes all or any part of a river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined water in natural or artificial watercourses, bed and banks of a watercourse, dams, non-tidal or tidal waters (including the sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater. ‘water year’ means the 12-month period from 4 July to 30 June. ‘water quality’ means the chemical, physical and biological Condition of water.
- Page 37
Permit Environmental Authority EPML01978714 — Dysart East Coal Project ‘waters’ includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea), storm water channel, storm water drain, and groundwater and any part thereof. ‘wet season’ means the time of year, covering one or more months, when most of the average annual rainfall in a region occurs. For the purpose of DSA determination this time of year is deemed to extend from 1 November in one year to 31 May in the following year inclusive. End of Definitions
- Page 38
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Appendix A — Dysart East Coal Project authorised surface disturbance footprint PALA —————— Dosh: Greek wtesmuent 1 Tabane of Dees #100 33 aio Gah 13 Prgeenur: WGA ZemeSS Mognied 1700 AE? Fiona — Ener Chant Sarpneaa nee ip ROR. SARE Care A AINE MW lp ee PAO Aaa Le eb CaN aM Nee tae Paenedor Aamiatey 2 4 Tae Somme Cee 212 Dy a a seamen ties comet a A ibe as UTE Out st Fagen tb ITN CAO FTL POEM SAR RCNA aty li UA PRIN Ce) ee lO AGAR RCN panNely Manna LHEDy D aga ar ny aeRO ey CRA APACS MAORI ZITO TIPO RH PSH Fal NS BR EERO I Pa Cy RN SON a a Co PRA RP Ty hy em 2820 3 a OE ara Ar TN a ENN Mpc ry me OH aL GENERAL SITE LAYOUT BENGAL COAL DYSART EAST COAL MINE ON 1:1000 AEP FLOOD EXTENT
- Page 39
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Appendix B — Dysart East Coal Project authorised underground (bord and pillar) disturbance footprint fre _ P ee J ae Acad ae “ _ py oe Sa if ae as A CE eating coe cotizice przcaser, 1 foe eon Coeemikin! Pie Layted TSR Senecio: MOA ZINES Sgr nSeed Pa TOA AE bazeb Leonia perioas ellpiahethastatianphidldaheimsiateielghteeadiondicel LeMGr tee Ge eT Te Te eT Lcaphelinddinidalearalabarelincmibintaasieteldd chokuttee Cie ry herbie bhscenvhieenumnabentrwisuhs: bekeneturuiockicmtde rote Oe rT MOR Z RRA, Sot Che Kifeirat El stm beni shaiaaih nheenshiderraens sahienthiints sseinkamibenet tater thie rig tiagtaie Tenner wren portal wy Dy He Dap A ose Fee 3 SG TA a? Ape Me nO? ‘op RN Or AMES fate SS, BENGAL COAL PTY LTD ALL SEAMS DYSART EAST COAL MINE CONCEPTUAL PANEL LAYOUT
- Page 40
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Appendix C — Groundwater bore monitoring locations Mat ee ae Cot amt ot —EE Re wasteres Srouncwoter Boe Maintng Lawse ApDdEMReR IMLATANO?? BD ste Gruntanney Using Boe tupaniea Bure of tanec: Drainage Ferree ce an vated erp are rt OCA Raa Sh @ Conmonandi o) Anata [oanecene Aumiabi 1) @ Tea thus of Secreta 247 ‘Beng kia hcron? Canperracn tint ta acarn aga ie naty mana ona RE i amy Ni ate ao pe ee ralienity sxxespceiscn reat far oy peotuatey parpaan ent Santee 28 miguarmebiy wnt feckating anima webcion, fas in wagtpuasce: at 27 open deena FOLENS lreiainy Wer! er Onewtaenneri Urey) amt cranks watch aot Mar py Mane AROeAT: Maa i prceart Ra aC CAR ‘Eh bile te tomo Mine a aot OMENS ay anyact to atone apeNK Ror ames metas WITS pir ialragritanpeeterrtrdturen ceebetrire ~ REGISTERED GROUNDWATER BENGALCoAL DYSART EAST COAL MINE PROJECT BORES WITHIN THE PTY LTD ENVIRONMENTAL ASSESSMENT REPORT 1m DRAWDOWN CONTOUR
- Page 41
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Appendix D — Authorised release points and surface water monitoring points Figure TBA
- Page 42
