Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Coal environmental authority

EPML00565813 · ANGLO COAL (DAWSON) LIMITED

Coal environmental authority EPML00565813 (ANGLO COAL (DAWSON) LIMITED), Granted. 145 conditions indexed. Holds PRC plan P-PRCP-101135507.

Status
Granted
Holders
ANGLO COAL (DAWSON) LIMITED; Mitsui Moura Investment Pty Ltd
Tenures
ML5591; ML5592; ML5593; ML5596; ML5597; ML5598; ML5599; ML5600; ML5601; ML5603; ML5604; ML5606; ML5607; ML5611; ML5630; ML5643; ML5644; ML5646; ML5650; ML5656; ML80032; ML80034; ML80070; ML80142; ML80146
PRC plan
P-PRCP-101135507 · effective 2026-07-06
How it was read
Numbered conditions
Register
Register record · Instrument PDF

Conditions

145 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm.

  2. A2

    Prevent and /or minimise likelihood of environmental harm In carrying out the environmentally relevant activities, the environmental authority holder must take all reasonable and practicable measures to prevent and/or to minimise the likelihood of environmental harm being caused. Any environmentally relevant activity, that, if carried out incompetently, or negligently, may cause environmental harm, in a manner that could have been prevented, shall be carried out in a proper manner in accordance with the conditions of this environmental authority.

  3. A3

    Storage and handling of chemicals and flammable or combustible liquids All chemicals and flammable or combustible liquids must be stored and handled in accordance with the most recent version of an Australian Standard where such is applicable. Where no relevant Australian Standard exists, store such materials within an effective on-site containment system.

  4. A4

    Authorised disturbance Disturbance is authorised as shown in Figure 1 Authorised Disturbance Areas, including: Surface Disturbance within areas marked as "Authorised Surface Disturbance"; and Coal Mining Disturbance within areas marked as "Authorised Coal Mining Disturbance".

  5. A5

    Any disturbance outside of the areas marked in Figure 1 Authorised Disturbance Areas must not occur in the Exclusion Zone except as authorised to the extent reasonably necessary for the transport corridor in the Exclusion Zone (referenced in the EMOS).

  6. A6

    Maintenance of measures, plant and equipment The environmental authority holder must ensure: a) that all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority are installed; b) that such measures, plant and equipment are maintained in a proper condition; c) that such measures, plant and equipment are operated in a proper manner; and d) that all instruments and devices, used for the measurement or monitoring of any parameter under any condition of this environmental authority, are properly calibrated. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 6Monitoring and reporting
  7. A7

    Monitoring and records Except where specified otherwise in another condition of this environmental authority, all monitoring records and reports required by this environmental authority must be kept for a period of not less than 5 years.

    page 7Monitoring and reporting
  8. A8

    Monitoring and determinations required under any condition of this environmental authority must be conducted by an appropriately qualified person(s).

    page 7Monitoring and reporting
  9. A9

    Upon request from the administering authority, copies of monitoring results, records, registers, management plans and reports required by the conditions of this environmental authority must be made available and provided to the administering authority within 20 business days or an alternative timeframe agreed between the administering authority and the environmental authority holder.

    page 7Monitoring and reporting
  10. A10

    Notification of emergencies, incidents and exceptions The environmental authority holder must notify the administering authority by written notification within 24 hours after becoming aware of any emergency or incident that results in the release of contaminants not in accordance, or reasonably expected to be not in accordance, with the conditions of this environmental authority.

    page 7Monitoring and reporting
  11. A11

    Within 20 business days following the initial notification under condition A10, or the receipt of monitoring results associated with the notification made under condition A10, whichever is the latter, the environmental authority holder must provide further written advice to the administering authority, including: a) potential circumstances and actions that may have contributed to the emergency or incident; b) results and interpretation of any samples taken and analysed; c) outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and d) proposed actions to prevent a recurrence of the emergency or incident and the timeframes to complete the actions.

    page 7Monitoring and reporting
  12. A12

    Complaints The environmental authority holder must record all environmental complaints received about the mining activities, including: a) complainant' name, address and contact number; b) time and date of complaint; c) reasons for the complaint; d) investigations undertaken; e) conclusions formed; f) actions taken to resolve the complaint, including the use of appropriate dispute resolution if required; g) any abatement measures implemented or proposed and the timeframes to implement the abatement measures; and h) person responsible for resolving the complaint. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 7Monitoring and reporting
  13. A13

    A register of alternative arrangements must be established and maintained by the environmental authority holder. The register must include: a) the location to which the alternative arrangement applies; b) the period of the alternative arrangement; c) details about the particular environmental nuisance impact/s the arrangement is for; and d) details about the mitigation measures, where relevant.

  14. A14

    Monitoring on request When requested by the administering authority, the environmental authority holder must investigate any nuisance, or contaminant release, or environmental harm, or complaint that is neither frivolous nor vexatious in the opinion of the authorised person, by: a) undertaking the monitoring specified by the administering authority; b) undertaking the monitoring in the timeframe nominated or agreed to by the administering authority; c) completing an analysis and interpretation of the monitoring results; and d) implementing abatement measures, where required.

    page 8Monitoring and reporting
  15. A15

    The results of the investigation undertaken in accordance with condition A14 must be provided to the administering authority within 20 business days of completion of the monitoring timeframe in accordance with condition A14(b), or a longer timeframe agreed to by the administering authority.

    page 8Monitoring and reporting
  16. A16

    Standards, policies and guidelines Where a condition of this environmental authority requires compliance with a standard, policy or guideline published externally to this environmental authority, the environmental authority holder must: a) comply with the amended or changed standard, policy or guidelines within 2 years of the amendment or change being made, unless, i. a different period is specified in the amended standard or relevant legislation, or ii. the period specified in condition G36, where the amendment or change relates specifically to existing regulated structures; and b) until compliance with the amended or changed standard, policy or guidelines is achieved, continue to remain in compliance with the corresponding provision that was current immediately prior to the relevant amendment or change.

    page 8Regulated structures
  17. A17

    Risk management The environmental authority holder must develop and implement a risk management system for mining activities which mirrors the content requirement of the Standard for Risk Management (ISO31000:2009), or the latest edition of an Australian standard for risk management, to the extent relevant to environmental management.

  18. A18

    Third-party reporting The environmental authority holder must: by 1 September 2026 and every 3 years thereafter, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; and provide each report to the administering authority within 90 days of its completion. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Schedule B: Air Condition Condition number

    page 8Monitoring and reporting
  19. B1

    Odour nuisance The release of noxious or offensive odour or any other noxious or offensive airborne contaminant resulting from the mining activities must not cause an environmental nuisance, at any sensitive place or commercial place.

  20. B2

    If the administering authority determines odour released from the mining activities to constitute an environmental nuisance, the environmental authority holder must immediately implement abatement measures so that emissions from the mining activities do not result in further environmental nuisance.

  21. B3

    Air quality objective Dust and/or particulate matter resulting from the mining activities must not cause an Air Quality Exceedance at a sensitive place or commercial place. An Air Quality Exceedance occurs when monitoring in accordance with condition A14 indicates exceedance of the air quality objective stated in Table B1 Air Quality Monitoring Requirements. NOTE: Exceedances due to events that cannot be managed by the environmental authority holder, such as bushfires, fuel reduction burning for fire management purposes or dust storms, would not be considered to be in breach of condition B3 if the environmental authority holder can demonstrate that the exceedance was caused by such events.

    page 9Air, Monitoring and reporting
  22. B4

    If an Air Quality Exceedance occurs at a sensitive place or commercial place, the environmental authority holder must: a) notify the administering authority in accordance with condition A10; and b) provide further written advice to the administering authority in accordance with condition A11, including: i. the air quality and meteorological data, collected in accordance with condition A14, relevant to the time of the exceedance; ii. if available, any air quality and meteorological data collected upwind of the mining activities; iii. measures taken to reduce dust and/or particulate matter generated by the mining activities; and iv. the contribution of the mining activities to the PM10 concentration at the sensitive or commercial place. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 9Air, Monitoring and reporting
  23. B5

