Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Coal environmental authority

EPML00353513 · Hancock Coal Pty Ltd

Coal environmental authority EPML00353513 (Hancock Coal Pty Ltd), Granted - Not Effective. 254 conditions indexed. No PRC plan.

Status
Granted - Not Effective
Holders
Hancock Coal Pty Ltd
Tenures
ML70426
PRC plan
None
How it was read
Numbered conditions
Register
Register record · Instrument PDF

Conditions

254 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    Provide to the administering authority financial assurance for the amount and in the form acceptable to the administering authority in accordance with the most recent edition of the administering authority's Guideline- Calculating financial assurance for mining projects, before the proposed mining activities can commence or be varied .

  2. A2

    The amount of financial assurance must be reviewed by the holder of this environmental authority when a plan of operations is amended or replaced or the environmental authority is amended. Coal Extraction

  3. A3

    The environmental authority holder is approved for a coal extraction rate of up to 45 million tonnes per annum (Mtpa) of run-of-mine (ROM) ore in accordance with this environmental authority. Maintenance of measures, plant and equipment

  4. A4

    The environmental authority holder must: a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) maintain such measures, plant and equipment in a proper and efficient condition; and operate such measures, plant and equipment in a proper and efficient manner. AS No change, replacement or alteration of any plant or equipment is permitted if the change, replacement or alteration increases, or is likely to substantially increase, the risk of unlawful environmental harm caused by the mining activities. NOTE: Change in this case does not refer to trivial changes e.g. a larger and stronger item of equipment replaces a small and outdated item of equipment, it takes up a slightly larger area (ie. Creating a larger area of disturbance, covered by the plan of operations). Monitoring and records AS Except where specified otherwise in another condition of this authority, all monitoring records or reports required by this environmental authority must be kept for a period of not less than 5 years.

    page 4Monitoring and reporting
  5. A7

    Upon request from the administering authority, copies of monitoring records and reports must be made available and/or provided to the administering authority's nominated office within 10 business days or by an alternative timeframe agreed between the administering authority and the holder. AS Any management or monitoring plans, systems or programs required to be developed and implemented by a condition of this environmental authority must be reviewed for effectiveness in minimising the likelihood of environmental harm on an annual basis, and amended promptly if required, unless a particular review date and amendment program is specified in the plan, system or program. NOTE: Change in this case does not refer to trivial changes e.g. a larger and stronger item of equipment replaces a small and outdated item of equipment, it takes up a slightly larger area (ie. Creating a larger area of disturbance, covered by the plan of operations). Notification of emergencies, incidents and exceptions

    page 4Monitoring and reporting
  6. A9

    The holder of this environmental authority must notify the administering authority by written notification within 24 hours, after becoming aware of any emergency or incident which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with the conditions of this environmental authority. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

    page 4Monitoring and reporting
  7. A1

    0 The holder of this environmental authority must notify the administering authority by written notification within 24 hours, after becoming aware of any emergency, incident or information about circumstances which results or may result in environmental harm not in accordance with the conditions of this environmental authority or a contravention of the conditions of this environmental authority.

    page 5Monitoring and reporting
  8. A11

    Not more than 10 business days following the initial notification of an emergency, incident or information about circumstances which result or may result in environmental harm or the release of contaminants, written advice must be provided to the administering authority in relation to: a) available results and interpretation of any samples taken and analysed; and b) proposed actions to prevent a recurrence of the emergency or incident;

    page 5Monitoring and reporting
  9. A12

    The notification in conditions A9 and A10 must include, but not be limited to, the following: a) The environmental authority number and name of the holder; b) The name and telephone number of the designated contact person; c) The location of the emergency or incident; d) The date and time of the emergency or incident; e) The time the holder of the environmental authority became aware of the emergency or incident; f) Where known: i. the estimated quantity and type of substances involved in the emergency or incident; ii. the actual or potential cause of the emergency or incident; iii. a description of the nature and effects of the emergency or incident including environmental risks, and any risks to public health or livestock; g) Any sampling conducted or proposed, relevant to the emergency or incident; h) Immediate actions taken to prevent or mitigate any further environmental harm caused by the emergency or incident; and i) What notification of stakeholders who may be affected by the emergency or incident has occurred or is being undertaken. Risk Management

    page 5Monitoring and reporting
  10. A13

    The holder of this environmental authority must develop and implement a risk management system for mining activities which conforms to the Standard for Risk Management (15031000:2009) within 3 months of issue of Environmental Authority. NOTE: Implementation of a risk management system is not a defence against a breach of any other condition of this environmental authority. Emergency Response and Contingency Planning

  11. A14

    An emergency response/contingency plan must be developed and implemented within the current plan of operations to manage unacceptable risks identified in the risk management system or the associated monitoring. 5 P~O~ Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310

    page 5Monitoring and reporting
  12. A15

    The emergency response/contingency plan must address the following matters: a) response procedures to be implemented to reduce the likelihood of environmental harm from arising from incidents of unacceptable risk; b) response procedures to minimise the extent and duration of environmental harm by an incident; c) the practices and procedures to be employed to restore the environment or mitigate any environmental impact caused; d) a description of the resources to be used in response to an incident; e) the training of staff that will be called upon to respond to incidents; f) procedures to investigate the cause of any incidents, including releases, and where necessary, implement remedial actions to reduce the likelihood of recurrence of similar events; g) the provision and availability of documented procedures to staff attending any incident to enable them to effectively respond; and h) timely and accurate reporting of the circumstance and nature of incidents to the administering authority. Third Party Audit

    page 6Monitoring and reporting
  13. A16

    The holder of the environmental authority must nominate an appropriate third party auditor to audit compliance with the conditions of this environmental authority within 1 year of the commencement of this environmental authority, and then at regular intervals not exceeding 3 years.

  14. A17

    The holder must, at its cost, arrange for independent certification by a third part auditor of findings of the audit report required under condition A16.

    page 6Monitoring and reporting
  15. A18

    Within ninety days of completing the audit, provide a written report to the administering authority detailing any non-compliance issues that were found (if no non-compliance issues were found this should be stated in the report). If non-compliance issues were found the report must also address: a) actions taken by the holder of this environmental authority to ensure compliance with this environmental authority; and b) actions taken to prevent a recurrence of non-compliance.

    page 6Monitoring and reporting
  16. A19

    Where a condition of this environmental authority requires compliance with a standard published externally to this environmental authority and the standard is amended or changed subsequent to the issues of this environmental authority the holder of this environmental authority must: a) comply with the amended or changed standard within 2 years of the amendment or change being made, unless a different period is specified in the amended standard or relevant legislation; and b) until compliance with the amended or changed standard is achieved, continue to remain in compliance with the standard that was current immediately prior to the relevant amendment or change. Activity

  17. A20

    Land subject to mining activities, works previously approved under MDL 285, irrespective of its termination; and early works must be rehabilitated to a non polluting, safe, stable and self sustaining landform.

    page 6Rehabilitation
  18. A21

    Contaminants must not be released to the receiving environment unless they are in accordance with the contaminant limits authorised by this environmental authority.