uonoe}o1g ebeyJ0}H pue yUaWUOIIAUZ jo JUsWYedaq BD Z6LINA * 9ZOLSLOT + €9 30 Zp 62d [~~ Wemplios Bupnyjod-uou sjqeys & O) pejeyjqeye. pue No paukap oqo) SabelgjsiajemAuIG ~ a — ‘(uossad paylyenb Ajayeudoidde ue Aq pauliwe}ep aq o}) pesinba se ya] pue pasijiqeys aq 0} sabeloys Ja}eM ULS|D wwojpuR| 8/gelS saBeJo}s Ja}eA, = ~(ueig uoWaBeuey LOREWIGeyey oy Ul | ee paynuap! se) seagoalgo Ayyenb sayem Bumjes pue suopefigssaul ainjny Oo} Joolgns ajqeureysns 8q 0] PeULLA}ap Se JO *G°g 0} Gg jo eBues Yd pue wWd/Sn OZZ JO WUNWIxeU AAgonpucs sJayowesed fEOlOS|S JO SIU} JUBUILUBJUOD SAY youn JayeM aoeyNns Aq pepaye susjem Hulaleoes aunsuz Jeolayo pue [RasAug Ayyenb sayepn as TO guiseqgonuos | t—=—<“—=*~s~sSSOS—C—SsSSSSCS —_ |_ JUAWIPSS JO SBAIE O|GE}S OJU! J9}BM JOJIP 0} SU/BIP UOISJOAIP PUB SyUBQ JNOWUD JO asf) ebeulep Jajem aoeUNS OO “UR| juUawabeURW\y oo UONEWIGeYey Ou) Jad Se ‘soSUa}OeJEYO ULOJPUL| JEIILUIS HIGIYXS JEL) S'S BOUBIOJOI Ul JEU) UeU] J9}eeI6 OU S12 SoINB pue sili Uolsole yo BdUELINIDO yo Aouanhbsy pue suo|sueWig “(Ln) wun los JueUjWopadd ayy UO paseg (UOISOla Jeays) JA/eU/SeUUO} OL> SI SSO] |]os |enUUe abeseay ‘(uossed peyijenb Ajayeudoidde ue Aq PaUIWLUE}ep eq O}) Ayiqeys sdojs aunsue 0} parjdde ueeq evxey seunseauw uoyebyiw uoisoly — a “sje pjey Buynp alqeuleysns se pouyep se Jo wwuggg Jo ydep wosdoy t WNUWIUIW & O} paddeo si aunyonyseyju| Aynqeyg wuoypuey uonejehsn ‘paaaiuoe used sey Ue] JUoWaBeUeW UOHe}IGeYyoy Buy Ul PayjUsp! oq uevedy so uonisodwoo 0} sanisuap pue Alisseaip saloods uj yey} UOssed paylyenb Ajayeudosdde ue Aq uonesyed : ee UR |g JUBWABEUEYY UOREIGeYeY OU a Ul PaUIPNO oq 0} BLA} UOREIqeYsJ Gy} Jo sjUawWesINbal UBIsep oy) Sjoows UBIsap WoJpUeT SaIpNj}s [BOUYIa}Oa5) en Big uouebeuey uonemigeyaueu | Ul PSUI|NO aq O} BLa}WO UOFeWIGeYs. aj Jo s}UaLWadinbe uB\sep ey) s}ealW ubisep Wwiojpue’y ee SS pAEPUEIS UPITENSNY pue sauifepind yUeAa|el WIM aouepsOode UI AjjeseUAab payoaie useq eAcy esau) ‘SUBIS (aldyours WOU Bulusem pue saouay Ajeyes ‘spung epnjou! sounsealu UOeB IW YSL SJBYAA “payuawie|duyl Ayiqeys wuojpuey BuILIEISNs-s8¢ “p ‘Spo. ty UMOPART a ugeq aaey saunseow UoHebIW SU pue peyejdluce usaq sey weussesse sd __ yo quauissasse ayes aides‘ ‘ddHO ‘seBe101¢ t ~ LT Gaproupuey ungny uy Aq 6 d . Joye ‘suipying pauinbad Jou) aunjonyseayul aANjNy B|qeseSeJ0} OU} URN|OA-UON “Z ‘spueyspley ‘payeyiqeye. pue pauolssiwmwoesap usaq sey ainjonjseyul jo Buluolsstwwosep | U! Pue Mou ‘sjeW|Ue pue SJeS *} ‘Sspeoy Sepnjoul) ayy Jey) WOdey LOHeWIGeYyoY O}S OLp Ul uosiad poyjjenb Aiqeqins & Aq uonesyed ajyeudoiddy SUBLUNY JO} BJES S| SUS Agsyes wa}-6u07 SINJONASEU *} seanosiqo jeos B1Ea}9 uoyaj|dwioy S1O}E9iPU| uleWOg Sul uopeyiqeyey | uoReHiqeyey sjuswesINbes UOHeWIGQeysy — 4 xIpueddy Slog [20D sey WeEshd — HLZEZELOINda Aouny jeyuewuoAUy yWuued
- Page 43
Uu01}990}014 abeyey pue JUSWUOJIAUZ JO JusWpeEdag Z6LING * 9ZOLSLOT + £9 490 ey e6eY ‘ue|q JUsWweBeueyy UOHEWIGeusy SU} Ul PayUsp! se ‘uoTIPUCD Buygnijod-Lou ajgejs e 0} payey|iqeual 3q 0} sweg JayeAA OUI ‘(uosued payiyenb Ajayeudoudde IQe}S 8q 0} SOHeJO}S Je}eM UEDID ue Aq pauluuajep aq 0}) pazinbeu se ye] pue pes) “AONE [e|UaWUOLAUD sI4] JO s}UaWaINbsL uoneyiqeyas JUBAG/A JOUjO [1 YM JUeI|dWOd s! sunjonys payejnBes au) pue sunjonas pajeinBa, au) Aq PESIWIUIW S| LUBY je}UaWUOIAUS jeu) pue AjWoU;Ne je]USLUUOJIAUS SI4) YA aoueldwoo ul aq 0} uosied paylyenb Ajeyeudosdde ue Aq paynieo ase seunjon.j}s peyejnBes juaueWed-uoU ay] “AOUINE [e}UBWUOIIAUA SI4) Jo sjuaLUaJINbeI uojelyiqeye: JUBAG|O4 JOU}O {JB YM JUBLJGWOD S| ainjon.ys payeinBas auy pue aunjonys payeinBas ayy Aq pasiuyullu s} wey je}UeWUOJIAUe yeu] pue AjJoujne jej]USWUOAUe SIL) YM aoUe||dWO0O Ul 9q 0} Uosied paysenb Ajayeudosdde ue fq PayMad Sle seunjonijs payejnBai ayy Z “wuuoypue} Bululw sod ayy Aq pajoeduui Ajeane6Bau jou si Aijenb sayem S0epNs Jey} uosJed payienb Ajqeyins e Aq uojeoynsie9 ‘(ue}q Juawabeuey Uogey|IGeyey ou) UI Peynuapl se) sanjaefqo AyWenb seyem Bunjes pue suojebyseau! anny 0} yoolqns ajqeureysns 8q 0} paullWajap se JO ‘g’g 0} G'9 JO ABueI Yd pue Wo/snl gz jo wnwixew AIARONpuos [BOH}O9/9 JO SHU] JUBUIWE}UOS SAY Jound Ja}eM