    Air Emissions Management Plan An Air Emissions Management Plan must be developed by an appropriately qualified person and implemented for all stages of the mining activity. The Air Emissions Management Plan must incorporate a program for continuous improvement for the management of dust and particulate matter resulting from the mining activities with respect to, but not limited to: a) when required in accordance with condition A14, the collection of air quality and meteorological data using the monitoring methods described in Table B1 Air Quality Monitoring Requirements; b) a system to identify adverse meteorological conditions likely to produce elevated levels of dust in exceedance of the Air Quality Objective identified in Table B1 Air Quality Monitoring Requirements at a sensitive place or commercial place due to the mining activities; and c) a dust and particulate matter control strategy which activates a timely implementation of management control actions.

    page 10Air, Monitoring and reporting
  24. B6

    The Air Emissions Management Plan required by condition B5 must be reviewed by 30 September every 2 years by an appropriately qualified person and any recommendations incorporated into the Air Emissions Management Plan. Table B1 Air Quality Monitoring Requirements Parameter Monitoring Frequency Air Quality Objective Monitoring Method

    page 10Air, Monitoring and reporting
  25. C1

    Noise limits Noise from the mining activities must not exceed the limits in Table C1 Noise Limits, at any sensitive place or commercial place.

    page 11Noise and vibration
  26. C2

    Noise monitoring Noise monitoring, undertaken in accordance with condition A14, must: a) comply with the most recent version of the administering authority's Noise Measurement Regulation 2019 (Chapter 5, Part 4); b) be undertaken using a class 1 sound level meter as classified under Australian Standard AS IEC 61672; and c) assess compliance with the conditions of this environmental authority.

    page 11Noise and vibration, Monitoring and reporting
  27. C3

    If monitoring, undertaken in accordance with condition C2, indicates exceedance of the relevant limits in Table C1 Noise Limits, the environmental authority holder must immediately implement abatement measures so that emissions from the mining activities do not result in further environmental nuisance.

    page 11Noise and vibration, Monitoring and reporting
  28. C4

    Vibration limits Vibration from the mining activities must not exceed the limits specified in Table C2 Vibration Limits, at any sensitive place or commercial place.

    page 11Noise and vibration
  29. C5

    Airblast overpressure limits Airblast overpressure from the mining activities must not exceed the limits specified in Table C3 Airblast Overpressure Level, at any sensitive place or commercial place. Table C1 (Noise Limits) Monday to Sunday (including Public Holidays) Noise Level Day Evening Night dB(A) (7am to 6pm) (6pm to 10pm) (10pm to 7am) Sensitive Place 42 42 37 LAeq, adj, 10 mins LA1, adj, 10 mins 52 52 47 Commercial Place 52 52 52 LAeq, adj, 10 mins Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 11Noise and vibration
  30. C6

    Vibration and/or airblast overpressure monitoring Vibration and/or airblast overpressure monitoring, undertaken in accordance with condition A14, must comply with the most recent version of the administering authority's Noise Measurement Manual, and must include the following descriptors, characteristics and conditions: a) location of the blast(s) within the mining area (including which bench level); b) atmospheric conditions including temperature, relative humidity and wind speed and direction; and c) location, date and time of recording.

    page 12Noise and vibration, Monitoring and reporting
  31. C7

    If monitoring, undertaken in accordance with condition C6, indicates exceedance of the relevant limits in Table C2 Vibration Limits or Table C3 Airblast Overpressure Level, the environmental authority holder must immediately implement abatement measures so that emissions from the mining activities do not result in further environmental nuisance. Location Table C2 Vibration Limits Sensitive place or commercial place Vibration Measured (7am to 8pm) 5 mm/s peak particle velocity for nine (9) out of ten (10) consecutive blasts and not greater than 10 mm/s peak particle velocity at any time. Table C3 Airblast Overpressure Level Location Airblast Overpressure Measured (7am to 8pm) Sensitive place or commercial place 115 dB (Linear peak) for nine (9) out of ten (10) consecutive blasts and not greater than 120 dB (Linear peak) at any time. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Schedule D: Waste Condition Condition number

    page 12Noise and vibration, Waste, Monitoring and reporting
  32. D1

    Waste management A Waste Management Plan must be developed by an appropriately qualified person and implemented for all mining activities. The Waste Management Plan must include, but is not limited to: a) a description of the mining activities that may generate waste; b) the location/s (including GPS coordinates) of where all waste activities are, or have been, carried out, including: i. the type of waste disposed of, treated, or reprocessed; and ii. the volume of waste disposed of, treated, or reprocessed; c) identification of the potential risks to the environment from all waste activities carried out; d) control measures to be implemented to minimise the potential for environmental harm associated with carrying out of the waste activities, including but not limited to: i. segregation of the wastes; ii. storage of the wastes; iii. transport of the wastes; iv. disposal of waste including leachate management; and v. monitoring and reporting matters concerning the wastes; e) how the waste will be managed in accordance with the waste management hierarchy (that is, avoid, reuse, recycling, energy recovery, disposal); f) the hazardous characteristics of the wastes generated including disposal procedures for hazardous wastes; g) procedures for reprocessing waste in accordance with condition D4; h) procedures for managing accidents, spills and other incidents; i) the indicators or other criteria on which the performance of the waste management plan will be assessed; j) staff training; k) a system for regular review; and l) be updated at intervals of no greater than 5 years.

    page 13Waste, Monitoring and reporting
  33. D2

    The environmental authority holder must review and update the Waste Management Plan required by condition D1 and submit to the administering authority prior to commencing a new process, or varying an existing process, for reprocessing any waste and/or at intervals of no greater than 5 years.

    page 13Waste
  34. D3

    Waste receipt The only waste permitted to be received is: a) the types of waste specified in conditions D4 to D8 (inclusive); and b) sewage and sludge for treatment in accordance with Schedule H: Sewage Treatment; and c) from an Anglo American site in Queensland. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 13Waste
  35. D4

    Waste reprocessing The only waste permitted to be reprocessed is: a) spoil or overburden; b) vegetation; c) water or sediment containing hydrocarbons; d) fuels, oils, lubricants and coolants; e) bulk rubber; f) inert waste; g) poly-pipe and other plastic; h) fibreglass; i) treated and untreated timber; and j) asphalt.

    page 14Waste, Land and soil, Biodiversity
  36. D5

    Waste disposal Unless otherwise specified in conditions D6 to D8 (inclusive), waste, other than spoil or overburden or vegetation removed as part of the mining activity, must not be disposed of within the mining leases listed on this environmental authority and must be taken to a facility that is lawfully allowed to accept such waste under the provisions of the Environmental Protection Act 1994.

    page 14Waste, Biodiversity
  37. D6

    Mineral waste disposal The following types of waste are permitted to be disposed of within the specified features for the waste type: a) rejects and sediment containing hydrocarbons: i. in spoil emplacements; and ii. in regulated structures in accordance with Schedule G: Regulated Structures of this environmental authority; and iii. in pits or voids; and iv. in dedicated rejects emplacements; and b) tailings and water or sediment containing hydrocarbons: i. in regulated structures in accordance with Schedule G: Regulated Structures of this environmental authority; and ii. in pits or voids that are not regulated structures, provided a consequence category assessment in accordance with condition G1 has been completed. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 14Regulated structures, Waste, Land and soil
  38. D7

    Non-mineral waste disposal The following types of waste are permitted to be disposed of within the mining leases listed on this environmental authority: a) bulk rubber; b) inert waste; c) poly-pipe and other plastic; d) fibreglass; e) treated and untreated timber; f) asphalt; and g) asbestos. These types of waste may be disposed of: a) in pits or voids; b) in spoil emplacements; and c) left in situ below ground level.

    page 15Waste
  39. D8

    The environmental authority holder is authorised to dispose of general waste on site. The location of the general waste must be recorded and include GDA2020 coordinates. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Schedule E: Land Condition Condition number

    page 15Waste
  40. E1

    Land disturbed by mining must be rehabilitated in accordance with Table E1 Rehabilitation Requirements.

    page 16Rehabilitation
  41. E2

    Rehabilitation must commence progressively in accordance with the plan of operations.

    page 16Rehabilitation
  42. E3

    Contaminated Land Before applying for surrender of a mining lease, the environmental authority holder must (if applicable) provide to the administering authority a site investigation report under the Act, in relation to any part of the mining lease which has been used for notifiable activities or which the holder is aware is likely to be contaminated land, and also carry out any further work that is required as a result of that report to ensure that the land is suitable for its final land use.

    page 16Monitoring and reporting
  43. E4

    Before applying for progressive rehabilitation certification for an area, the environmental authority holder must (if applicable) provide to the administering authority a site investigation report under the Act, in relation to any part of the area the subject of the application which has been used for notifiable activities or which the holder is aware is likely to be contaminated land, and also carry out any further work that is required as a result of that report to ensure that the land is suitable for its final land use under condition E1.