  19. A22

    This environmental authority authorised environmental harm referred to in the conditions. Where no condition or this environmental authority is silent on matter, the lack of a condition or silence does not authorise environmental harm. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

  20. A23

    The authorised mine domains and identified areas associated with each domain are listed in Table 1: Mining Domains and Figure 1: Mining Domains. The domains must not exceed the maximum disturbance areas listed in Table 1: Mining Domains and Figure 1: Mining Domains. NOTE: Variation of mining activities to those identified in Table 1: Mining Domains is considered to be in accordance with these conditions as long as the variation does not cause a significant increase in environmental harm. NOTE: The extent of a domain relates to the domain as a whole, including major features, rather than each use that forms the domain. The major features are listed in the Sub Domain column of Table 1: Mining Domains. 7 PROT~ Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Table 1: Mining Domains Mine Domain Sub Domain Tenure Type and Location (central coordinates) Maximum Number disturbance I Pits and Mine Waste Easting Northing area (ha) 11 . ML70426 Central portion of the mining lease: running 16,447 north to south Refer to Figure 1 I PitsNoids/ Overburden ML70426 445,644.9 7,431,237.6 ' ML70426 448,265.5 l' and Rejects I I Emplacement 7,433,436.0 I I Run of Mine (ROM) I stockpile (north) I Run of Mine (ROM) ML70426 447,734.3 i 7,427,288.9 I I 2. Tailings Storage Ii stockpile (south) i Facility ML70426 East of Domain 1 2,237 I I Located in the south-east of the lease ! i I Tailings Dams ML70426 452,022.1 7,425,922.9 I Tailings Decant Dam ML70426 450,921 .7 7,427,971.9 I I Product stockpile I I ' Landfill 3. Infrastructure ML70426 I I Eastern portion of the mining lease: running I 2,016 north to south Refer to Figure 1 ' i ML70426 449,646.8 7,431 ,670.9 I

    page 7Regulated structures, Waste
  21. A24

    Mining activities which will result in land becoming significantly disturbed must only occur within the mine domains identified within Table 1: Mining Domains. 8 PJ~ DEPARmENT OF ENVIRONMENT AND HERITAGE Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310 Definitions

  22. A25

    Words and phrases used throughout this environmental authority are defined in the Definitions section of this authority. Where a definition for a term used in this environmental authority is sought and the term is not defined within this environmental authority, the definitions in the Environmental Protection Act 1994, its regulations and policies must be used. Schedule B: Air Dust Nuisance

  23. B1

    The release of dust and/or particulate matter resulting from the mining activity must not cause an environmental nuisance at any nuisance-sensitive place

  24. B2

    Exceedence of any of the following levels when measured at any nuisance sensitive place is an environmental nuisance for the purposes of 81: a) a level of deposited dust of 120 milligrams per square metre per day based on a monthly average; b) a concentration of total particulate matter suspended in the atmosphere of 90 micrograms per cubic metre over a 1 year averaging time. Dust Compliance

  25. B3

    The Environmental Authority holder must take all reasonable and practical measures to limit the concentration of particulate matter generated by the mining activities to an aerodynamic diameter of less than 10 micrometres (PM1 0) of 50 micrograms per cubic metre over a 24-hour averaging time at any nuisance sensitive place with no more than five exceedences recorded over twelve months.

  26. B4

    Where monitoring at location identified in Table 2: Air Quality Monitoring Details indicates that the air quality levels detailed in conditions 82 and 83 have been exceeded the holder must investigate the matter and report to the administering authority within 14 days of receipt of monitoring results: a) The concentration of PM10 particles or dust deposition rate recorded; b) A description of meteorological conditions occurring at the time; and c) The measures taken to reduce dust generated by the mining activities. Ambient Dust Monitoring Program

    page 9Air, Monitoring and reporting
  27. B5

    Prior to the commencement of mining activities other than mineral development maintenance activities for the project, the holder must develop and submit for approval to the administering authority, an Ambient Dust Monitoring Program (as outlined in Table 2: Air Quality Monitoring Details), to specify how the ambient dust impacts of the project will be monitored. The program shall include, but not necessarily be limited to: a) procedures for monitoring dust emissions from the project, in accordance with the requirements of this approval; b) locations, frequencies and methods for monitoring PM10 and deposited particulate matter; c) provision for the use of at least three Tapered Element Oscillating Microbalance Samplers (TEOMS), five dust depositional gauges and one meteorological station capable of monitoring wind direction and speed; d) investigation of the use of TEOMS as part of the integrated air quality monitoring network. Should an alternative sampling method be proposed; the holder may seek approval from the administering authority to exclude this requirement. In seeking such exclusion, the reasons for the exclusion shall be provided and be fully justified; e) the holder shall utilise real time monitoring data to inform environmental management decisions associated with the project; f) a framework for identifying actual and potential dust impacts, and for applying proactive and reactive mitigation and management measures to address those impacts; g) provision for independent review and auditing of the Program; and Jf-J- Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 h) mechanisms for updating the Program. 86 Ongoing monitoring must be conducted in accordance with the standards, and at the locations specified in Table 2: Air Quality Monitoring Details. Table 2: Air Quality Monitoring Details Air Quality Sampling Monitoring Standard Monitoring Point Approximate Monitoring Determination Frequency Description Point Location PM to Hourly Easting (m) Northing (m) I I AS 3580.9.8:2008: Methods for AQMS(1): Forrester 446,462 7,460,888 ' I Dust deposition Monthly sampling and analysis of ambient Homestead I 1 air-. Determination of suspended , AQMS(9): Monklands 445,097 7,411,185 H te d 455,734 7,435,283 j particulate matter - PM1o 1 j 446,462 7,460,888 continuous direct mass method omes a 445,097 7,411 '185 ! ! AQMS(12): Alpha 451,429 7,435,608 I using a tapered element I Coal Project I oscillating microbalance (TEOM) Accommodation I analyser Village I AS 3580.10.1 :2003: Methods for DG(1 ): Forrestor \ sampling and analysis of ambient Homestead I air- Determination of particulate DG(2): Monklands

    page 9Air, Monitoring and reporting
  28. C1

    Contaminants that will or have the potential to cause serious or material environmental harm must not be released directly or indirectly to any waters except as permitted under the conditions of this environmental authority. Discharge of Mine Affected Water

    page 13Surface water
  29. C2

    Unless otherwise permitted under the conditions of this environmental authority, the release of mine affected water to waters must only occur from the release points specified in Table 3: Mine Affected Water Release Points, Sources and Receiving Waters and depicted in Figure 2: Mine Affected Water Release Points attached to this environmental authority. Table 3: Mine Affected Water Release Points, Sources and Receiving Waters Release Northing Easting Contaminant Source and Monitoring Point Receiving waters Point(RP) (GDA94) (GDA94) Location description

    page 13Surface water, Monitoring and reporting
  30. C3

    The release of mine affected water to internal water management infrastructure that is installed and operated in accordance with a water management plan that complies with conditions C33 to C38 inclusive is permitted. 13 HERITAGE ~ Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310

    page 13Surface water
  31. C4

    The release of mine affected water to waters in accordance with condition C2 must not exceed the release limits stated in Table 4: Mine Affected Water Release Limits, when measured at the monitoring points specified in Table 3: Mine Affected Water Release Points, Sources and Receiving Waters, for each quality characteristic. Table 4: Mine Affected Water Release Limits QualitY_Characteristic Release Limit Monitoring Frequency Electrical conductivity Release limits specified in Table 6 for variable Continuously (1-1S/cm) flow criteria. pH (pH Unit) 6.5 (minimum) Continuously 9.0 (maximum) Suspended Solids (mg/L) 387 Monitoring to be commenced within 2 hours of I Sulphate Release limits specified In Table 6 for variable I commencement of the release, and then at 24 hours (Sol-) (mg/L) flow criteria. thereafter. Monitoring to be commenced within 2 hours of commencement of the release, and then at 24 hours thereafter.