eoeyNs Aq pajaye suajem 5uateoeu aunsuy ‘(ue|q JusWabeuUeW LUOReiqeyay ou UT PeyHUap! Se) (s)e}Is soudJaj9u payeubisap 0} ajqeseduico si Aypenb sayem SoepNs Jey YOday uoHeW|!Qeyay ay) Ul soUSPIAy = (6) “SONIC [EJUBWUOIAUS [Je 0} LEY [e}UBWUOJIAUd JO ys a/qI6\\Bau sasod Ayyenb Jayem SOBLNS Jey} HOday UOHEWIGeyay au) Ul soUSpPIAY YO ‘(uz|q USWaBeUReY| LONE Iqeyoy au} Ul peynuap! se) sanjea auyepin6 payloads YIM pal|duwos sey Buoyuow Ajenb Jajzem SOBUNS JEU) HOday UOHeYIGeYysy ay} Ul sOUapPIAg A6Ba}e9S Buluolssiwuwooeg ays 5U} Ul PS}BUILUOU Se peuolssiuWOoap AjayeLdoudde s) puezey uonntjod © S}B919 O} SNURUOS PjNod yey} sainjonjseyul [Je yey) Loday UOHEWIGeYysy Su} Ul BOUapIAg “UB, JUaWeBeUeY] UOReWIGeYyey ay} UI payjuapi se uuopue] a|qeIg “Awoupne [e}uewuUdJIAUS SU] YA soueplooDR Ul PSUOISS|wWWOSSp 2q | [IM Seunjonujs payejnBes jusueWWAad-LOU |I\¥ ‘elay9 UBisap paacidde JOS |IIM Soinjonys pajejnBias jugueuued ji swa}shs JO}JeM BoeNS jeWa]xo O}U! SMOILOAO OU YIM ‘alls UO paUlejUuod ase saGesojs Jayem UWOJpUeT jeul4 SJO}EM SOeUNS Bulajaoad Jo BuopUoyy S/ELO}EW 91XO} JOYJO pue sjejew Aaeay jo Aigeyiene pue 0} aunsodxg (Jepjoypuey ainyny Aq peuinbas JOU 3J8UM) pesAowe SINJONSEIJU! Peoy BLU939 UoKejdwog yuUed peloid |209 Jsey Heskq — 7178/60 1IWda Auouny jeyuauiuodAUy SJO}L9Ipu| SeBeiojs Ja}eAA ays UO PSUIE}LIOD Ja}EM PayN|iog pebeuew Ajayenbape sjeuajew snopyezey S90iNOs UONN|jod Jenuajod jo jeaoway seanoe{qo uoHeTIGeYyoy Bulureysns-j9g “py SIGEIS "€ Bunnyjod-uoy “Zz ayes ‘Lb Ayayeg wW8}-6u07 leog uoHey)Iqeyoy (a1dyoOIS WOU ‘seady uMopAe 7] “ddHo ‘soBei0jg Jaye ‘sBuipjing ‘spue]spiey ‘speoy sapnjou) SININYSEIYU] * | uleWOg aul
- Page 44
Wonsa}01g e6e}J9}H pue yUSWUOJAUZ Jo JUsUpedsg ZBLINA + QZOLSLOT + €S JO ve O62d "pedse ‘ado|s ‘10S SU} 0} payins seideds jo ole Aysuap pues a UdHeIabeA Oyj Jeu) BOUAPIAG “UOJ PUE] PE}JeyIGeYas Suy JO yeu) se Swu|Ga, asy pue ubua] sdojs ‘adoys Buipnjou! sonsuajoeseyp jesisAyd pue /edILWaYo Blues 84) SAeY ysnu (s)eys Sousajes siqeaidde ey, -(uej juUsweBeuey] LONeN|Iqeyay ou} ul passoppe oq 0}) ays SoUaJajJal a[qesedWod Su) U! PS}Ig!UXs JeLY JO %OTL UEYY Ja}e9I6 UO|SOJe yIqIyXe JOU saop saniagoe Bululw ayy Aq pequnsip pue| |e ely UOSsied paylenb A\qeyins e Aq uojeoyeD 0} JOGO LONBISHe; uoneyebe/\ $80] ,|!0S, JO SA}EY “*Buluonouny pur aoed ul ole “O18 sounjonys doip posseuibuea ‘inowwe MOY JOyEM [01] UCD aoeuns ‘suru j|euUeYS ‘syueg INo}USS payinbed Aue yeu} yoda, uoje}|Iqeual oy) UI soUepIAg 0} ainjonjs pesseulbuy —— as a ‘hyudei6odo} Jeunyeu 0} ajqeonoesd a|QeuoseRas Se OSO[O SE 0} pauses aq JIM sdunp pue sjid uey) s8ujO Sealy “UR|q jUsWaBeUeY UOHEYIGeYsY 24) Ul paul_No ul paulNo suojeoyjoeds au) 0} peublsep ueeq aney sadojs peyey|Iqeyas au) Jeu} Oded uoAeWIGeYyed Buy Ul eDUEPIAR “sayei UOISOIa ajeudosdde sanaiyoe uBisep Wojpue] “UE|q JUsWeBeUe LOREWIGeYsy Su} UI PauIyNO suoHeoylosds yj 0} pauBisap uaaq aney sedojs payey|iqeyad ayy yey} Hodey UONEWIGeysy SY} UI BOUaPIAZ yyBus] pue ejue sdojs ‘uonIpe ys9}e| JO (ZL0z Aremiqey ‘uewWeaod ueyesjsny) eyesny Uf SQJ0g Ja}BAA JO] SjUeUTELINDaY UORONASUOD WNUILIYY, SU} YW eoUepIOIIE Ul PSyeHiqeyed useq eAey Seloq BuoyuOW |/e yey UOSIed payljenb Ajeyeudosdde ue Aq UOHeDYITED “payeyiqeyas useq saey soiog Buuo}uow |Iy "210g Ja}2M 2 0} PeLOAuod JO payeyiqeues ugeq eaey uexeyepun sei0q Buropwuow Jeyempunoi6 pue $9]OY ||UP Uo eJo\dxe Jo UOISIsAUO0D Jo UOHeWIqeyeYy ‘000Z JOY 42}2/Y\ Ou) JO sJUSWAIINbaL ayy UW jURI|GLUOD ae a10q 18}2M 0} Pay@Auod $9|0Y ||Up UOHB10[dxe UeIseye-OU |]/2 yeu) UOSJed pay!}eENb Ajayeudoudde ue Aq uoNeOy IED s9[oy ee “B10G JB}EM EB O} $9J0q BuuoyuoW aiidyoo PeHSAuod JO payeyiiqeyas sayempunol6 pue Bulureysns-jes “b Sela io useaq saeYy Lexeyepun S9joy ||Up uonesojdxe “ . ‘ddH9 ‘sebel01g “000Z IOV 1812 Su) JO sjuaWaLINbes Sy) YM JUeI|dUCD ale a10g JeyeMm 0} psHBAUCO s9joy ||Up uonesojdxe JO UOISJaAUCD SIGE}S “€ yayepa ‘SOuIpIN S@[oy ||UP UOReIO|dxe UeIseye-UOU |B JU) UOSIed payyjenb Ajoyeudoidde ue Aq uonesynied UE|SOPe-UOU II Jo uoneWiqeyay Bugnyod-uoy “Z Pues — ‘sounjonyAsS payeinBey 40) mojeg peuijno sjuaweuinbei eu} ui gouepi0ooe 2 a SyeS ‘Lb ‘speoy sepnjoul) __Ul PEFeYeyeu Og || | UJEWOG UI PayONySUCD eq O} seunjonas payeinBes Auy :3,LON) ayes wia}-6U07 SuNjON.NSesjuy “| saanosiqo uoney|iqeyey 1209 uoneniqeyey BHa}UD uoHejduie5 $10}€2/Pu] urewiog sul KG — pLZ8Z6LOIWda Awouiny |e} USWUOJIAUZ WUE