    page 16Rehabilitation, Monitoring and reporting
  44. E5

    Preventing contaminant release to land Contaminants must not be released to land in manner that constitutes a nuisance, material harm or serious environmental harm. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Table E1 Rehabilitation Requirements Mine Domain Mine Rehabilitation Rehabilitation Indicators Completion Criteria All Domains, with the exception Feature Goal Objectives of the Final Void Name Safe, stable, Bushland Native plant species richness 15 Final Void Non-use All self-sustaining, Management Area (NUMA) [see non-polluting (total no. in RE) also Figure 2] Residual Voids Non-eucalypt trees (stems 200 per ha) Tree canopy cover (%) 30 Native shrub cover (%) 20 Native perennial grass cover 20 (%) Organic litter cover (%) 60 Grazing Grass cover (%) 40 - 60 Safe and stable Safe for humans Biomass (kg/ha) 1000 and livestock Geotechnically and a) Maximum NUMA extent no greater erosionally stable than: i. North Pit - 147.5 ha projected surface area; ii. Pit 2 - 170.4 ha projected surface area; iii. Pit 3-12 - 517.1 ha projected surface area; iv. Pit 13 - 123.4 ha projected surface area; Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Non-polluting Void is a Void modelling and v. Pit 19 - 199.3ha projected groundwater sink monitoring surface area; and does not overtop vi. Pit 24 - 111.9 ha projected surface area; and Self-sustaining Not Applicable Not Applicable b) Exposed coal seam is capped; and c) Fencing is erected above the final

    page 16Rehabilitation, Groundwater, Monitoring and reporting
  45. F1

    Contaminant Release Contaminants that will or have the potential to cause environmental harm must not be released directly or indirectly to any waters as a result of the mining activities, except as permitted under the conditions of this environmental authority.

  46. F2

    Unless otherwise permitted under the conditions of this environmental authority, the release of mine affected water to waters must only occur from the release points specified in Table F1 Mine Affected Water Release Points.

    page 20Surface water
  47. F3

    The release of mine affected water to internal water management infrastructure that is installed and operated in accordance with a Water Management Plan that complies with conditions F26 to F27 inclusive is permitted.

    page 20Surface water
  48. F4

    The release of mine affected water to waters in accordance with condition F2 must not exceed the release limits stated in Table F2 Mine Affected Water Release Limits when measured at the monitoring points specified in Table F1 Mine Affected Water Release Points for each quality characteristic. Table F1 Mine Affected Water Release Points Release Latitude Longitude Mine Affected Water Monitoring Point Monitoring Point Receiving Point (GDA2020) (GDA2020) Source and Location (Water Quality) (Flow - end of Waters (RP) pipe) -24.4887 150.0640 Dawson North, AQ-DN01T Description RP-DN01T Industrial Dam RP-DN01T Dawson River via RP-DN02T -24.4992 150.0488 Dawson North, AQ-DN01T RP-DN02T Rock Hole Gully Industrial Dam 4 and Kianga Creek RP-DC02T -24.6625 150.0614 AQ-DC02T RP-DC02T RP-DC03T -24.7154 150.0138 Dawson Central, AQ-DC05T RP-DC03T Dawson River via RP-DC07T -24.6520 150.0416 14 Dam AQ-DC02T RP-DC07T Kianga Creek and RP-DC08T -24.6521 150.0437 AQ-DC02T RP-DC08T Rock Hole Gully RP-DC10T -24.6071 150.0391 Dawson Central, AQ-DC03T RP-DC10T Pit 17B Dawson River via Kianga Dawson Central, Pit 13A & 13BL Dawson River via Dawson Central, 14 Mile Creek Pit 11A Dawson River via Dawson Central, Kianga PIT 6-8 Dawson River via Kianga Dawson River via Kianga Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Table F2 Mine Affected Water Release Limits Quality Characteristic Release Limit Monitoring Frequency Release limits specified in Table F4 Electrical Conductivity Daily during release (the first sample must be taken within 2 (-S/cm) 6.5 (minimum) hours of commencement of release) pH 9.0 (maximum) (pH units) Weekly during release (the first sample must be taken within Turbidity 560 2 hours of commencement of release) (NTU) Release limits specified in Table F4 Sulphate (SO42-) (mg/L)

    page 20Surface water, Regulated structures, Monitoring and reporting
  49. F5

    The release of mine affected water to waters from the release points must be monitored at the locations specified in Table F1 Mine Affected Water Release Points for each quality characteristic and at the frequency specified in Table F2 Mine Affected Water Release Limits and Table F3 Release Contaminant Trigger Investigation Levels. NOTE: the administering authority will take into consideration any extenuating circumstances prior to determining an appropriate enforcement response in the event condition F5 is contravened due to a temporary lack of safe or practical access. The administering authority expects the environmental authority holder to take all reasonable and practicable measures to maintain safe and practical access to designated monitoring locations.

    page 21Surface water, Monitoring and reporting
  50. F6

    If quality characteristics of the release exceed any of the trigger levels specified in Table F3 Release Contaminant Trigger Investigation Levels during a release event, the environmental authority holder must compare the downstream results in the receiving waters to the trigger values specified in Table

    page 21Surface water
  51. F3

    Release Contaminant Trigger Investigation Levels and: (1) where the trigger values are not exceeded then no action is to be taken; or (2) where the downstream results exceed the trigger values specified in Table F3 Release Contaminant Trigger Investigation Levels for any quality characteristic, compare the results of the downstream site to the data from background monitoring sites and; (a) if the result is less than the background monitoring site data, then no action is to be taken; or (b) if the result is greater than the background monitoring site data, complete an investigation into the potential for environmental harm and provide a written report to the administering authority within 28 days, outlining: i. details of the investigations carried out; and ii. actions taken to prevent environmental harm. NOTE: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with condition F6(2)(b), no further reporting is required for subsequent trigger events for that quality characteristic.

    page 21Monitoring and reporting
  52. F7

    If an exceedance in accordance with condition F6(2)(b) is identified, the environmental authority holder must notify the administering authority within 24 hours of receiving the result. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Table F3 Release Contaminant Trigger Investigation Levels Quality Characteristic Trigger Comment of Trigger Level Monitoring Level Frequency Aluminium (-g/L) For aquatic ecosystem protection, based on SMD guideline Arsenic For aquatic ecosystem protection, based on SMD guideline Commencement Cadmium 55 For aquatic ecosystem protection, based on SMD guideline of release and 13 For aquatic ecosystem protection, based on SMD guideline thereafter weekly Chromium 0.2 For aquatic ecosystem protection, based on LOR for ICPMS during release Copper 1 For aquatic ecosystem protection, based on low reliability when safe to do Iron 2 so and access 300 guideline For aquatic ecosystem protection, based on SMD guideline permits Lead 4 For aquatic ecosystem protection, based on LOR for CV FIMS For aquatic ecosystem protection, based on SMD guideline Mercury 0.2 For aquatic ecosystem protection, based on SMD guideline For aquatic ecosystem protection, based on SMD guideline Nickel 11 For aquatic ecosystem protection, based on low reliability Zinc 8 guideline For aquatic ecosystem protection, based on SMD guideline Boron 370 For aquatic ecosystem protection, based on low reliability Cobalt 90 guideline For aquatic ecosystem protection, based on LOR for ICPMS Manganese 1900 For aquatic ecosystem protection, based on LOR for ICPMS Molybdenum 34 For aquatic ecosystem protection, based on LOR for ICPMS For aquatic ecosystem protection, based on LOR for ICPMS Selenium 10 For aquatic ecosystem protection, based on SMD guideline Silver 1 For aquatic ecosystem protection, based on ambient Qld WQ 1 Uranium 10 Guidelines (2006) for TN Vanadium 900 For aquatic ecosystem protection, based on LOR for GCMS Ammonia 1100 For aquatic ecosystem protection, based on LOR for GCMS Protection of Livestock and short term irrigation guideline Nitrate Petroleum hydrocarbons (C6-C9) 20 Petroleum hydrocarbons (C6-C9) 100 2000 Fluoride (total) NOTES: 1. All metals and metalloids must be measured as total (unfiltered) and dissolved (filtered). Trigger levels for metal/metalloids apply if dissolved results exceed trigger. 2. The quality characteristics required to be monitored as per Table F3 Release Contaminant Trigger Investigation Levels can be reviewed once the results of 2 years monitoring data is available, or if sufficient data is available to adequately demonstrate negligible environmental risk, and it may be determined that a reduced monitoring frequency is appropriate or that certain quality characteristics can be removed from Table F3 Release Contaminant Trigger Investigation Levels by amendment. 3. SMD - slightly moderately disturbed level of protection, guideline refers ANZG (2018). 4. LOR - typical reporting for method stated. ICPMS/CV FIMS/GCMS - analytical method required to achieve LOR.