    page 14Surface water, Monitoring and reporting
  32. C5

    The release of mine affected water to waters from the release points must be monitored at the locations specified in Table 3: Mine Affected Water Release Points, Sources and Receiving Waters for each quality characteristic and at the frequency specified in Table 4: Mine Affected Water Release Limits and Table 5: Release Contaminant Trigger Investigation Levels.

    page 14Surface water, Monitoring and reporting
  33. C6

    If quality characteristics of the release exceed any of the trigger levels specified in Table 5: Release Contaminant Trigger Investigation Levels during a release event, the environmental authority holder must compare the downstream results in the receiving waters to the trigger values specified in Table 5: Release Contaminant Trigger Investigation Levels and: a) where the trigger values are not exceeded then no action is to be taken; or b) where the downstream results exceed the trigger values specified in Table 5: Release Contaminant Trigger Investigation Levels for any quality characteristics, compare the results of the downstream site to the data from background monitoring sites and: i. if the result is less than the background monitoring site data, then no action is to be taken; or ii. if the result is greater than the background monitoring site data, complete an investigation into the potential for environmental harm and provide a written report to the administering authority in the next annual return, outlining: - details of the investigations carried out; and - actions taken to prevent environmental harm. NOTE: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with C6 b) ii. Of this condition, no further reporting is required for subsequent trigger events for that quality characteristic.

    page 14Surface water, Monitoring and reporting
  34. C7

    If an exceedance in accordance with condition C6 b) ii. Is identified, the holder of the authority must notify the administering authority within 14 days of receiving the result. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Table 5: Release Contaminant Trigger Investigation Levels Quality Characteristic Trigger Level Monitoring Frequency Aluminium (llg/L) 1 55 Monitoring to be commenced within 2 hours of Arsenic (flg/L) 1 Cadmium (J.lg/L) 1 13 commencement of the release, and then daily Chromium (J.lgiL) 1 thereafter. Copper (!lgiL) 1 Iron (J.lg/L) 1 0.2 1 2 300 Lead (J.lg/L) 4 Mercury (llg/L) 1 0.2 Nickel (J.lg/L) 1 11 Zinc (!lg/L) 1 8 Boron (flg/L) 1 370 Cobalt (J.lg/L) 90 Manganese (J.lg/L) 1 1900 Molybdenum (J.lg/L) 1 Selenium (J.lgll) 1 34 10 Silver (J.lg/L) 1 Uranium (J.lg/L) 1 1 Vanadium (J.lg/L) 1 10 Ammonia (J.lg/L) 1 900 Nitrate (llg/L) 1 1100 Petroleum hydrocarbons (C6-C9) 20 (J.lg/L) 1 Petroleum hydrocarbons (C10- 100

    page 14Monitoring and reporting
  35. C36

    (!lQIL) 1 2000 Fluoride (J.lg/L) 2 180000 Sodium (llg/L) 1 All metals and metalloids must be measured as total (unfiltered) and d1ssolved (filtered). Tngger levels for metal/metalloids apply 1f dissolved results exceed trigger. 2 Fluoride must be measured as total (unfiltered). Mine Affected Water Release Events

    page 15Surface water
  36. C8

    The holder must ensure a stream flow gauging station/sis installed, operated and maintained to determine and record stream flows at the locations and flow recording frequency specified in Table 6: Mine Affected Water Release during Flow Events.

    page 15Surface water, Monitoring and reporting
  37. C9

    Notwithstanding any other condition of this environmental authority, the release of mine affected water to waters in accordance with condition C2 must only take place during periods of natural flow events in accordance with the receiving water flow criteria for discharge specified in Table 6: Mine Affected Water Release during Flow Events when measured at the monitoring points specified in Table 3: Mine Affected Water Release Points, Sources and Receiving Waters. - - - - - - --=---?)' 15 Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310

    page 15Surface water, Monitoring and reporting
  38. C10

    The release of mine affected water to waters in accordance with condition C2 must not exceed the Electrical Conductivity and Sulphate release limits or the Maximum Release Rate (for all combined release points flows) for each receiving water flow criteria for discharge specified in Table 6: Mine Affected Water Release during Flow Events when measured at the monitoring points specified in Table 3: Mine Affected Water Release Points, Sources and Receiving Waters. Table 6: Mine Affected Water Release during Flow Events Receiving Release Gauginp Gauging Gauging Receiving Receiving Maximum Electrical waters Point Station Station Station WaterFlow release rate Conductivity (RP) Northing Eastlng Recording WaterFlow and Sulphate Lagoon (GDA94} 1 (GDA94) 1 Frequency for all Release Limits Creek RP1 Criteria for combined

    page 16Surface water, Monitoring and reporting
  39. C11

    The daily quantity of mine affected water released from each release point must be measured and recorded at the monitoring points in Table 3: Mine Affected Water Release Points, Sources and Receiving Waters.

    page 16Surface water, Monitoring and reporting
  40. C12

    Releases to waters must be undertaken so as not to cause erosion of the bed and banks of the receiving waters, or cause a material build up of sediment in such waters. Cessation of Release

    page 16Surface water, Land and soil
  41. C13

    During the release of mine affected water to waters from the release points, the receiving waters must be monitored at the locations specified in Table 7: Receiving waters release limits for each quality characteristic and at the frequency specified in Table 7: Receiving waters release limits. -------~) Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

    page 16Surface water, Monitoring and reporting
  42. C14

    Notwithstanding any other condition of this environmental authority, the release of mine affected water: a) must not commence if the water quality at the upstream site in Table 7: Receiving water release limits exceeds the water quality characteristics; and b) must cease if the water quality characteristics at the downstream or the upstream sites in Table 7: Receiving waters release limits are met and or exceeded. Table 7: Receiving waters release limits I .I Monitoring Point Northing (GDA94) Easting (GDA94) Quality Limit Monitoring Frequency Characteristic Continuously Upstream Continuously

    page 17Surface water, Monitoring and reporting
  43. MP1

    17419656 1447619 Electrical 700 conductivity (uS/em) Downstream

  44. MP6

    17444277 1449480 Electrical 700 conductivity JgS/cm)

  45. C15

    In accordance with conditions C14(b), the release of mine affected water may recommence after a cessation if the water quality characteristics in Table 7: Receiving waters release limits are below the water quality characteristics at the downstream and upstream sites in Table 7: Receiving waters release limits. NOTE: If the release of mine affected water is ceased under condition C14, and the water quality within the receiving environment drops below the water quality characteristic limit in Table 7: Receiving water release limits, the release may recommence if all other release conditions are complied with. Notification of Release Event

    page 17Surface water, Monitoring and reporting
  46. C16

    The environmental authority holder must notify the administering authority as soon as practicable and no later than 24 hours after commencing to release mine affected water to the receiving environment. Notification must include the submission of written advice to the administering authority of the following information: a) release commencement date/time; b) expected release cessation date/time; c) release point/s; d) release volume (estimated); e) receiving water/s including the natural flow rate; and f) and details (including available data) regarding likely impacts on the receiving water(s). NOTE: Notification to the administering authority must be addressed to the Manager and Project Manager of the local administering authority via email or facsimile. Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310

    page 17Surface water, Monitoring and reporting
  47. C17

    The environmental authority holder must notify the administering authority as soon as practicable (nominally within 24 hours after cessation of a release event) of the cessation of a release notified under condition C16 and within 28 days provide the following information in writing: a) release cessation date/time; b) natural flow volume in receiving water; c) volume of water released; d) details regarding the compliance of the release with the conditions of Department Interest: water of this environmental authority (i.e. contamination limits, natural flow, discharge volume); e) all in-situ water quality monitoring results; and f) any other matters pertinent to the water release event. NOTE: Successive or intermittent releases occurring within 24 hours of the cessation of any individual release can be considered part of a single release event and do not require individual notification for the purpose of compliance with condition C16 and C17, provided the relevant details of the release are included within the notification provided in accordance with conditions C16 and C17. Notification of Release Event Exceedance

    page 18Surface water, Monitoring and reporting
  48. C18

    If the release limits defined in Table 4: Mine Affected Water Release Limits are exceeded, the holder of the environmental authority must notify the administering authority within 24 hours of receiving the results.