- Page 45
U0NI9}01g ebeyJay pue JUSWUOIIAU JO JUsUedag Z6ZWA ° 9Z0LSL01 + €¢ JO Sp aBeg OSL, eee “‘sassaooid [e0|6oj008 JuaJa4yIp ul paajoaul sdnouB Joyed|pul saloads ayesqaysAu! euonoUny jo aBuer PeOlg B 10} SBAIEJUasaidal Jo soUaSeid e S| aJay} UOSIad payyenb Ajqeyins e Aq uoyeoynie "SOUS SOUSJEJaJ B]qesedwos YIM UOReW!IGeYal Jo BaJe YORS JO) ajqesedwuod de siojeolpul ay} Jeu) UOsJad peyijenb Ajgeyns e Aq uoyeoymag Juaseid ae syusuinu OSU PUB Ose aJeNbepy ‘s}UdIqUIASOJOIW Jao JO/pue SEZIYUOIOIW “IBAB] JOY & JO souaseid au Aq psouapiaa se Buuunoo0 aue sasssoold BujoAoe) pue uonejnwnooe qUdiNN ‘(ueiq jueWeBeuRW UOReW!qeYysy ou UI paynUep! oq O}) ELeIHO UOHeHqeYya ays By) UI PayEINdaS QMVd PUe sYydep josdo} au) Jo UOREDYRIED °% Q> SI (qS3y) ebejusoeg wnipog aBueyoxg |los “GB puke Gg UsamMjaq s! Hd |I0S “W/SP 90> SI }UE}UOD AyUNeS jos ‘yuesaid ave sjusujnu “O19|WU PUB OLOeW ajenbapy “s}UCIqUUASOJOIW JOJO JO/pue aeZIYLOOAW ‘J@AB} JONI] C JO aouasaid ayy Ag paouapine se Bulunovo ale sassaoold Burjokoe pue uoReinwnooe JUSLINY ue|q jJuUswebeuey uoVeWiqeyay Su} UI passaippe aq O| “seeve UOHeWIGeys. OLY UL Jew Bulaq ase ‘eWa}U0 UOREWIGeYed aIS Su) Ul payeindys sejsedoud jeojweyo josdo} euy yey) Hodey UOREWIqeYyay ayy UI UOROYIWE> ‘OYS BOUSIOJOI JUBAI|9J 94) YM B|GeJedWOD SI WNIPew BuIMmol6 $0 dap ‘snuuny ‘28}q1] Jeo “90BUINS }19ds/[i0s S4y JO UOISos9 Bui u! Bugsisse si Jayyy $e) JO aouasad ay} pue Buunoso s| BuyjoAo JUSUINU Jey) Woday uoNeyiqeyay ouy ur! eouspIAg “adojs umop yjHuay U) WO) < JO Bare ul zW0Z< SedepNs aleq ON ‘(juaseld ale 4JBAOS JO SBINJES} JOYJO JO SHO) ‘syDO4 J! %Og 10) JUasaud S| J9A09 aAHe}aBen %Q/ JO WNUWIUIVY UE|d JUswabeueyy VOReyIGeyey oY) Ul passaippe aq O| “su0}OR| Jay;O pue ayeujo BaD UoHejdwoy ‘syiuul) Aedoid Jed|ways pue jeolshyg ‘Ydaq elpeyy Yor -ydap jiosdo “AUANOe 9}21GaLJ9AU] dayjeyy 2uebiC SOUS 90uUdIEjOI UUM a]qeiedwioo ase suajauesed Buimoyjo} ayy (se}eigeyeAu! ‘ssewolg JE!qouo|w ‘BuljoAo JuaLyNu ‘Ba) samadoid jeaBojoig ‘(COMVWd) Ajoedeo Jayem ayqeyreae jueld ‘losdo} yo dep *B'a) semedoig jeotshud suajoweed J€d|WweyYo pue jeoiskyg uonejyabon pesodoid 34} yoddns d]yOud jos au) ul pue Osco} 30 (sjuswala 90k} ‘sjusujnu ‘Ayuyes ‘yd “B-9) sanjedoid Jeolwuayd 9SN pue| padisap au} yoddns sajyedoud jiog wunipew Buimoi6 pue yjdap ‘snuuny ‘ay ee 48A09 abel04 UOISOJS SSIWIUIW seanoa{qo uoHeyHIqeyoy $10}29!pUu| jelold [BOD Jsey Weskq — 7178/60 Wd a Awouny jejuowuoAUy }ULI8d Buruleysns-sas “7 SIqe}s "€ Bunnjod-uoy ‘Zz ayes "| Ayayes wa}-6u07 1205 uoneyiqeyay (al!d49015 WON ‘seal uMOpAe] ‘ddH9O ‘sabeicjs Jayeny ‘s6ulpying ‘spue]spiey ‘speoy sepnjoul) SINJONSeYU] *L uleWog aul
- Page 46
sesseood eolGojo0e JUSJIYIP UL PAA[OAU! SdnoJ6 sOyed1IPU! Sa|Deds 9}esqeHOAU! [BUONSuNY JO aBues peoig @ 10) Soaaneyuasaidas Jo ouesad e S| aay} UOSJed payyenb Ajayeydoudde ue Aq uoneoyneD SOUS SOUdIBJOI B]qesedWOd YYW LONe}P|IGQeyad JO ease yoera JOJ ajqesedwioo ase sioyedIpul ay} yeu) UdSJed payljenb Ajayeudoidde ue Aq uoyeayiyeg ‘ays Buuiajue 0} sod jeuayew eayonposdai pue pees juejd pasejep JO 984 e1e UOREW!IGQeYa4 Jo} pasn yuewdinbe pue jueld ‘Asauiyoe wy je yey} Buryeojpul spsooay “ue|g juUsWwebeuRYy UOHeW|IGeyay au} Ul pesseuppe oq oO! “Asn pue| HululLu jsod au Jo aajewuasaldal ale YOIYM SA}IS BOUdIEJe1 peyeublsap Oj ajqesedwuiod ale sesseo0id BuljoAd U9IINN Fo ns Sn PUB] BUILIW4SOd Alp Jo SAREyUASEIdOJ eue YOIYM “(URI juswebeueyy uoHeIGeyay ou Jed se) Se}!s BoUaJEJOI