    page 21Monitoring and reporting
  53. F8

    Mine Affected Water Release Events The environmental authority holder must ensure a stream flow gauging station(s) is installed, operated and maintained to determine and record stream flows at the locations and flow recording frequency specified in Table F4 Mine Affected Water Release During Flow Events.

    page 23Surface water, Monitoring and reporting
  54. F9

    Notwithstanding any other condition of this environmental authority, the release of mine affected water to waters in accordance with condition F2 must only take place during periods of natural flow events in accordance with the receiving water flow criteria for discharge specified in Table F4 Mine Affected Water Release During Flow Events for the release point(s) specified in Table F1 Mine Affected Water Release Points.

    page 23Surface water
  55. F10

    The daily quantity of mine affected water released from each release point must be measured and recorded at the monitoring points in Table F1 Mine Affected Water Release Points.

    page 23Surface water, Monitoring and reporting
  56. F11

    Releases to waters must be undertaken so as not to cause erosion of the bed and banks of the receiving waters or cause a material build-up of sediment in such waters. Table F4 Mine Affected Water Release During Flow Events Receiving Release Point Gauging Station Gauging Station Gauging Station Receiving Water Receiving Water Release Limits waters (RP) Latitude Longitude Flow Criteria for Flow Recording Electrical (GDA2020) (GDA2020) Conductivity discharge Frequency (-/cm) and (m3/s) Sulphate (SO42- mg/L) Dawson River RP-DN01T Bindaree -24.3034 149.8086 5.4 Continuous EC<5000 RP-DN02T RP-DC02T (minimum daily) Sulphate<9000 RP-DC03T RP-DN01T RP-DC10T Kianga Creek RP-DC07T Kianga Creek -24.6154 150.0240 1 Continuous EC<3500 RP-DC08T RP-DN10T (minimum daily) Sulphate<6300 Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 23Surface water, Land and soil
  57. F12

    Notification of release event The environmental authority holder must notify the administering authority via WaTERS as soon as practicable and no later than 24 hours after commencing to release mine affected water to the receiving environment. The release commencement notification must include the submission of written advice to the administering authority of the following information: a) release commencement date and time; b) expected release cessation date and time; c) release point(s); d) release rate; e) receiving water(s) including the natural flow rate; and f) any details (including available data) regarding likely impacts on the receiving water(s).

    page 24Surface water, Monitoring and reporting
  58. F13

    The environmental authority holder must notify the administering authority via WaTERS as soon as practicable and no later than 24 hours after cessation of a release event notified under condition F12. The release cessation notification must include the submission of written advice to the administering authority of the following information: a) release cessation date and time; b) receiving water(s) including the natural flow rate; c) volume of water released; and d) all in situ water quality monitoring results. NOTE: Successive or intermittent releases occurring within 24 hours of the cessation of any individual release can be considered part of a single release event and do not require individual notification for the purpose of compliance with conditions

    page 24Surface water, Monitoring and reporting
  59. F12

    and F13 and F14 and F15 and F16, provided the relevant details of the release are included within the notification provided in accordance with conditions F12 and F13 and F14 and F15 and F16.

    page 24Monitoring and reporting
  60. F14

    Within 28 days of notification under condition F13, the environmental authority holder must provide the administrating authority via WaTERS the following information in writing: a) all laboratory results from water quality monitoring; b) details regarding the compliance of the release with the conditions of Schedule F: Water of this environmental authority (i.e. contamination limits, natural flow, discharge volume); and c) any other matter(s) pertinent to the water release event.

    page 24Monitoring and reporting
  61. F15

    Notification of release event exceedance If the release limits defined in Table F2 Mine Affected Water Release Limits are exceeded, the environmental authority holder must notify the administering authority within 24 hours of receiving the results. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 24Surface water, Monitoring and reporting
  62. F16

    The environmental authority holder must, within 28 days of the notification provided in accordance with condition F15, provide a report to the administering authority via WaTERS detailing: a) the reason for the release; b) the location of the release; c) the total volume of the release and which (if any) part of this volume was non-compliant; d) the total duration of the release and which (if any) part of this period was non-compliant; e) all water quality monitoring results; f) any general observations; g) all calculations; and h) any other matters pertinent to the water release event.

    page 25Monitoring and reporting
  63. F17

    Receiving Environment Monitoring and Contaminant Trigger Levels The quality of the receiving waters must be monitored at the locations specified in Table F6 Receiving Water Upstream Background and Downstream Monitoring Points for each quality characteristic and at the monitoring frequency stated in Table F5 Receiving Waters Contaminant Trigger Levels and Table F3 Release Contaminant Trigger Investigation Levels.

    page 25Surface water, Monitoring and reporting
  64. F18

    If quality characteristic(s) of the receiving water at the downstream monitoring points exceed any of the trigger levels specified in Table F5 Receiving Waters Contaminant Trigger Levels during a release event the environmental authority holder must compare the downstream results to the upstream results in the receiving waters and: (1) where the downstream result is the same or a lower value than the upstream value for the quality characteristic then no action is to be taken; or (2) where the downstream results exceed the upstream results, complete an investigation into the potential for environmental harm and provide a written report to the administering authority in the within 28 days, outlining: (a) details of the investigations carried out; and (b) actions taken to prevent environmental harm. NOTE: Where an exceedance of a trigger level has occurred and is being investigated in accordance with F18(2) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Table F5 Receiving Waters Contaminant Trigger Levels Quality Characteristic Trigger Level Monitoring Frequency Daily during the release pH 6.5 to 9.0 Weekly during the release (pH units) 1,000 (80th percentile of data) Electrical Conductivity 560 (-S/cm) 250 Suspended Solids (mg/L) Sulphate (SO42-) (mg/L) Grab samples shall be taken only when safe to do so and in day light hours. Table F6 Receiving Waters Upstream Background and Downstream Monitoring Points Monitoring Point Receiving Waters Location Description Easting Northing (MP) (GDA94) (GDA94) Upstream Background Monitoring Points a -24.5903 149.9024 -24.7125 149.9746 AQ-DC04T Dawson River 270,000 metres upstream of the confluence Moura Weir between the Dawson River and Kianga Creek -24.3034 149.8086 -24.6946 149.9757 AQ-DCO5R Dawson River 300 metres upstream of the confluence between the Paranui Upstream Dawson River and Four Mile Creek Downstream Monitoring Points AQ-DN07T Dawson River 2000 metres downstream of the confluence

    page 25Surface water, Monitoring and reporting
  65. F19

    Receiving Environment Monitoring Program (REMP) The environmental authority holder must develop and implement a Receiving Environment Monitoring Program (REMP) to monitor, identify and describe any adverse impacts to surface water environmental values, quality and flows due to the authorised mining activity. This must include monitoring the effects of the mine on the receiving environment periodically (under natural flow conditions) and while mine affected water is being discharged from the site. For the purposes of the REMP, the receiving environment is the waters of the Dawson River. The REMP should encompass any sensitive receiving waters or environmental values downstream of the authorised mining activity that will potentially be directly affected by an authorised release of mine affected water.