    page 18Surface water, Monitoring and reporting
  49. C19

    The authority holder must, within 28 days of a release that exceeds the conditions of this authority, provide a report to the administering authority detailing: a) the reason of the release; b) the location of the release; c) all water quality monitoring results; d) any general observations; e) all calculations; and f) any other matters pertinent to the water release event. Monitoring of Water Storage Quality

    page 18Monitoring and reporting
  50. C20

    Water storage containing mine affected water which are accessible to livestock must be monitored for the water quality characteristics and at the monitoring frequency specified in Table 8: Onsite Water Storage Contaminant Limits.

    page 18Surface water, Monitoring and reporting
  51. C21

    In the event that water storages exceed the contaminant limits defined in Table 8: Onsite Water Storage Contaminant Limits, the holder of the environmental authority must implement measured, where practicable, to prevent access to waters by all livestock. --------------------~j 18 Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310 Quality Characteristic Table 8: Onsite Water Storage Contaminant Limits Water Storage Contaminant limit Monitoring Frequency pH (pH unit) 6.5 (minimum) Quarterly EC (IJS/cm) 9.0 (maximum) 5970 Sulphate (mg/L) 1000 Fluoride (mg/L) 2 Aluminium (mg/L) 5 Arsenic (mg/L) 0.5 Cadmium (mg/L) 0.01 Cobalt (mg/L) 1 Copper (mg/L) 1 Lead (mg/L) 0.1 Nickel (mg/L) 1 Zinc (mg/L) 20 1 All metals and metalloids must be measured as total (unfiltered). Receiving Environment Monitoring and Contaminant Trigger Levels

    page 18Monitoring and reporting
  52. C22

    The quality of the receiving waters must be monitored at the locations specified in Table 9: Receiving Water Upstream Background and Downstream Monitoring Locations and Figure 3: Receiving Water Upstream Background and Downstream Monitoring Locations for each quality characteristic and at the monitoring frequency stated in Table 10: Receiving Waters Contaminant Trigger Levels. Table 9: Receiving Waters Contaminant Trigger Levels Quality Characteristic Receiving Water Trigger Level Monitoring Frequency pH 6.5 (minimum) Continuously Electrical Conductivity (!lS/cm) 8.0 (maximum) 700 Suspended solids (mg/L) 100 Monitoring to be commenced within 2 hours of commencement of the release, Sulphate (S04"-) (mg/L) 250 and then daily thereafter. Sodium (mg/L) 250 -----------,.;;c~ Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Table 10: Receiving Water Upstream Background and Downstream Monitoring Locations I Monitoring Point (MP) Receiving Waters Location Northing (GDA94) Easting (GDA94) I Description Upstream Background Monitoring Locations l 447619 I MP1 Lagoon Creek at upstream mining 7419656 1 I lease boundary I I - 2km upstream of RP1 - 12km upstream of RP2

    page 19Surface water, Monitoring and reporting
  53. MP7

    Sandy Creek 7438562 440563

  54. MP8

    Sp_ring Creek 7424345 438988 I Downstream Monitorin ;J Locations

    page 20Monitoring and reporting
  55. MP2

    Lagoon Creek 7421437 449121 I 1 - 1.3 downstream of RP1

  56. MP3

    I - 7.2 km upstream of RP2 !i 7426268 I Lagoon Creek 448139 i - 250m downstream of RP2 I - 1Okm downstream of RP1 . I MP4 - 3km upstream of RP9/1 0 I 448752 - 4km upstream of RP5 Lagoon Creek . 7430655 - 1.5km downstream of RP5/6 - 2.5km downstream of RP9/10

  57. MP5

    I - 2km upstream of RP7/8 7436112 448723 - 5km upstream of RP3 1 Lagoon Creek - 3km downstream of RP3, - 8 km u_Q_stream of RP4.

  58. MP6

    Lagoon Creek at downstream mining 7444277 449480 lease boundary - 2km downstream of RP4. i

  59. C23

    If quality characteristics of the receiving water at the downstream monitoring points exceed any of the trigger levels specified in Table 9: Receiving Waters Contaminant Trigger Levels during a release event the environmental authority holder must compare the downs stream results to the upstream results in the receiving waters and: a) where the downstream result is the same or a lower value than the upstream value for the quality characteristic then no action is to be taken; or b) where the downstream results exceed the upstream results complete an investigation into the potential for environmental harm and provide a written report to the administering authority in the next annual return, outlining: i. details of the investigations carried out; and ii. actions taken to prevent environmental harm. NOTE: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with C23 b) of this condition, no further reporting is required for the subsequent trigger events for that quality characteristic. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Receiving Environment Monitoring Program (REMP)

    page 20Surface water, Monitoring and reporting
  60. C24

    The environmental authority holder must develop and implement a Receiving Environment Monitoring Program (REMP) to monitor, identify and describe any adverse impacts to surface water environmental values, quality and flows due to the authorised mining activity. This must include monitoring the effects of the mine on the receiving environment periodically (under natural flow conditions) and while mining affected water is being discharged from the site. For the purpose of the REMP, the receiving environment is the waters of Lagoon Creek and Sandy Creek and connected or surrounding waterways within 1Okm downstream of the release. The REMP should encompass any sensitive receiving waters or environmental values downstream of the authorised mining activity that will potentially be directed affected by an authorised release of mine affected water.

    page 21Surface water, Monitoring and reporting
  61. C25

    The Receiving Environment Monitoring Program (REMP) must: a) assess the condition or state or receiving waters, including upstream conditions, spatially within the REMP area, considering background water quality characteristics based on accurate and reliable monitoring data that takes into consideration temporal variation (e.g. seasonality); and b) be designed to facilitate assessment against water quality objectives for the relevant environmental values that need to be protected; c) include monitoring from background reference sites (e.g. upstream or background) and downstream sites from the release (as a minimum, the locations specified in Table 9: Receiving Water Upstream Background and Downstream Monitoring Locations; d) specify the frequency and timing of sampling required in order to reliably assess ambient conditions and to provide sufficient data to derive site specific background reference values in accordance with the Queensland Water Quality Guidelines 2006. This should include monitoring during periods of natural flow irrespective of mine or other discharges; e) include monitoring and assessment of dissolved oxygen saturation, temperature and all water quality parameters listed in Table 4: Mine Affected Water Release Limits and Table 5: Release Contaminant Trigger Investigation Levels; f) include, where appropriate, monitoring of metals/metalloids in sediments (in accordance with ANZECC & ARMCANZ 2000, BATLEY and/or the most recent version of AS5667 .1 Guidance on Sampling of Bottom Sediments); g) include, where appropriate, monitoring of macroinvertebrates in accordance with the AusRivas methodology; h) apply procedures and/or guidelines from ANZECC and ARMCANZ 2000 and other relevant guidelines and documents; i) describe sampling and analysis methods and quality assurance and control; and j) incorporate stream flow and hydrological information in the interpretations of water quality and biological data.