payeuBisep ye sayed 0} ajqezedwioo ale sease payeyiqeyoa. ayy jo Ayisuap 9jNq pue Ayyiqe}s aebes66e ‘uojejyul Jaye AA “BUIS BOUSIAJO1 OU] UM JUS}SISUCD Jauuew & Ul BujUOHOUNY $! ays e Je UOHEW]GeYyos ayy yey} UE|Y JUsWoHeUeW LOHEWIGeYOY eyal Jo Bose yors JO) saynuap! BuyoyuolW UOHEWIGeYysy e119} UORajdwoD yaloid j20D yseQ Weshq — 71/8Z6L0 IWda HUNSd ‘SJUSLINU [log ‘sy Ayedoid jeoiwayo pue jeslsAud “Yydaq BIPay| YyAoss) ‘uydap jlosdo |. ‘AANO @2IGaYOAU] yayey, a1uebio SOYS SOUSIOJSI UM a[qesedwoo ase suajeauesed Buimoyjoy ey "ous ay} Buiaes| pue Buleyue 0} JoUd uossed payyyenb Ajeyedosdde ue Aq paas ued pasejoap jo say ale Aay) ainsue 0} payoedsul udeaq dARY UOReIGeye. JO, pasn yuewdinbs pue jueyd ‘Aueuiyoew |!€ yeU} Spsovey “abueyD jeuoseas pue ‘soiweudp uojeyobej, ‘Ay Xajdwioo yeyqe}H UaWUyINIVG! SelIseds ‘BuryjoAo JUaLINN ‘Ayoeded UONes Yul “AUIIGEIS LOS ‘Bulpnpoul ‘sadeaspue| Q0UsJE4aJ YIM PasedWoo SUS Ou} JO UOHE}|IGQeYyss BUY} JO} SPUua.} SARISOd YSI|Ge}Sa O} Buvo}uow UONeyIqeyeY “snuoydsoyd pue uaBowylu se04 ‘syUaUyNU [10S si0yed|pu| Ayuouyny jejuswuUOsIAUZ UoNoa}01g e6eJeH pue yUsWUOJIAUZ Jo JUSLURdEGg LGLING + 9ZOLSLOT « €S $0 9p Bed yeyqey Jo uonejeBan jeunyeu Bululeysns-}jas Yysiqeisy BuUIUIe]SNS-}ag "Pv algels *€ Burynjod-uoy *Z Byes “| Ayayes wa}-6u07 1209 uoneyqeyay aSN pue| pawisep ou} yoddns seiiedoid jl0g seajosiqo uoneyIqeyuoy (ajidyools WO ‘seany uMopAe ‘ddHO ‘seBes0}¢ Joven ‘sBuipying ‘spue}spley ‘speoy Sepnjoul) BINJONSeU| * ulEWwOg sul “] L
- Page 47
U0N99}01g e6e}113}4 pue JUSWUOAUZ JO JUsWIeEdag Z6LINZ ¢ 9ZOLSLO1 + €9 JO Zp beg (ue}q juswebeueyy LOWE IGeYay Su} Ul passeppe aq o})ayIs S0USJJAJ JUBAS|aJ YORE JO} payejnojeo yeu; ue a}e1 Bunjoo}s JayJ8q 10 0} yenbs ue Hululeysns ase asn pug) Buruiw sod e se Buizesb @JeO JOY payeulwou seale a}yeolpul sje} Bupyoojs apjeg “e0ed ur sjuswuse6e/saiBayens jusweBeuew aunjny pue asn puey aunyny Joy Aoedeo Buikueo ayes Jo uopeula}eg ,P'.€ sessejo Awiqeyns Guizess) Buizes6 aes Aysuaj}ul Moy SUS 99USJ8JO4 Yoes JO} payejnojeo yey) uey) aye1 Buyooys 42}/8q JO 0} Jenba ue uleyUleEwW pue Bugeow sue BulzesB SMES JO} ue|q JuUsWebeueyy UONENIGeUSyY BY} Ul pa}eulWOU sa}is yey) UOSJad paylenb Apayeudoidde ue Aq uoneoynies “SJSPIOUSE}S 94) YIM paasBe sjeng| 0} peonpau sysu pue spyepUe}s Ue!eENSNYy pue souljepin6 jueAgjeu YIM SoURPsONOe Ul UayeyepuN usaq sey JUaLUSsasse 4ST ‘peap JO yoOls ‘AYJeoy payues uaym Ayeay aue sqnuys pue sasse6 JENPIAIPU! JO %GZ UeUY BIO; s]US WasiInbes SHO [eJepaj pue syejs Ayayes Auiqeuleysng *saloeds juejd sageu Jo juswdojaaap OU} oye AIQISIA 10 Suaqlunu JeyUe}sqns Ul 1Nd00 JOU Op S}saq “UII JAYe JO SOUeqIN|sIP Joye saioads saneu SJEUILUOP JOU OP SpasAA ‘SOUeQIN|sIp Jaye aye1ouebal Jo/pue says sapeds paysiqejsy SOUEGINSIP 0} BoUaIISAY “(s)eys souasejol a}eudoidde 40 JEU} 0} Bjqesedwioo sinjonujs Aeiojsuapun pue Jaaoopundadls aiunjonys AyunwweD (apidy90}5 WO’ Bulureysns-s9g *y ‘seaiy UMOpPAE . ‘ddH9 ‘saBeiocjys ake Jaye ‘sbuipying Buynyod-uoy -z yeyIqQey “spuejspley “snsoydsoud Jo uone}eBean jeinjeu BJeS ‘| ‘speoy Sepnjoul) pue ueBowyiu veyo4 | Buiureysns-yjos ysiqejsy Ayayes wi9}-Bu07 Sunyonyseyuy ‘| Soanool eo BOD UoHa|duog ncneiiaedne aes ianase UreWO eUulW alos [209 3sey Yeskq — 41.28/6101IWda Ajuoujny YUE, |2}UsWUOIIAUG
- Page 48
“@YIS B9USIBJAl AY} YM JUa]SISuCd JOUUeW B U! BUIUOROUNY S| a}IS 2 ye UOEPHIGeYos By) JEU Ue|g JUsWAHeUeW UOEWIGeYSY 8} U! PAYN|UEp! aq O} UOHE}IGeYS Jo Base YoRA JO} Saynuep! Buo}uow vOReyIqeysy OY} JO} Spud} SAnIsod ysiiqe}se 0} Buojluow UOREWIGEYSY “sruoydsoud pue usBouylu Je1/04 'S}USLINU [IOS ‘sy Aedod jeoiuayo pue jeoiskud ‘yidaq BIpay| YMold ‘yjdap jiosdo] ‘ANANOR O}2IGaL@Au| yeyey o1uebiC [SOUS SOUBIOJOI UM ajqejedwiod a1e sJoyedIpul HUIMO||O} 8Y “sessoood jeaiBojone JUGIaYIP Ul PSAOAU! sdnou6 soyeslpul saiseds ayeuqeLieaul jeuooUNY Jo aBued peoig e JO} saanejuasoidel Jo aquasaud e@ sj qJ9U) Jeu] UOSed payrjenb