    page 27Surface water, Monitoring and reporting
  66. F20

    The REMP must: a) assess the condition or state of receiving waters, including upstream conditions, spatially within the REMP area, considering background water quality characteristics based on accurate and reliable monitoring data that takes into consideration temporal variation (e.g. seasonality); b) be designed to facilitate assessment against water quality objectives for the relevant environmental values that need to be protected; c) include monitoring from background reference sites (e.g. upstream or background) and downstream sites from the release (as a minimum, the locations specified in Table F6 Receiving Water Upstream Background and Downstream Monitoring Points); d) specify the frequency and timing of sampling required in order to reliably assess ambient conditions and to provide sufficient data to derive site specific background reference values in accordance with the Queensland Water Quality Guidelines 2009. This should include monitoring during periods of natural flow irrespective of mine or other discharges; e) include monitoring and assessment of dissolved oxygen saturation, temperature and all water quality parameters listed in Table F2 Mine Affected Water Release Limits and Table F3 Release Contaminant Trigger Investigation Levels; f) include, where appropriate, monitoring of metals/metalloids in sediments (in accordance with ANZECC & ARMCANZ 2000, BATLEY and/or the most recent version of AS5667.1 Guidance on Sampling of Bottom Sediments); g) include, where appropriate, monitoring of macroinvertebrates in accordance with the AusRivas methodology, h) apply procedures and/or guidelines from ANZECC & ARMCANZ 2000 and other relevant guideline documents; i) describe sampling and analysis methods and quality assurance and control; and j) incorporate stream flow and hydrological information in the interpretations of water quality and biological data.

    page 27Surface water, Land and soil, Monitoring and reporting
  67. F21

    A report outlining the findings of the REMP, including all monitoring results and interpretations in accordance with conditions F19 and F20 must be prepared annually. This report must include the following: a) an assessment of background reference water quality; b) the condition of downstream water quality compared against water quality objectives; and c) the suitability of current discharge limits to protect downstream environmental values. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 27Monitoring and reporting
  68. F22

    Water reuse Mine affected water may be piped or trucked or transferred by some other means that does not contravene the conditions of this environmental authority and deposited into artificial water storage structures, such as farm dams or tanks, or used directly at properties owned by the environmental authority holder or a third party (with the written consent of the third party with agreed water quality limits).

    page 28Surface water, Regulated structures
  69. F23

    Water general All determinations of water quality and biological monitoring must be: a) performed by a person or body possessing appropriate experience and qualifications to perform the required measurements; b) made in accordance with methods prescribed in the latest edition of the administering authority's Monitoring and Sampling Manual; c) collected from the monitoring locations identified within this environmental authority, within ten hours of each other where possible; d) carried out on representative samples; and e) analysed at a laboratory accredited (e.g. NATA) for the method of analysis being used. Note: Condition F23 requires the Monitoring and Sampling Manual to be followed and where it is not followed because of exceptional circumstances this should be explained and reported with the results.

    page 28Monitoring and reporting
  70. F24

    The release of any contaminants as permitted by this environmental authority, directly or indirectly to waters, other than internal water management infrastructure that is installed and operated in accordance with a Water Management Plan that complies with conditions F26 to F27 inclusive: a) must not produce any visible discolouration of receiving waters; and b) must not produce any slick or other visible or odorous evidence of oil, grease or petrochemicals nor contain visible floating oil, grease, scum, litter or other objectionable matter.

    page 28Surface water
  71. F25

    Annual water monitoring reporting The following information must be recorded in relation to all water monitoring required under the conditions of this environmental authority and submitted to the administering authority in the specified format with each annual return: a) the date on which the sample was taken; b) the time at which the sample was taken; c) the monitoring point at which the sample was taken; d) the measured or estimated daily quantity of mine affected water released from all release points; e) the release flow rate at the time of sampling for each release point; f) the results of all monitoring and details of any exceedances of the conditions of this environmental authority; and g) water quality monitoring data must be provided to the administering authority in the specified electronic format upon request. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 28Surface water, Monitoring and reporting
  72. F26

    Water Management Plan A Water Management Plan must be developed by an appropriately qualified person(s) and implemented for all mining activities. The Water Management Plan must address, as a minimum, the following: a) provide for effective management of actual and potential environmental impacts resulting from water management associated with the mining activity carried out under this environmental authority; and b) be developed in accordance with administering authority's guideline Preparation of water i. a study of the source of contaminants; ii. a water balance model for the site; iii. a water management system for the site; iv. measures to manage and prevent saline drainage; v. measures to manage and prevent acid rock drainage; vi. contingency procedures for emergencies; and vii. a program for monitoring and review of the effectiveness of the Water Management Plan.

    page 29Monitoring and reporting
  73. F27

    The Water Management Plan must be reviewed each calendar year by an appropriately qualified person(s).

  74. F28

    Temporary interference with waterways Destroying native vegetation, excavating, or placing fill in a watercourse, lake or spring necessary for and associated with mining operations must be undertaken in accordance with the latest version of the Department of Regional Development, Manufacturing and Water's (or its successor's) Guideline - `Riverine protection permit exemption requirements' (WSS/2013/726).

    page 29Surface water, Biodiversity
  75. F29

    Saline drainage The environmental authority holder must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of saline drainage.

  76. F30

    Acid rock drainage The environmental authority holder must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of acid rock drainage.

  77. F31

    Stormwater and water sediment controls An Erosion and Sediment Control Plan must be developed by an appropriately qualified person and implemented for all stages of the mining activities on the site to minimise erosion and the release of sediment to receiving waters and contamination of stormwater.

    page 29Surface water, Land and soil
  78. F32

    Stormwater, other than mine affected water, is permitted to be released to waters from: a) erosion and sediment control structures that are installed and operated in accordance with the Erosion and Sediment Control Plan required by condition F31; and b) water management infrastructure that is installed and operated, in accordance with a Water Management Plan that complies with conditions F26 to F27 inclusive, for the purpose of ensuring water does not become mine affected water.

    page 29Surface water, Land and soil
  79. G1

    Assessment of consequence category The consequence category of any structure must be assessed by a suitably qualified and experienced person, in accordance with the Manual for Assessing Consequence Categories and Hydraulic a) prior to the design and construction of the structure, if it is not an existing structure; or b) prior to any change in its purpose or the nature of its stored contents.

    page 30Regulated structures
  80. G2

    A consequence assessment report and certification must be prepared for each structure assessed and the report may include a consequence assessment for more than one structure.

    page 30Monitoring and reporting
  81. G3

    Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for Assessing Consequence Categories and Hydraulic

    page 30Regulated structures
  82. G4

    Design and construction of a regulated structure Conditions G5 to G9 inclusive do not apply to existing structures. NOTE: Construction of a dam includes modification of an existing dam - see definitions.

    page 30Regulated structures
  83. G5

    All regulated structures must be designed by, and constructed under the supervision of, a suitably qualified and experienced person in accordance with the requirements of the Manual for Assessing NOTE: Certification of design and construction may be undertaken by different persons.

    page 30Regulated structures
  84. G6

    Construction of a regulated structure is prohibited unless the environmental authority holder has submitted to the administering authority: a) a consequence category assessment report, design and design plan that has been certified by a suitably qualified and experienced person; and b) operational plans for the structure.

    page 30Regulated structures, Monitoring and reporting
  85. G7

    Certification must be provided by the suitably qualified and experienced person who oversees the preparation of the design plan in the form set out in the Manual for Assessing Consequence Register of Regulated Structures.

    page 30Regulated structures
  86. G8

    Regulated structures must: a) be designed and constructed in accordance with and conform to the requirements of the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures b) be designed and constructed with due consideration given to ensuring that the design integrity would not be compromised on account of: i. floodwaters from entering the regulated dam from any watercourse or drainage line; and ii. wall failure due to erosion by floodwaters arising from any watercourse or drainage line. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North c) for regulated dams associated with a failure to contain - seepage, have the floor and sides of the dam designed and constructed to prevent or minimise the passage of the wetting front and any entrained contaminants through either the floor or sides of the dam during the operational life of the dam and for any period of decommissioning and rehabilitation of the dam.

    page 30Rehabilitation, Surface water, Regulated structures, Land and soil
  87. G9

    Certification by the suitably qualified and experienced person who supervises the construction must be submitted to the administering authority on the completion of construction of the regulated structure, and state that: a) the 'as constructed' drawings and specifications meet the original intent of the design plan for that regulated structure; and b) construction of the regulated structure is in accordance with the design plan.

    page 31Regulated structures
  88. G10

    Operation of a regulated structure Operation of a regulated structure, except for an existing structure, is prohibited unless the environmental authority holder has submitted to the administering authority: a) one paper copy and one electronic copy of the design plan and certification of the `design plan' in accordance with condition G6; b) a set of `as constructed' drawings and specifications; c) certification of those `as constructed drawings and specifications' in accordance with condition G9; d) where the regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, a copy of the certified system design plan; e) the requirements of this environmental authority relating to the construction of the regulated structure have been met; f) the environmental authority holder has entered the details, required under this environmental authority, into the Register of Regulated Structures; and g) there is a current operational plan for the regulated structures.