    page 21Surface water, Land and soil, Monitoring and reporting
  62. C26

    A Receiving Environment Monitoring Program (REMP) Design Document that addresses each criterion presented in Conditions C24 and C25 must be prepared and submitted to the administering authority prior to commencement of mining activities other than Mineral Development Maintenance Activities. Due consideration must be given to any comments made by the administering authority on the REMP Design Document and subsequent implementation of the program.

    page 21Monitoring and reporting
  63. C27

    A report outlining the findings of the Receiving Environment Monitoring Program, including all monitoring results and interpretations in accordance with conditions C24 and C25 must be prepared annually and made available on request to the administrating authority. This must include an assessment of background reference water quality, the condition of downstream water quality compared against water quality objectives, and the suitability of current discharge limits to protect downstream environmental values. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Water Reuse

    page 21Monitoring and reporting
  64. C28

    Mine affected water may be piped or trucked or transferred by some other means that does not contravene the conditions of this environmental authority and deposited into off-lease artificial water storage structures, such as farm dams or tanks, or used directly at off-lease properties owned by the environmental authority holder for a third party for the purpose of: a) supplying stock water subject to compliance with the quality release limits specified in Table 11: Stock water release limits; or b) supplying water for mining, construction and/or road maintenance in accordance with the conditions of this environmental authority. Table 11: Stock water release limits ~ Quality Units Minimum Max.lmum I CharacterlstJc.s pH units 6.5 IJS/cm N/A 8.5 l pH 5000 i I Electrical Conductivity

    page 22Surface water, Regulated structures
  65. C29

    If the responsibility of mine affected water is given or transferred to another person in accordance with C28: a) the responsibility for the mine affected water must only be given or transferred in accordance with a written agreement (third party agreement); and b) the third party agreement must include a commitment from the person utilising the mine affected water to use it in such a way as to prevent environmental harm or public health incidents and the Environmental Protection Act 1994, environmental sustainability of the water disposal and protection of environmental values; and c) the third party agreement must be signed by both parties to the agreement.

    page 22Surface water
  66. C30

    All determinations of water quality and biological monitoring must be: a) performed by a person or body possessing appropriate experience and qualifications to perform the required measurements: b) made in accordance with methods prescribed in the latest edition of the administering authorities Monitoring and Sampling Manual; c) collected from the monitoring locations identified within this environmental authority, within 6 hours of each other where access to the monitoring location is practicable; d) carried out on representative samples; and e) analysed at a laboratory accredited (e.g. NATA) for the method of analysis being used.

    page 22Monitoring and reporting
  67. C31

    The release of any contaminants as permitted by this environmental authority, directly or indirectly to waters, other than internal water management infrastructure that is installed and operated in accordance with a water management plan that complies with conditions of this environmental authority: a) must not produce any visible discolouration of receiving waters; and b) must not produce any slick or other visible or odourous evidence of oil, grease or petrochemicals nor contain visible floating oil. Grease, scum, litter or other objectionable matter. 22 P~ Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

    page 22Surface water, Air
  68. C32

    The following information must be recorded in relation to all water monitoring required under the conditions of this environmental authority and submitted to the administering authority in the specified format with each annual return: a) the date on which the sample was taken; b) the time at which the sample was taken; c) the monitoring point at which the sample was taken; d) the measured or estimated daily quantity of mine affected water released from all release points; e) the results of all monitoring and details of any exceedances of the conditions of this environmental authority; and f) water quality monitoring data must be provided to the administering authority in the specified electronic format upon request. Water Management Plan

    page 23Surface water, Monitoring and reporting
  69. C33

    A Water Management Plan must be developed by an appropriately qualified and suitable person and implemented prior to the commencement of mining activities.

  70. C34

    The Water Management Plan must: a) provide for effective management of actual and potential environmental impacts resulting from water management associated with the mining activity carried out under this environmental authority; and b) be developed in accordance with the administering authorities guideline Preparation of water management plans for mining activities and include: i. a study of the source of contaminants; ii. a water balance model for the site; iii. a water management system for the site; iv. measures to manage and prevent saline drainage; v. measures to manage and prevent acid rock drainage; vi. contingency procedures for emergencies; and vii. a program for monitoring and review of the effectiveness of the water management plan.

    page 23Monitoring and reporting
  71. C35

    The Water Management Plan must be reviewed each calendar year and a report prepared by an appropriately qualified person. The report must: a) assess the plan against the requirements under condition C34; b) include recommended actions to ensure actual and potential environmental impacts are effectively managed for the coming year; and c) identify any amendments made to the water management plan following the review.

    page 23Monitoring and reporting
  72. C36

    The holder of this environmental authority must attach to the review report required by condition C35, a written response to the report and recommended actions, detailing the actions taken or to be taken by the environmental authority holder on stated dates: a) to ensure compliance with this environmental authority; and b) to prevent a recurrence of any non-compliance issues identified.

    page 23Monitoring and reporting
  73. C37

    The review report required by condition C35 and the written response to the review report required by condition C36 must be submitted to the administering authority with the subsequent annual return under the signature of the appointed signatory for the annual return.

    page 23Monitoring and reporting
  74. C38

    A copy of the Water Management Plan must be provided to the administering authority on request. Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310 Saline Drainage

  75. C39

    The holder of this environmental authority must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of saline drainage. Acid Rock Drainage

  76. C40

    The holder of this environmental authority must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of acid rock drainage. Stormwater and Water Sediment Controls

    page 24Surface water, Land and soil
  77. C41

    An Erosion and Sediment Control Plan must be developed by an appropriately qualified person and implemented for all stages of the mining activities on the site to minimise erosion and the release of sediment to receiving waters and contamination of stormwater.

    page 24Surface water, Land and soil
  78. C42

    Stormwater, other than mine affected water, is permitted to be released to waters from: a) erosion and sediment control structures that are installed and operated in accordance with the Erosion and Sediment Control Plan required by condition C41; b) water management infrastructure that is installed and operated, in accordance with a Water Management Plan that complies with C34 inclusive, for the purpose of ensuring water does not become mine affected water.

    page 24Surface water, Land and soil
  79. C43

    The maintenance and cleaning of any vehicles, plant or equipment must not be carried out in areas from which contaminants can be released into any receiving waters. Overflow of Mine Affected Water from Regulated Structures

    page 24Surface water, Regulated structures
  80. C44

    The overflow of mine affected water from one or more of the dams listed in Table 29: Location of Regulated Structures to receiving waters is authorised if: a) the holder has complied with ALL conditions listed in Schedule G - Regulated Structures of this environmental authority; and b) the overflow is a direct result of rainfall events which since November 1 have generated a total rainfall depth in excess of that determined under the Design Storage Allowance (DSA) annual exceedance probability (AEP) event listed in Table 31: Hydraulic Performance of Regulated Dams for the relevant dam (or network of linked containment systems); and c) the holder has taken all reasonable and practicable measures to prevent an overflow from the relevant dam.