Ajayeudoidde ue Aq uonesymeg SOUS SOUaIAJa! B|qesed woo YM UOHeW!IGeYyad Jo Bale yore JOj ajqexedwieo aue suoyeolpul ayy yey} uosied peylyenb Ajayeudoidde ue Ag uoqeaypyed ‘seale payeqiqeyel ul yuasedde sqnuys pue see.n Jo sassei6 Jo uolsseoons jeuopes9Uab Jo SoUapIAy ‘gouaBiowe pue uoleuluueB ‘Bumjas pees ajqela ‘Buemoy jo souepiAs MOYS Seale payey|iqeysi ul saioeds uogeseuebe, jue| "yOO}S YIM payeMosse saniagoe juawabeurw Bulyepepun 403 PUL YOO}S JO} UWWOJPUR| jo Ayayes ‘pezes6 ueyM Ayliqe}s WUOJpuey ‘(ue|g JuswabeueW UOREWIGeYysay Sy} Ul psssaippe 8g 0}) Says BoUJaJO1 peyeUB|sep 0} e|qeseduoo ae $]UaWaJINDS) BQUBUS]UIEW PUP] “URI juowebeueyy uoReNqeusy au} Ul peynuapl (s)eyIs euslajal ayedosdde 0} ajqesedwod s} aanjonyjs Auoys J9A0 pue Aloyssapun ‘aacopunos6 yeu) Uossed payyjenb Ajayeudoidde ue Aq uoneoyiyieg SYS VOUBIOJOI Bulpuodse.ucd ou) Aq pauinbau se sareds jue|d Aey Jo uoRIsodwos pue Aysusq SAYS SOUSIAJOI BHulpuodsauwos oly uplg Jusuebeueyw voRewiqeyay QU] Ul palyUEp! SUOHEO] Ul Pays!|ge}se aie Payyuep! S}/s SOUaJaJo1 YRS JO} sapeds jueld Aay Jo uopisodwoo pue Aysuep eyy yeu} Used peyyenb Ajoyeudoidde ue Aq uoqeoyneg “uej}g jJuswebeueyy UOHEWIGeYSy OY} LI PSyUSp! SUOEDO] LU! PAYs!|qe}se ase PeyHuap! Syls GoUal9j04 Aq pauinbai se saioads yore JOJ payyuep! seioads Aay yey) uosied peyyenb Ajayeydoidde ue Aq uojeoyiiad ued Aay Jo a0uaseld BLE} UOHsjdwog $10}291PUj yalolg |209 Jseq UesAC — 71/8610 Wd Ajuouiny jeyuewuuUos|AUZ WUWad u0N09}01g eBe}eH pue yUsWUOLJIAU Jo jUsUedaG LGLNG + 9ZOLSLO1 « £9 J Bh OBed (ayidyo01g WOH Buiueysns-yeS “7 ‘seoly lea . . ‘ddHo ‘sebesoys p pue ¢ sessejo aIgeis “¢ ToreaA ‘SUIDIING Auqeyins Bulzess) Buizes6 apyeo Ayisuayul MOT seanosiqg uonewqeyoy Bulynjod-uon *Z ‘spuey|spleyy ayes ‘L ‘gpeoy sapnjou)) aunjonuysedu| “| Ages wu8}-Buo 1e0s) uOHEWIqeyoy
- Page 49
‘(ue|q JusWabeUeW LONe}|Iqeysy a4) Jed se) saAnoalgo Ayenb 1eyem Gunes pue suogebnseaul aiNyNy oO} joalqns ajqeuleysns oq 0} peulwuajap S}ILUI] JEYJO JO *G-g 0} G°g Jo eBue Hd eB pue Wo/snl ZZ UeY; 19872016 OU AANONpUCO [2dL}99/8 JO SyLuI| JUeUIWE}UCD aAey sia}em Hulajeoed Buyajus ylouns Jayem aoeyNS “‘payooye Ajasueape jou s| Ayjenb Jeyempunou6 jeuoiGes pue Ayiqeys jeo\Gojooe Ww9}-Buo] 8y} Jeu) smoys JusWssesse Jea/Hojooe ue 41 wWo/Srl ggo'z pesoxe Aew sa}em pion Aue jo AWANONpuod jeon}99/3 Sulseq |O.QU09 JUSWIPS JO SBSIE 3/qe}S OjUl J9]2M JO9JIP 0} SUIEJP UOISIAAIP pue sxe JNOJUC Jo as “SoNSLIa}OBIeYo WUOJPU] JEIWIS HIYXS Je) (UB|q JUsWEBeUeYY LOPE} }IGeYysy OU) 19d se) se}Is BDUAIa}9N LI yey) UeY} Ja}2016 OU a1e soq|IN5 pue si UoIsoJa Jo 8oUa1INDD0 Jo Aouanbay pue suolsuewiq (LM) Wun jlos yueul|Wwopaid ay) UO paseg (uOIsOJe Jeays) JA/e2U/SeUUO} OL UBY} SS9I SI SSO] [OS ;enUUe abersay “UUOJPUE] BU} JO edojs ey) YIM ay2INSUaLUWOD pa|e}sul sue SaiNjoNys jojUOD LOISO!y “elpaw yMosB Arepuosas Jo jlosdo} Jo we'g }se9] Je pue jiods JO W "| }se9) Je YM padded 9q ysnw jevayew yoe[es ay} ‘Juaseud oe safe] JOaler SJOUAA “ssosBep og) ueu} 49}e015 sadoys sey sduunp jlods payeyijiqeyes 9uj Jo Bare aU] Jo %GZ 0} dn pue ‘sseiBep O} UE) ssa] Jo sadojs sey sduinp jlods payeyiIgeyes ay} Jo Bale Oy] Jo % Gz UBL) ssa] ON “senbiuyos} Burjjepow psepuejs Aysnpul Buisn ‘“eeuj6ue jeo1uyoa}0e6 juajeduiod e Aq payejdwioo uaeq Sey jUslussasse jeo1UYyoa}08b e& pue ‘AjlIge}s [2O1ULjO9}096 jqiyxe sadojs ploA feu Iv asn pue| Bulujw sod ay) Jo aajejusseidas aue yoIUM (uel juswaBbeuey uonjeyiqeyoy au} 19d se) says aouaJaja) pe}euBlsep 0] ajqereduioo aue sesseooid BurjoAo yusuiny ‘asn pue] Buyuiwu -Jsod ay) Jo aAjejueseidal ase YOIYM ‘So}Is BOUaIEJOJ payeUBlsap ye Saye 0} a1qesedwoo ae sesse peyey|iqeyes ay} jo Aysuap ying pue Ayjiqeys ayeBouBBe ‘uoneniyul sae yy B91 UOTa}dui05 siajauesed JESILWUeYo pue jedishug eGeuleig Jayeaq soeyns jojuoD UuaWIpas pue udIsOlg yusIpess) adojs ‘juaipes6 adojs pue ‘aBueyd jeuosees ‘solweuAp uojejebaj, ‘Ayxe}dwos yeyqey ‘JUuaWAINIOS salpeds ‘BuljoAo Juan ‘Aoeden uojen|yuy “AUIIGE}S [10S ‘Buipnjou! ‘sedeospue| souela}O1 WIM peredwoo SUS OU) JO UOHEVIGQeyol jaloid [209 ysey YWeshq — 4128260 1IWda Ajou;ny jeyuewuolAUy WUE, 4uoN2e}01dg ebey198}] pue yueWUOJIAUG JO JUsUIeEdeg Z6ZWA + 9Z0LSL01 + €9 J0 6p eBeg TT eee Ayyenb sayean Ayiiqeys wWioypue] ,v'.