    page 31Regulated structures
  89. G11

    For existing structures that are regulated structures: a) where the existing structure that is a regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, the environmental authority holder must submit to the administering authority within twelve (12) months of the commencement of this condition a copy of the certified system design plan including that structure; and b) there must be a current operational plan for the existing structures.

    page 31Regulated structures
  90. G12

    Each regulated structure must be maintained and operated, for the duration of its operational life until decommissioned and rehabilitated, in a manner that is consistent with the current operational plan and, if applicable, the current design plan and associated certified `as constructed' drawings.

    page 31Rehabilitation, Regulated structures
  91. G13

    Mandatory Reporting Level Conditions G14 to G17 inclusive only apply to regulated structures which have not been certified as low consequence category for `failure to contain - overtopping'.

    page 31Regulated structures, Monitoring and reporting
  92. G14

    The Mandatory Reporting Level (MRL) must be marked on a regulated dam in such a way that, during routine inspections of that dam, it is clearly observable. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 31Regulated structures, Monitoring and reporting
  93. G15

    The environmental authority holder must, as soon as practical and within 48 hours of becoming aware, notify the administering authority when the level of the contents of a regulated dam reaches the MRL.

    page 32Regulated structures, Monitoring and reporting
  94. G16

    The environmental authority holder must immediately on becoming aware that the MRL has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated dam.

    page 32Regulated structures
  95. G17

    The environmental authority holder must record any changes to the MRL in the Register of Regulated Structures.

    page 32Regulated structures, Monitoring and reporting
  96. G18

    Design Storage Allowance The environmental authority holder must assess the performance of each regulated dam or linked containment system over the preceding November to May period based on actual observations of the available storage in each regulated dam or linked containment system taken prior to 1 July of each year.

    page 32Regulated structures
  97. G19

    By 1 November of each year, storage capacity must be available in each regulated dam (or network of linked containment systems with a shared DSA volume), to meet the Design Storage Allowance (DSA) volume for the dam (or network of linked containment systems).

    page 32Regulated structures
  98. G20

    The environmental authority holder must notify the administering authority as soon as possible and within forty-eight (48) hours of becoming aware that the regulated dam (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year.

    page 32Regulated structures, Monitoring and reporting
  99. G21

    The environmental authority holder must, immediately on becoming aware that a regulated dam (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated dam or linked containment systems.

    page 32Regulated structures
  100. G22

    Annual inspection report Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person.

    page 32Regulated structures, Monitoring and reporting
  101. G23

    At each annual inspection, the condition and adequacy of all components of the regulated structure must be assessed and a suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and include recommended actions to ensure the integrity of the regulated structure.

    page 32Regulated structures, Monitoring and reporting
  102. G24

    The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for Assessing Consequence Categories and Hydraulic

    page 32Regulated structures, Monitoring and reporting
  103. G25

    The environmental authority holder must: a) within 20 business days of receipt of the annual inspection report, provide to the administering authority: i. the recommendations section of the annual inspection report; and ii. if applicable, any actions being taken in response to those recommendations; and b) if, following receipt of the recommendations and (if applicable) actions, the administering authority requests a full copy of the annual inspection report from the environmental authority Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North holder, provide this to the administering authority within 10 business days of receipt of the request.

    page 32Monitoring and reporting
  104. G26

    Transfer arrangements The environmental authority holder must provide a copy of any reports, documentation and certifications prepared under this environmental authority, including but not limited to any Register of Regulated Structures, consequence assessment, design plan and other supporting documentation, to a new holder on transfer of this authority.

    page 33Regulated structures, Monitoring and reporting
  105. G27

    Decommissioning and rehabilitation Dams must not be abandoned but be either: a) decommissioned and rehabilitated to achieve compliance with condition G28; or b) be left in-situ for a beneficial use(s) provided that: i. it no longer contains contaminants that will migrate into the environment; and iii. it contains water of a quality that is demonstrated to be suitable for its intended beneficial use(s); and iv. the administering authority, the environmental authority holder and the landholder agree in writing that the dam will be used by the landholder following the cessation of the environmentally relevant activity(ies).

    page 33Rehabilitation, Regulated structures
  106. G28

    After decommissioning, all significantly disturbed land caused by the carrying out of the environmentally relevant activity(ies) must be rehabilitated to meet the following final acceptance criteria: a) the landform is safe for humans and fauna; b) the landform is stable with no subsidence or erosion gullies for at least three (3) years; c) any contaminated land (e.g. contaminated soils) is remediated and rehabilitated d) not allowing for acid mine drainage; or e) there is no ongoing contamination to waters (including groundwater); f) rehabilitation is undertaken in a manner such that any actual or potential acid sulphate soils on the area of significant disturbance are treated to prevent or minimise environmental harm in accordance with the Instructions for the treatment and management of acid sulfate soils (2001); g) all significantly disturbed land is reinstated to the pre-disturbed soil suitability class; h) for land that is not being cultivated by the landholder: i. groundcover, that is not a declared pest species is established and self-sustaining ii. vegetation of similar species richness and species diversity to pre-selected analogue sites is established and self-sustaining, and iii. the maintenance requirements for rehabilitated land is no greater than that required for the land prior to its disturbance caused by carrying out the mining activity(ies). i) for land that is to be cultivated by the landholder, cover crop is revegetated, unless the landholder will be preparing the site for cropping within 3 months of mining activities being completed. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 33Rehabilitation, Groundwater, Subsidence, Land and soil, Biodiversity
  107. G29

    Register of Regulated Structures A Register of Regulated Structures must be established and maintained by the environmental authority holder for each regulated structure.

    page 34Regulated structures
  108. G30

    The environmental authority holder must provisionally enter the required information in the Register of Regulated Structures when a design plan for a regulated structure is submitted to the administering authority.

    page 34Regulated structures
  109. G31

    The environmental authority holder must make a final entry of the required information in the Register of Regulated Structures once compliance with condition G10 and G11 has been achieved.

    page 34Regulated structures
  110. G32

    The environmental authority holder must ensure that the information contained in the Register of Regulated Structures is current and complete on any given day.

    page 34Regulated structures
  111. G33

    All entries in the Register of Regulated Structures must be approved by the chief executive officer for the environmental authority holder, or their delegate, as being accurate and correct.

    page 34Regulated structures
  112. G34

    The environmental authority holder must, at the same time as providing the annual return, supply to the administering authority a copy of the records contained in the Register of Regulated Structures, in the electronic format required by the administering authority.

    page 34Regulated structures, Monitoring and reporting
  113. G35

    Notification of affected persons All affected persons must be provided with a copy of the emergency action plan in place: a) for any new regulated structure constructed after 1 April 2025, prior to the operation of the new regulated structure; and b) for any existing structures that are regulated structures, if the emergency action plan is amended, within 5 business days of it being amended.

    page 34Regulated structures, Monitoring and reporting
  114. G36

    Transitional arrangements All existing structures that have not been assessed in accordance with either, the Manual or the former Manual for Assessing Hazard Categories and Hydraulic Performance of Dams, must be assessed and certified in accordance with the Manual within 6 months of amendment of the environmental authority adopting this schedule.

    page 34Regulated structures
  115. G37

    All existing structures must subsequently comply with the timetable for any further assessments in accordance with the Manual specified in Table G1 Transitional Requirements for Existing Structures, depending on the consequence category for each existing structure assessed in the most recent previous certification for that structure.

    page 34Regulated structures
  116. G38

    Table G1 Transitional Requirements for Existing Structures ceases to apply for a structure once any of the following events has occurred: a) it has been brought into compliance with the hydraulic performance criteria applicable to the structure under the `Manual for Assessing Consequence Categories and Hydraulic b) it has been decommissioned; or c) it has been certified as no longer being assessed as a regulated structure. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 34Regulated structures
  117. G39

    Certification of the transitional assessment required by G36 and G37 (as applicable) must be provided to the administering authority within six (6) months of amendment of the environmental authority adopting this schedule. Table G1 Transitional Requirements for Existing Structures Transition period required for existing structures to achieve the requirements of the Manual for Assessing Compliance with Criteria High Significant Low >90% and a history of good No transition required No transition required No transitional conditions compliance performance in apply. Review consequence assessment every 7 years. last 5 years >70% to 90% Within 7 years, unless Within 10 years, unless No transitional conditions otherwise agreed with the otherwise agreed with the apply. Review consequence administering authority, based administering authority, based assessment every 7 years. on no history of unauthorised on no history of unauthorised releases. releases. 50 to 70% Within 5 years unless Within 7 years unless Review consequence otherwise agreed with the otherwise agreed with the assessment every 7 years. administering authority, based administering authority, based on no history of unauthorised on no history of unauthorised releases. releases. 50% Within 5 years or as per Within 5 years or as per Review consequence compliance requirements compliance requirements assessment every 5 years. (e.g. TEP timing) (e.g. TEP timing) Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Schedule H: Sewage Treatment Condition Condition number

  118. H1

    Treated sewage effluent The cumulative total daily peak design capacity of the sewage treatment plant/s must not exceed 1500 equivalent persons (EP). Small package plants and/or septic systems, each with a daily peak design capacity less than 21EP, are not included in the cumulative total daily peak design capacity.