    page 24Surface water, Regulated structures
  81. C45

    Any release of mine affected water resulting from an overflow from one or more of the dams listed in Table 29: Location of Regulated Structures and Table 12: Overflow release to the receiving environment to receiving waters must be monitored at the locations specified in Table 12:0verflow release to the receiving environment and Table 13: Monitoring Locations for Overflow Releases for those quality characteristics and at the frequencies specified in Table 14: Release Contaminant Trigger Investigation Levels - Overflow Releases: 24 PR~ Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Table 12: Overflow release to the receiving environment Release Point Northing Easting Contaminant Source and Location Monitoring Receiving (RP) waters

    page 24Surface water, Regulated structures, Monitoring and reporting
  82. MP6

    1 7419656 Upstream 1 447619 Downstream 1 44948o 1 7444277 Table 14: Release Contaminant Trigger Investigation Levels- Overflow Releases Quality Characteristic Trigger Level Monitoring Frequency Electrical conductivity (JlS/cm) 700 Continuously pH (pH Unit) 6-8.5 Turbidity 460 Suspended Solids (mg/L) 483 Sulphate (SO/.) (mg/L) 250 Monitoring to be 7490 commenced within 2 Aluminium (Jlg/L) 1 hours of Arsenic (Jl_g/L) 1 13 commencement of Cadmium (Jlg/L) 1 0.2 the release and daily Chromium (Jlg/L) 1 16 thereafter. Copper (Jlg/L) 1 40.6 Iron (Jlg/L) 1 9700 Lead (Jlg/Ll 1 12 Mercury (gg/L) 1 0.5 Nickel (Jlg/Ll 1 11 Zinc!Jlg/Ll1 167 Boron (ug/L) 1 370 90 Cobalt (ug/L) 1 1900 Manganese(ug/L) 1 Molybdenum (ug/L) 34 Selenium (ug/L) 1 10 Silver (ug/L) 1 Uranium (ug/L) 1 Vanadium (ug/L) 20 Ammonia (ug/L) 900 Nitrate (ug/L) 1100 Petroleum hydrocarbons (C6-C9) (ug/L) 20 Petroleum hydrocarbons (C1 O-C36) (ug/L) 100 Fluoride (ug/L) ~ 2000 Sodium (ug/L) 23000 All metals and metalloids must be measured as total (unfiltered) and dissolved (filtered). Tngger levels for metal/metalloids apply 1f dissolved results exceed trigger.

    page 25Monitoring and reporting
  83. C46

    If quality characteristics of the release exceed any of the trigger levels specified in Table 14: Release Contaminant Trigger Investigation Levels - Overflow Releases during an overflow release, the holder must compare the downstream results in the receiving waters to the trigger values specified in Table 14: Release Contaminant Trigger Investigation Levels- Overflow Releases and: a) where the trigger values are not exceeded at downstream locations then no action is to be taken; or b) where the downstream results exceed the trigger values specified in Table 14: Release Contaminant Trigger Investigation Levels - Overflow Releases for any quality characteristics, compare the results of the downstream site to the data from background monitoring sites and from the release point and: i. if the result is less than the background monitoring site data, then no action is to be taken; or ii. if the result is greater than the background monitoring site data, complete an investigation into the potential for environmental harm and provide a written report to the administering authority within 28 days of the cessation of the release, outlining: - details of the investigations carried out; and - actions taken to prevent environmental harm. NOTE: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with C6 b) ii. Of this condition, no further reporting is required for subsequent trigger events for that quality characteristic.

    page 26Surface water, Monitoring and reporting
  84. C47

    The holder must notify the administering authority as soon as practicable and no later than 24 hours after the commencement of an overflow release of mine affected water to the receiving environment in accordance with conditions C44 and C45 of this environmental authority. Notification must include the submission of written advise to the administering authority of the following information: a) release commencement date/time; b) release points; c) receiving water/s; and d) any details (including available data) regarding likely impacts on the receiving environment. NOTE: Notification to the administering authority must be addressed to the Manager and Project Manager of the local administering authority via email or facsimile.

    page 26Surface water, Monitoring and reporting
  85. C48

    The holder must notify the administering authority as soon as practicable and no later than 24 hours after the cessation of a release notified under condition C47. Notification must include the submission of written advise to the administering authority of the following information: a) release cessation date/time; b) volume of water released; c) all in-situ water quality monitoring results; and d) any other matters pertinent to the water release event. NOTE: Successive or intermittent releases occurring within 24 hours of the cessation of any individual release can be considered part of a single release event and do not require individual notification for the purposed of compliance with conditions C47 and C48, provided the relevant details of the release are included within the notification provided in accordance with conditions C47 and C48.

    page 26Monitoring and reporting
  86. C49

    Within 28 days of a release notified under condition C47, the holder must provide a report to the administering authority demonstrating compliance with condition C44. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Groundwater

    page 26Groundwater, Monitoring and reporting
  87. C50

    A groundwater monitoring program must be developed and submitted to the administering authority for approval before the commencement of mining activities. The monitoring program must: a) allow for the compilation of representative groundwater samples from the aquifers identified as potentially affected by mining activities. The geological units monitored include alluvium, Bandanna Formation, Colinlea Sandstone, Clematis Sandstone, Rewan Formation, and Joe Joe Formation; b) include at least 12 sampling events, no more than 2 months apart over a 2 year period, to determine background groundwater quality; c) obtain background groundwater quality in hydraulically isolated background bore(s), and d) allow for the identification of natural groundwater level trends, hydrochemical trigger levels, and contaminant limits.

    page 27Groundwater, Monitoring and reporting
  88. C51

    In addition to condition CSO groundwater quality and levels must be monitored at the locations and frequencies specified in Table 15: Groundwater monitoring network locations and frequency and Figure 4: Groundwater Monitoring Locations. 27 HERITAGE~ Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310 Table 15: Groundwater monitoring network locations and frequency [ Monitoring-sites-.. --:-Parameter . l=requency- - .I I Water 1.. .. ................ ... -------- -- - -- --- -- ----. . .. .. .. ..... .. .... ..... - ----- .. __....... __.......... ...... i AM8-01' AM8-02, AMB-03, AMB- .,.. i At least one reading every 12 hours- level I 04 <~-r. .-.-~; ,; . ,- '-~:::::: -~ rPH.-EC.ros <aoo,;;,aii<io- I dissolved metals (AI, As, 8, Cd, Cr, Co, Cu, Fe, - - ..,,<iaia '' "'"'"'"' - I I fi~~;~-~~:r\~~~~ ATSF-03,- - -, r~~t~~l-e~~- M~~i, -1;1-.!~9, l,J, ~nj, nutri~nts --.,- -~~:~~~~~~=~ng every-12-hours-- - -~ J ATSF-048, ATSF-078, ATSF- i h>t:r: ! [ ~~~-F~;:,-~~~-:.;:;-~~~-F- Ec~ fi5~f~ab>.-cations, inions-.-sefecteC!-- - ----[- M"onthly .lintii slifficienf d'ata-is campileer -- - .. i 058, ATSF-OSC, ATSF-09A, I dissolved metals (~1, As, B, Cd, Cr, Co, ~u, Fe, ! 1 f:;;,~f~;:n:~:-re.--r:~=~.:-Mo, "'-Se,Ag, U, Zo), ""'"""" 12 ~~=:~"~,:~;;gew;., hmiffi c -1 ~~;~~:~t~f~~~~~~~~~~~: Tos(lati)~cations~anions, 1--pH:Ec. seiectEid___1I_Eve,Y2 months (torat.least fvio- year5f- J I EWT, TL01, RWD1, ROMSouth, 1 dissolved metals (AI, As, B, Cd, Cr. Co, Cu, Fe, ROMNorth , Pb, Hg, Mn, Mo, Ni, Se, Ag, U, Zn), nutrients, --~I 1 ~ VwP-bOres. . ....-~ ~~e~~~~~~~~res on!Y)_ - - - - - + Atiea sfo.ne reading every 12 hours :..:-- I [ AVP_11, AVP_01, AVP_14, i electronic data readers ! i I AVP_03, AVP_05, AVP_04, j I I AVP_06, AVP_07, AVP_08, 1 I AVP_13,AVP_09,AVP_10 !,! i~r.,;~;A~s~~. ATSF- .. ~ w,,.,,ev.l OOiy - -- ~ ~ ~~~~~"~.::=:.""" 12 hooffi- ~ ~N~-e~wSfG~c_i:AB:_b-O-o~r-e~s-~~SF-~~~- - 1 .:'- - j -w- a-t-e-r--le-ve_l..o--n-ly.. ...... every12 i ATiea st .one readinghourS :.:-- 11 __ . IE~~~:::;~;~;,nd w...,..,.""'' -1-~:;;,;:;::~""'"'-~ 1 1 1 landholder properties: I electronic data readers 1 i I 1 Anderson Property (Location TBA) I 1. Currie Property (Location TBA) J <~as~~~ipr9~_{hq_~~.!l_I~~L! - -- --- --- - -- ------ ---- ___ ________ _ _ ... , _____ _ : AI, As, Sb, 8, Cd, Cr, Co, Cu, Fe, Pb, Hg, Mn, : Annually 1 All monitoring bores