€ sesselo Ayiqeyins Burzeisy Buizei6 apes Aysueyul MO] seayoelqo uoneWIqeyay Bululeysns-4jag “yp S19kIS “€ Buynyjod-uon "Zz aes ‘b Bululeysns-jjag “py BIGEIS € Buynyod-uoy *z ayes ‘| Ayajes we}-6u07 leop uoHewqeysy sdwnq (a}sem) ddHd pue poley ‘YUP SUIIN'Z (a!dy9NSg WOU ‘seany umopAe7 ‘ddd ‘seBei0js dayeaa ‘sBulping ‘spue}spiey ‘speoy sepnyjouy) aINJONYSewUy “1 ulewog aul
- Page 50
u0Nd9}01g a6e}Ja}H pue JUSWUOJIAUZ Jo jusUIeEdeg JO Selpads JO souasaid OU] JO SIOJED|PUl 10 SOUBDYIUBIS UOHEAISSUOD JO Salads Jo BunYBIS (-o}8 JoyoRseyo jesuedsip ‘yep eGEsn yeuqey ‘waned Ayanoe 6 9) sonsayoeseyo seeds 40 aBues 2 jo uojeyuesaiday saloads ayesqaylo;, ‘uosied peyljenb Ajayeudoidde ue Aq ,Aujeay, Se peYUe Be Seed} JO/pUE SQMUYs JO %G/ UeY} SOY “suoseas Juanbasgns J9A0 Jay] JO ujdep pue ssew yue}sisuoo e Aq paouapiae JaAR] ioyI] 2 SUIe]UleLU pue sdojeAap ucHE}abap, “saioeds qniys/eey Jo uOneJaUah puoczas jo s0uapiAg ‘Buronpoides asiwueujo uo Bunamoy ‘peas ajqela Bunjas jo ajqedeo aie soveds Ayyqeureysng “seloeds queld Saneu Jo JUdWdojsAep au} joaye Aigisia JO SJaquuNU |EAUe}SGNS Ul 41ND90 JOU OP S}Seq “UIEJ JOYe JO BdUedIN}sIp Jaye saosds sayeu ayeulwop you OP SPBeAA “20ueqUN}S|P Jaye ayeiauebol Jojpue @alsuns salads pausiqe}sy eoueqins|p 0} s0uel|Isey ~(uelg juowebeueyy ut uojey|iqeyoy au) sad se) (s)auls aousJajas ayetdoudde jo yeuj O} JejlwWis aunjonsyjs AvJo}s JOAO pue AdJOJSJOPUN ‘“JEACDPUNOIS ainyonuys Ayunuwoy ‘}sa10j usdo 0} pue|poom Bulnos0 AjjeuoiBed jo aanejuaseidas sasses6 pue sqniys ‘SaeJ} BAHEU JO SiN}xIwW & SesuUdWOo UOReJeaGan puejysng ‘Jugsold aie saineds auinGe] pue sses6 ounjsed snonijnu ‘ajqeyejed yo ajqissod asaym somunuiwos uojeleben Bulinoso A\jeuoiBas yo aanejussaidas sasses6 puej Buizes6 Jos uonisoduwioos se1ioads ‘edojs UMop | uy6ua| ul wo} eu) 49}20J6 Jo eave Ul ,WOZ UY) 19}2016 seoeyNs oueg ON “(jUesedd AJe J8A09 Jo Saunjyeay JayjO JO SHO] ‘S904 JI %OS 40) JU@SEJd S] JBACD SANEIOHSA %QZ JO WNWIUIIA] UBACD BOeNS JBADD BOBYHNS ‘wua}shsoo9 puejysng Bupsom Auyeay e se Jo/pue Bulzei6 ajqeulejsns se sulewe pue saysi|dwoooe Rae ajqeonoeid 18 yA, uonejaba, asn pue’| “949 UE ueu} SS9| SI (483) abejueoled winipos abuRYoXe 10S "g°g pue gg UsaMjaq Si }4d [10S “W/SP 9°0 YEU} SSB] SI JUB}UCD AYUI|ES [10S “(uel jugwabeuey uoje}|Igeyay oy sed se) UMoIB JURId 0} JeEJUaWINAP JOU ese SUONeIJUBDUCD JUSLINU OJOILU pUe |!oSdo} UI SUOI}EI}UGOU0 BOURGIN]SIP-1d YUM JUa}sisuos AjjesoUsH Sue SUONENUSOUOD JUBLINU OJOBY\ “S}UOIQUIASOJOIW JAUJO JO/pUe SEZIYUOOAW ‘JaAe} JO}!| JO suajowesed aoueseid aly Aq peouspiae se Buuinooo aie sassaoqd Buyokoos pue uoReNuNdoe jUaLANN | [OS jed1waeYyod pue eOISAUd osdo| “SplepUe]S UBIEASNY pue SOUOpING JUeAS|Os UM GoUePIONL UI AIjeoUeB paeouseq | t—“i‘“‘s‘sé‘“‘édOC;*# aaey esau} ‘subis Buluiem pue soous} Ajajes ‘spung apnjoul saunseaw uoNnRBiIW YSU SJOUAA ‘anuay Ayunoas ou} Buoje payoase sjuawasinbes aq || ssaooe a1qnd Buniqiyoud pue Ayes oljqnd 9} ysl 9y} Buyeys Aueap ‘subs sIgeUns | S'SHO [e4apa} pue a}e1S Aajes $2aj99/G0 BaD uone|dwoy $10}€91pu| uoneyWiqeyey yoaloig [209 ysey Weskq — 71.2826L0IWda Ajoujny jeyuewuoAUy WUWad Z6LIN « 9ZO0LSLOT + €9 30 0G Beg Bululeysns-sag ‘py SIGEIS “€ sdwng Buynyjod-uoy *Z (a}sem) ddHO pue ayes", | jooley ‘yup ouiyy *Z [eo uoneWIGeyoy ujewiog aul
- Page 51