  119. H2

    Treated sewage effluent must not be directly released from the sewage treatment plant/s to any waters. Note: `waters' does not include structures associated with the mine affected water management system.

    page 36Surface water
  120. H3

    Treated sewage effluent may be: a) released to the mine affected water management system for mixing with other mine affected water; b) released to land via a sub-surface infiltration trench; c) irrigated; d) sprayed for dust suppression or firefighting or evaporation; or e) removed as waste.

    page 36Surface water, Air, Waste
  121. H4

    Treated sewage effluent that is released in accordance with condition H3(a) and has mixed with other mine affected water must be managed as mine affected water in accordance with the conditions of this environmental authority.

    page 36Surface water
  122. H5

    Treated sewage effluent that is released in accordance with condition H3(b) or H3(c) must: a) not damage vegetation; b) not result in surface ponding of effluent; c) not result in run-off of treated sewage effluent to waters; and d) for any sewage treatment plant that has a daily peak design capacity of greater than 21EP, must not be outside of the areas indicated in Figure 3 STP Sub-Surface Infiltration and Irrigation Areas.

    page 36Biodiversity
  123. H6

    Treated sewage effluent released in accordance with condition H3(a) or H3(b) or H3(c) or H3(d) from any sewage treatment plant that has a daily peak design capacity of greater than 21EP must be monitored: a) from the sewage treatment plant/s; b) for the quality characteristics specified in Table H1 Treated Sewage Effluent Monitoring Requirements; and c) at the frequency specified in Table H1 Treated Sewage Effluent Monitoring Requirements. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 36Monitoring and reporting
  124. H7

    If treated sewage effluent is being released in accordance with condition H3(b) and/or H3(c): a) the results of monitoring in accordance with condition H6 must not exceed the release limits specified in Table H2 Treated Sewage Effluent Contaminant Release Limits; and b) the release must not cause spray drift or over spray to any sensitive place or commercial place; and c) the daily volume of treated effluent irrigated must be measured and records kept.

    page 37Monitoring and reporting
  125. H8

    If the release limits specified in Table H2 Treated Sewage Effluent Contaminant Release Limits are exceeded in accordance with condition H7(a), the environmental authority holder must notify the administering authority in accordance with conditions A10 and A11. Table H1 Treated Sewage Effluent Monitoring Requirements Quality Characteristic Units Monitoring Frequency 5-day Biochemical Oxygen Demand (uninhibited) mg/L pH pH units Monthly Colonies per 100mL Monthly Thermotolerant coliforms Monthly Total nitrogen mg/L Monthly mg/L Monthly Total phosphorous Table H2 Treated Sewage Effluent Contaminant Release Limits Quality Characteristic Release Limit Units Limit Type 50 mg/L Maximum 5-day Biochemical Oxygen Demand (uninhibited) pH units pH 6.0 to 9.0 Colonies per 100mL Range 1000 mg/L Maximum Thermotolerant coliforms, based on the average of a minimum 40 mg/L Maximum number of five samples collected 15 Maximum Total Nitrogen Total Phosphorus Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Schedule I: Groundwater Condition Condition number

    page 37Groundwater, Monitoring and reporting
  126. I1

    Contaminants from the activity must not be released to groundwater.

    page 38Groundwater
  127. I2

    Bore Construction, Maintenance and Decommissioning The construction, maintenance, operation and decommissioning of each groundwater monitoring bore must be undertaken by an appropriately qualified person in a manner that: a) prevents contaminants entering the groundwater; and b) ensures representative groundwater samples from the target hydrogeological unit; and c) maintains the hydrogeological environment within the hydrogeological unit.

    page 38Groundwater, Monitoring and reporting
  128. I3

    A bore report must be kept for each monitoring bore which includes: a) a unique identification reference number and geographic coordinate location; b) construction information including but not limited to the depth of bore, depth and length of casing, depth and length of screening and bore sealing details; c) stratigraphy and target hydrogeological unit of the bore; and d) depth at which groundwater was intercepted and the final standing water level (SWL) after bore development.

    page 38Groundwater, Monitoring and reporting
  129. I4

    The environmental authority holder must install, commission and maintain groundwater monitoring bores at the locations specified in Table I1 Groundwater monitoring locations and frequency.

    page 38Groundwater, Monitoring and reporting
  130. I5

    Groundwater monitoring Groundwater must be monitored: a) at the location and frequencies defined in Table I1 Groundwater monitoring locations and frequency; and b) for the quality characteristics specified in in Table I2 Groundwater quality triggers; and c) for the standing water levels (SWLs) stated in Table I3 Groundwater standing water level trigger threshold.

    page 38Groundwater, Monitoring and reporting
  131. I6

    Monitoring and sampling must be carried out in accordance with the requirements of the latest version of the following documents unless otherwise approved by the administering authority: a) `Monitoring and Sampling Manual: Environmental Protection (Water) Policy', Department of Environment and Science, 2018; b) `Groundwater Sampling and Analysis - A Field Guide' (2009:27 GeoCat#6890.1); and c) Australian Standard AS/NZS 5667.11:1998 Water quality - Sampling - Part 11: Guidance on sampling of groundwaters.

    page 38Groundwater, Monitoring and reporting
  132. I7

    The monitoring data collected in accordance with condition I5 must be submitted to the administering authority, via WaTERS, annually on 1 April for the previous calendar year. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 38Monitoring and reporting
  133. I8

    Groundwater quality trigger exceedance Monitoring results from groundwater bores identified in Table I1 Groundwater monitoring locations and frequency must not exceed any of the trigger levels stated in Table I2 Groundwater quality triggers on 3 consecutive monitoring occasions.

    page 39Groundwater, Monitoring and reporting
  134. I9

    If monitoring undertaken in accordance with condition I5 demonstrates exceedance of groundwater quality triggers in Table I2 Groundwater quality triggers on 3 consecutive monitoring occasions, the environmental authority holder must: a) notify the administering authority, via WaTERS, within 24 hours of receiving the results; b) provide a report to the administering authority, via WaTERS, within 20 business days of the notification made in accordance with condition I9(a), that determines if mining activities are a potential cause or contributor to the exceedance; and c) if the report determines that mining activities are a potential cause or contributor to the exceedance, provide an investigation report to the administering authority, via WaTERS, within 20 business days of the report provided in accordance with condition I9(b), that includes: i. determination of whether environmental harm has occurred; and ii. any action required to mitigate the environmental harm.

    page 39Groundwater, Monitoring and reporting
  135. I10

    Standing water level trigger exceedance Monitoring results from groundwater bores identified in Table I1 (Groundwater monitoring locations and frequency) must not exceed any of SWL trigger levels stated in Table I3 (Groundwater standing water level trigger threshold).

    page 39Groundwater, Monitoring and reporting
  136. I11

    If monitoring undertaken in accordance with condition I5 demonstrates exceedance of the thresholds in Table I3 Groundwater standing water level trigger threshold, the environmental authority holder must; a) notify the administering authority, via WaTERS within 24 hours of receiving the results; b) provide a report to the administering authority, via WaTERS, within 20 business days of the notification made in accordance with condition I11(a), that determines if mining activities are a potential cause or contributor to the exceedance; and c) if the report determines that mining activities are a potential cause or contributor to the exceedance, provide an investigation report to the administering authority, via WaTERS, within 20 business days of the report provided in accordance with condition I11(b), that includes: i. determination of any impacts to environmental values and/or water users as a result of the exceedance; and ii. any action required to mitigate the impacts.