    page 27Groundwater, Monitoring and reporting
  89. C52

    If groundwater monitoring results greater than the trigger levels (or outside the trigger levels range for pH) specified for the relevant aquifer in Table 16: Groundwater contaminant limits and trigger levels- Alluvium Aquivers (wet season) to Table 20: Groundwater contaminant limits and trigger levels- Joe Joe Formation (inclusive) are recorded, then the following must be conducted: a) the relevant monitoring point(s) will be re-sampled and the samples analysed for major cations and anions, and selected dissolved metals, including AI, As, Sb, 8, Cd, Cr, Co, Cu, Fe, Pb, Hg, Mn, Mo, Ni, Se, Ag, U, Zn; b) if elevated concentrations (above trigger) are recorded on two consecutive sampling events then an investigation into cause, optimum response, and the potential for environmental harm must be conducted; and c) if elevated concentrations are recorded on two consecutive sampling events then the administering authority will be notified within 1 month of receiving the analysis results. NOTE: Table 16 to Table 20 inclusive means the following tables: - Table 16: Groundwater contaminant limits and trigger levels- Alluvium Aquifers (wet season); or - Table 17: Groundwater contaminant limits and trigger levels- Alluvium Aquifers (dry season); or - Table 18: Groundwater contaminant limits and trigger levels - Colinlea Sandstone Aquifers; or - Table 19: Groundwater contaminant limits and trigger levels - Bandanna Formation Aquifers; or - Table 20: Groundwater contaminant limits and trigger levels- Joe Joe Formation.

    page 29Groundwater, Monitoring and reporting
  90. C53

    If groundwater monitoring results greater than the contaminant limits (or outside the contaminant limits range for pH) specified for the relevant aquifer in Table 16: Groundwater contaminant limits and trigger levels -Alluvium Aquifers (wet season) to Table 20: Groundwater contaminant limits and trigger levels -Joe Joe Formation (inclusive) are recorded, then an investigation into cause, optimum response, and the potential for environmental harm must be conducted. NOTE: Table 16 to Table 20 inclusive means the following tables: - Table 16: Groundwater contaminant limits and trigger levels- Alluvium Aquifers (wet season); or - Table 17: Groundwater contaminant limits and trigger levels- Alluvium Aquifers (dry season); or - Table 18: Groundwater contaminant limits and trigger levels- Colinlea Sandstone Aquifers; or - Table 19: Groundwater contaminant limits and trigger levels- Bandanna Formation Aquifers; or - Table 20: Groundwater contaminant limits and trigger levels- Joe Joe Formation. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Table 16: Groundwater contaminant limits and trigger levels- Alluvium Aquifers (wet season) --.- - - ---_ .~, =~~~r~a~alsAiumiiiYu~ --F:~;~ :Fr~w~:fc~~B~J~n)ac~~ro~~d aatci !f-9c9o"'-nPta"einrcienn-aiinlei-ioimftialtcs1<9ra.:inCi Ciata - -- -! I (AI) i I Antimony (Sb) I I Arsenic (As) I I Iron (Fe) I i I Molybdenum (Mo) I I I ~~~~;_ir~se>_ ---- r- - - ----------~ Tota_! Dis~9JY.~_-_olids__ ----j--!!1.9fL_ _ _____ ___ ] I.{~-i:~i~~-~;-i~~~ons- ---~- ~~~ ---- ---- - - --- , I [ Sulphate - I' Calcium ~ Mag~nesium 1 1 i ll Potassium j Chloride I I Carbonate 1 _ hBl~bonate_ _ _ __ _____ j - _____ --1 1 __1 ~:~;~:;,:>Qm~~~--~~nt~tlo~~:::s: ----=---------j-~~~~~i_.i>_H_u~:_r~~n,---hi-g-h-es_t-"_r_,....., -: 1Baseline value -1.0 for pH, means the corresponding variation allowed is 1.0 pH unit above and below average and maximum I minimum ~H values determined for the site. Parameters and sampling frequency will be revised at the end of background sampling, based on results compiled at each monitoring point and proposed land use. ~he administering authority and the holder will agree to suitable trigger levels and contaminant limits (per aquifer and season) once sufficient hydrochemical data has been compiled. Table 17: Groundwater contaminant limits and trigger levels- Alluvium Aquifers (dry season)

    page 29Groundwater, Monitoring and reporting
  91. C54

    Groundwater contaminant trigger levels for Table 16: Groundwater contaminant limits and trigger levels - Alluvium Aquifers (wet season) to Table 20: Groundwater contaminant limits and trigger levels- Joe Joe Formation (inclusive) must be finalised based on the Groundwater Monitoring Program approved under condition C50 and submitted to the administering authority 28 days prior to commencing coal extraction. NOTE: Table 16 to Table 20 inclusive means the following tables: - Table 16: Groundwater contaminant limits and trigger levels - Alluvium Aquifers (wet season); or - Table 17: Groundwater contaminant limits and trigger levels- Alluvium Aquifers (dry season); or - Table 18: Groundwater contaminant limits and trigger levels- Colinlea Sandstone Aquifers; or - Table 19: Groundwater contaminant limits and trigger levels- Bandanna Formation Aquifers; or - Table 20: Groundwater contaminant limits and trigger levels- Joe Joe Formation.

    page 33Groundwater, Monitoring and reporting
  92. C55

    Groundwater monitoring bores must be constructed in accordance with methods prescribed in the Minimum Construction Requirements for Water Bores in Australia- 3rd Edition (LWBC), or equivalent.