U0N99}01g a6ez19} pue JUsWIUOMAUA Jo JUOWeEd|G . Z6LING + 9ZOLSLOT « €G JO Lg abe &, ea JOJEM pajooye SuILU Jeu} a1NSUS oO} pue AsepuNog 9jIs Buy UIUJIM ANjSILU@YO J9}eM 0} seBueUd Aue Joyuow Ajasopo 0} aoejd u! UeWeL |[IM WesGo1d Buuo}UOW Jayem BoRJINS pue punolb y suajauesed Jeolways pue |ea1sAyd Ayyenb sayean *peuinbes 4 8SN pue| sulw-}sod ainjsed Ysiiqe}se \sisse 0} parjdde oq || peas souyeinjsed pue Jasie4 *SUILU SUR JO SunsojO BuIMo}[O} ays Ey} Jo SuOHOSdsul a]qeus 0} peulejuleW oq 0} SI peos Ssande |jolyaa JUBY “yeuayew psyoedwas ussoo| 0) paddy daap ag jl Boze ay} peuinbeu 4) “ajqeoydde suaym payeysul -91 aul| eBeuleip Buysixe-eid oy} pue paraowal aq [IM (‘0}9 ‘speajno *e"!) sBulssos9 yaas9 ALY ‘seaie Bulpunowns 34) YM ADUA]S|SUOD [BA] BDELNS SJNSUD 0} V@YeVEpUN aq |]IM YOM Buldeyse J9ZOp JOU “sJapjoyayeys au) Aq poeiBe pue pauysp useq eaey s}yeuad J0/ pue SO|WOU0DS Pa}olpald “saagoe juswebeuew a}20 ajes 0} SAONpUuod pue ajqissesoe AlIpess OJ SBAIY "UOUS}OJ BY} 10} sJUsUSeIBe Ud}LIM JBULLIO} OU! P3sa}Ue SAeY sepjoysyeys SS9/UN PeAowal UVeq BABY SINJONISeyu! JOyjo pue (ayqnd au) Aq pesn ssouy }deoxe) speoy uonejaba, (Bujouay Ayunoas ‘ease 98Se9| pequnisip -un ‘sy9e2]) eae SSed] POUILW-UA"E Bululeysns-as “p SIQEIS “€ Bugnyjod-uoy “Zz SHES “L asn pue) uolyeyoba,, (ue|d juswaBeuew uoleyiqeyes Sy} Ul pessouppe eq 0}) SS SOUssaJas JUBABIOI yoes JO} payejnojeo yeu} uey) ayes Bulyoojs seyeq 40 0} jenba ue Bujureysns eye asn pue] Gulu ysod e se Gulzes6 ayes 404 peyeulwou sesie a}eo!pul sjeiy Bupypojs apyep ,P'.€ Sasselo Ayigeyns Burzess Burzes6 ayes Aysuajul MOF ‘(ue]g juawaBeueyy UOHeN!IGeYsy Su} Ul PassaJppe aq O}) a}Is eOUsJEJe1 YOR JO} payejnojeo yey} UBL 9}e1 Bulyoo}s 48}}9q JO 0} jenba ue ulejulelW pue Bujsow eve Bulze6 ajyeo 40) ue|q jueWabeuey UOHE}|IGeysy 84} U! peyeulLUOU Says Jey} UOSJed paylfenb Ajs}eudoudde ue Aq uoeoymed ‘aiqeonoesd A\qeuoseal se Mo] Se 0} peonpai sysu pue spsepueIS UBl|eENSNYyY pue ssuljepiné juersjed Yim BouepOD0e U! UBYyePEpuUN Udeq sey JUsLUSSasse YSIY sjuawasinbs SHO [esepa} PUe a}e}S ‘Jueseld ase adA} Wis}sAsode jeu} JO SJUB}IqeYyU! 9}e1GeYSAU! pue a}eiqayen Jo Ajofew au) Aq pauinbeu saoinos 49}eM pue J9}/9yYs ‘pooy jeoIdA | ainjonyjs yeyqey “sesseoold jeolBojooe JUuaJeLIp u! paajoau! sdnou6 soyeo!pu! |euopouny jo aBues peo e Jo seAneyUuaseides jo souasalg seloeds ayesqaeau| ‘quawuysinbulja) ssea] sulw Oo} Jold suoseas BAISSBOONS OM BY} JBAO %Op UeY) GOW Aq JO JUBWWYSINbul|aJ 9sea] SUIW O} JoLId suosess SAISSBDONS OU} Ul %GZ UeY} a1oLu Aq eseasoep jou Seop sa|peds ayeiqeHA Jo Joquuinu sul “SsOUBOYIUBIS UOWeAIaSUOD seayoeiqo uoHeWIGeYyoy 1209 uoneniqeyoy Bia} UoHsjdwoy ulewog sully yaloid [209 jsey Weshq — 71782610 Wda Awouiny jeyuewuolAuy yWued
- Page 52
Sy Z6LWA + 9ZOLSLO1- €¢ Jo zg abe uooaj0Jq ebeje} pue jUsWUOIIAUY Jo juUewWpedag “UONBYIGeYOs O} JUBAG/OI SU/ELIOG] BUI fO UONEIO{ ay] 10) CG] XIpUaddy 0} 48JOY, “SPIEPUEIS ueyeasny pue ssuljepin6 jueAe|al UM BoURpIONNR UI AjjesaudBb payoose ud9q OAeY asel} ‘subis Buiuiem pue soouay Ayes apnjoul Sainseaw UoHeBHIW ys QaUAA ‘PayUswesduui sjusweainbes usaq aaey Saunseaw uoHebiiwW ySU pue pe}e|dwioo useq Sey JUBWSSESsse YShY S9HO [BJapay pue ayeyg ‘soyempunosb pue 19}eM aoeyns aqIsyo BSuynijod jou si seay}oe(qo eo Ba} UoHa|dwoy $10}e9/puj uoneIqeyou uoneWMqeuey ulewog sul yoaloid 20D jsey Weshq — 41 /28/6L0IWda Ajoujny jejuewuosAUS ULE
- Page 53
Permit Environmental Authority EPML01978714 — Dysart East Coal Project Appendix F — Mine domains (rehabilitation) t : Beene 53000 oe | AAG Lee dnptonien LATENT MUA» Intracrunture (3.50 Spell Dame snd Det (73.67hi — (Uneditzturbed Lease ares (88S. na) "ak le Why Ricramen Han tae aS, Bagel, ams yi mis Fk Ak et (Bc mil al ae Bs a a FO OTe 2s ste ae NO eg ea. Wiad Lie ye ng, aE ately ait 6a Ket hy VAs a Dd bay WS wa Sn, URS abi i Ng es 3 ah he tit i yl Hy cats ti, seit bbeLisnal wisntabidrrerdahermticunta at TT cates Intima inmididehter’ Lncutalisiants iad noni Winentioketen amare re hethlehada tihdetiedeeadioiinden dass beidetictott he nn S40 fini Ka aed oly Shp Set, PR PE ws 2d COS ACT A ae, Ml CIA wath Ove CES yet EDI Yr ETE BENGAL COAL ; CONCEPTUAL PTY LTD DYSART EAST COAL MINE PROJECT FINAL LANDFORM