    page 39Groundwater, Monitoring and reporting
  137. I12

    Groundwater Monitoring and Management Program The environmental authority holder must develop and implement a Groundwater Monitoring and Management Program (GMMP) for all mining activities. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 39Groundwater, Monitoring and reporting
  138. I13

    The GMMP required by condition I12 must: a) provide a hydrogeological numerical groundwater model in accordance with the most recent version of the `Australian Groundwater Modelling Guidelines' (2012); b) include all hydrogeological units potentially impacted by the activities authorised under this environmental authority; c) detail groundwater levels in all identified hydrogeological units present across and adjacent to the site to confirm existing groundwater flow paths; and d) identify all potential sources of contamination to groundwater from the activities; and e) identify all environmental values that may be impacted; and f) describe the groundwater monitoring and data analysis that will be undertaken to achieve the following objectives: i. detect impacts to groundwater quality and standing water level (SWL) due to the activities authorised under this environmental authority; and ii. determine trends in groundwater quality and SWL; and g) document groundwater management and monitoring methodologies undertaken for the duration of all the activities authorised under this environmental authority; and h) provide an appropriate quality assurance and quality control program; and i) include a review process to identify improvements to the program that includes addressing any comments provided by the administering authority.

    page 40Groundwater, Monitoring and reporting
  139. I14

    A review report for the GMMP required by condition I12 must be prepared by 30 April 2028 and every 2 years thereafter, and include: a) an analysis, including an assessment of trends, of the all the groundwater quality and SWL monitoring data for all groundwater bores listed within Table I1 Groundwater monitoring locations and frequency; b) an assessment of the adequacy of the conceptual groundwater model to accurately determine contaminant transport and changes to SWL; c) an assessment of any impacts on groundwater quality and SWL due to the mining activities; d) an assessment of any interactions with, or impacts to, surface water resulting from changes to groundwater quality and SWL due to the mining activities; e) recommendations, if any, for the environmental authority holder to complete to address any inadequacy or impacts identified by (a) through (d) of this condition.

    page 40Groundwater, Surface water, Monitoring and reporting
  140. I15

    The groundwater model required by condition I13(a) must be reviewed and updated by an appropriately qualified person by 30 April 2030 and every 4 years thereafter. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 40Groundwater
  141. I16

    The groundwater model review in condition I15 must: a) include all hydrogeological units potentially impacted by the activities authorised under this environmental authority; b) be undertaken in accordance with the most recent version of the `Australian Groundwater Modelling Guidelines' (2012); c) be validated and recalibrated with all recent monitoring data; d) be documented in a report that includes: i. changes to predicted end of mine life and post mining standing water level (SWL) in all major hydrogeological units; ii. changes to the model predictions of impacts to environmental values; iii. where residual voids are proposed, the changes to predicted post mining void water levels and water quality; and iv. recommended amendments to environmental authority conditions.

    page 41Groundwater, Monitoring and reporting
  142. I17

    Within 20 business days of preparing the review report under condition I14 and/or I6(d), the environmental authority holder must provide to the administering authority: a) the review report/s; b) if applicable, any actions being taken by the environmental authority holder to address the recommendations of the review report; and c) if action is not being taken to address a recommendation, the environmental authority holder must provide justification for not taking action.

    page 41Monitoring and reporting
  143. I18

    Upon submission of the report required by condition I17, all comments given by the administering authority must be considered for incorporation into the GMMP required by condition I13. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 41Monitoring and reporting
  144. I19

    Transitional arrangements Unless an alternate timeframe is agreed to by the administering authority, the environmental authority holder must: a) for groundwater monitoring bores identified as "existing bores" in Table I1 Groundwater Monitoring Locations and Frequency: i. by 30 April 2025, commence monitoring in accordance with condition I5; and i. by 30 April 2026; submit a report to the administrating authority. The report must propose interim groundwater trigger values to populate Table I2 Groundwater quality triggers, based on a minimum of eight (8) sampling events per bore; and ii. by 30 April 2026, submit a report to the administering authority. The report must propose groundwater standing water level trigger thresholds, derived from the results of the groundwater model required by condition I13(a), to populate Table I3 Groundwater standing water level trigger thresholds; and iii. by 30 April 2027; submit a report to the administrating authority. The report must review the interim groundwater trigger values and propose revised groundwater trigger values to populate Table I2 Groundwater quality triggers based on a minimum of eighteen (18) sampling events per bore; and b) for groundwater monitoring bores identified as "new bores" in Table I1 Groundwater Monitoring Locations and Frequency: i. by 31 May 2025, provide planed location coordinates of new bores to administering authority; and ii. by 31 July 2026, install and commission groundwater monitoring bores in accordance with condition I4 and provide bore reports to the administering authority in accordance with condition I3; and iii. by 31 July 2026, commence monitoring in accordance with condition I5; and iv. by 31 July 2027, submit a report to the administering authority. The report must propose interim groundwater trigger values to populate Table I2 Groundwater quality triggers, based on a minimum of eight (8) sampling events per bore; and v. by 31 July 2027, submit a report to the administering authority. The report must propose groundwater standing water level trigger thresholds, derived from the results of the groundwater model required by condition I13(a), to populate Table I3 Groundwater standing water level trigger thresholds; and vi. by 31 July 2028; submit a report to the administrating authority. The report must review the interim groundwater trigger values and propose revised groundwater trigger values to populate Table I2 Groundwater quality triggers based on a minimum of eighteen (18) sampling events per bore; and c) by 30 April 2028, develop and implement the Groundwater Monitoring and Management Program in accordance with condition I12. Note: The reports required by condition I19(a)(ii), I19(a)(iv), I19(b)(iv) and I19(b)(vi) must consider the requirements of the administering authority's, or its successor's, most recent edition of the Guideline: "Using monitoring data to assess groundwater quality and potential environmental impacts" (DES, 2021). Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North

    page 42Groundwater, Monitoring and reporting
  145. F1

    of the environmental authority; and f) does not include a landholder or other party who by written agreement with the environment authority holder has declined to be notified for the purpose of this condition. Protected area means a) a protected area under the Nature Conservation Act 1992; or b) a marine park under the Marine Parks Act 1992; or c) a World Heritage Area. Progressive rehabilitation means rehabilitation (defined below) undertaken progressively or a staged approach to rehabilitation as mining operations are ongoing. Receiving environment, in relation to an activity that causes or may cause environmental harm, means the part of the environment to which the harm is, or may be, caused. The receiving environment includes (but is not limited to): a) a watercourse; b) groundwater; c) land; and d) sediments. Receiving waters means the waters into which this environmental authority authorises releases of mine affected water. Reference site (or analogue site) may reflect the original location, adjacent area or another area where rehabilitation success has been completed for a similar biodiversity. Details of the reference site may be as photographs, computer generated images and vegetation models etc. Permit OFFICIAL Environmental authority EPML00565813 - Dawson Central and North Register of Regulated Structures includes: a) date of entry in the register; b) name of the dam, its purpose and intended/actual contents; c) the consequence category of the dam as assessed using the Manual for Assessing Consequence Categories and d) dates, names, and reference for the design plan plus dates, names, and reference numbers of all document(s) lodged as part of a design plan for the dam; e) name and qualifications of the suitably qualified and experienced person who certified the design plan and 'as constructed' drawings; f) for the regulated dam, other than in relation to any levees - i. the dimensions (metres) and surface area (hectares) of the dam measured at the footprint of the dam; ii. coordinates (latitude and longitude in GDA94) within five metres at any point from the outside of the dam including its storage area iii. dam crest volume (megalitres); iv. spillway crest level (metres AHD). v. maximum operating level (metres AHD); vi. storage rating table of stored volume versus level (metres AHD); vii. design storage allowance (megalitres) and associated level of the dam (metres AHD); viii. mandatory reporting level (metres AHD); g) the design plan title and reference relevant to the dam; h) the date construction was certified as compliant with the design plan; i) the name and details of the suitably qualified and experienced person who certified that the constructed dam was compliant with the design plan; j) details of the composition and construction of any liner; k) the system for the detection of any leakage through the floor and sides of the dam; l) dates when the regulated dam underwent an annual inspection for structural and operational adequacy, and to ascertain the available storage volume for 1 November of any year; m) dates when recommendations and actions arising from the annual inspection were provided to the administering authority; and n) dam water quality as obtained from any monitoring required under this authority as at 1 November of each year.

    page 56Rehabilitation, Groundwater, Surface water, Regulated structures, Land and soil, Biodiversity, Monitoring and reporting