    page 33Groundwater, Monitoring and reporting
  93. C56

    The monitored data must be reported to the administering authority, and must satisfy the following criteria: a) data collected under the monitoring program will be forwarded to the administering authority on a quarterly basis within 30 business days of the end of each quarter and compiled in an annual monitoring report in a format approved by the administering authority; b) the proponent shall undertake an assessment of the impacts of mining on groundwater after the first 12 months of dewatering commencing and thereafter every subsequent calendar year; c) the annual monitoring report will be forwarded to the relevant authority by the first of March each calendar year; and d) the annual monitoring report will include an assessment of impacts, any mitigation strategies as wells as any recommendations for changes to the approved monitoring program. e) If there is a requirement to submit a similar groundwater report as part of any condition issued under a water licence under the Water Act 2000 then the proponent and the relevant administering authorities may agree for the reports to be combined. Schedule 0: Noise and Vibration Noise Nuisance 01 Noise from activities must not cause an environmental nuisance at any nuisance sensitive place. 02 Noise from activities must not exceed the levels specified in Table 21: Noise Limits- Mine Noise for mine noise, or Table 22: Noise Limits - Rail Noise for rail noise, at any nuisance sensitive place. Noise Monitoring 03 When requested by the administering authority, noise monitoring must be undertaken to investigate any complaint of environmental nuisance (which is neither frivolous nor vexatious nor based on mistaken belief in the opinion of an authorised officer), and the results notified to the administering authority within 14 days of their receipt by the holder. Monitoring must include: a) LA eq, adj, 15 mins [free field]- for mine noise; b) LA 1, 15 mins [internal- or a measured external noise level and calculation of corresponding internal noise level specific to the complaint's house]- for mine noise; c) LA eq, 24 hours [fa<;ade corrected] -for rail noise; d) Single Event Maximum Sound Pressure Level (arithmetic average of the loudest 15 rail events in a 24 hour period) [fa<;ade corrected] -for rail noise e) the level and frequency of occurrence of impulsive or tonal noise ) Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310 f) atmospheric conditions including wind speed and direction g) effects due to extraneous factors such as traffic noise; and h) location date and time of recording. 04 Noise is not considered to be a nuisance under condition 01 if monitoring shows that noise from the Alpha Coal mining activity does not exceed the levels in the time periods specified in Table 21: Noise Limits- Mine Noise for Mine Noise and Table 22: Noise Limits- Rail Noise for Rail Noise. For those measurement locations where rail noise cannot be legitimately differentiated from the overall mine noise then the criteria in Table 21: Noise Limits- Mine Noise apply to the combined noise emissions from the mine and rail activities.

    page 33Groundwater, Noise and vibration, Monitoring and reporting
  94. E1

    Scrap tyres stored awaiting disposal or transport for take-back and recycling, or waste-to-energy options must be stored in stable stacks of up to four tyres or less than three metres high (whichever is greater), and at least 10 m from any other scrap tyre storage area, or combustible or flammable material, including vegetation.

    page 35Waste, Biodiversity
  95. E2

    All reasonable and practicable fire prevention measures must be implemented, including removal of grass and other materials within a 10m radius of the scrap tyre storage area. ) Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

  96. E3

    Disposing of scrap tyres resulting from the authorised activities in spoil emplacements is acceptable, provided tyres are placed as deep in the spoil as reasonably practicable. A record must be kept of the number and location for tyres disposed.

    page 36Monitoring and reporting
  97. E4

    Scrap tyres resulting from the mining activities disposed within the operational land must not impede saturated aquifers or compromise the stability of the consolidated landform. Waste Management Plan

    page 36Groundwater, Waste
  98. E5

    A Waste Management Plan, must be developed and implemented prior to the commencement of mining activities and must cover: a) how the holder will recognise and apply the waste management hierarchy b) characterisations of wastes generated from the Project and general volume trends over the past five (5) years (or for the duration of the environmental authority if it is less than five years old) c) waste commitments with auditable targets to reduce, reuse and recycle d) waste management control strategies including: i. the type of wastes ii. segregation of the wastes iii. storage of the wastes iv. transport of the wastes v. monitoring and reporting matters concerning the waste vi. emergency response planning, and vii. disposal, reused and recycling options e) the potential adverse and beneficial impacts of the wastes generated f) the hazardous characteristics of the wastes generated including disposal procedures for hazardous wastes g) processes to be implemented to allow for continuous improvement of the waste management systems h) identification of responsible staff (positions) for implementing, managing and reporting the Waste Management Plan, and i) staff awareness and induction programs that encourage re-use and recycling. Waste - Landfill

    page 36Waste, Monitoring and reporting
  99. E6

    A Landfill Management Plan, in accordance with the administering authority's guideline ERA 60 - Waste Disposal- Landfill siting, design, operation and rehabilitation, must be developed and implemented prior to the commencement of disposing of waste as part of the mining activities. NOTE: It is an offence under the Stock Act 1915 and Stock Regulation 1988 to allow or fail to take every reasonable measure to prevent stock access to animal matter or animal-contaminated matter.

    page 36Rehabilitation, Waste
  100. E7

    The landfill facility must be located within the area identified in Table 25: Landfill Facility (Waste Disposal). Table 25: Landfill Facility (Waste Disposal) waste oisi:iosaiFacilii}t Name -r--- -23.2225 146.5289 Landfill -FaciTifY - 1 - -- ~23:225 "'11'44"66.:55324933___ _ -- - ~23.2324 -146:5241' . . --- -- --- -23~22"96 - ------ ---- ------- --------- PRO~ Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310 ES The release of landfill gas from the landfill facility must not cause environmental harm.

    page 36Waste
  101. E9

    Landfill gas is not considered to cause environmental harm if: a) landfill gas monitoring shows that the release of methane does not exceed the following limits: i. 500 parts per million at a height of 50mm above the final and intermediate cover surface including the batter slopes of the landfill facility; ii. 25 percent of the lower explosive limit when measured in facility structures (but excluding facility structures used for landfill gas and leachate control and landfill gas and leachate recovery system components); and iii. The lower explosive limit at the landfill facility boundary; and/or b) a landfill gas collection system is installed and maintained to allow adequate drainage of gas liners.

    page 37Monitoring and reporting
  102. E10

    When requested by the administering authority or as a result of a complaint {which is neither frivolous nor vexatious nor based on mistaken belief in the opinion of the authorised officer), landfill gas monitoring must be undertaken for the quality limits specified in condition E9{a), and the results thereof notified to the administering authority within 14 days of their receipt by the holder. Monitoring must be carried out at a place(s) relevant to the release of landfill gas.

    page 37Monitoring and reporting
  103. E11

    When the deposition of waste to the landfill facility ceases, a final cover system to the landfill facility must be installed which minimises: a) infiltration of water into the landfill facility; b) the likelihood of any erosion occurring to either the final cover system or the land filled materials; and c) uncontrolled release of landfill gas.

    page 37Waste, Land and soil
  104. E12

    Post-closure care of the landfill facility must be conducted following deposition of waste in the landfill unit, for: a) a period of 30 years; or b) such shorter period until the landfill facility and surrounding site are geotechnically stable and that no release of waste materials, leachate, landfill gas or other contaminants to the environment is likely.

    page 37Waste
  105. E13

    A landfill facility site management plan pursuant to Chapter 7, Part 8, Division 5 of the Environmental Protection Act 1994 must be developed and provided to the administering authority at least 12 months before the expected final receipt of waste in the landfill facility. The site management plan must include, but is not to be limited to, the future land use and actions the holder intends to take for compliance with the closure and post closure care requirements of this approval.

    page 37Waste
  106. E14

    Clear access for fire-fighting vehicles must be provided at all times at the landfill facility.

  107. E15

    An effective fire break must be provided and maintained around the landfill facility. -~-----~") Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

  108. E16

    At all times while the landfill facility is operating, at least one person must be present who is responsible for the control and operation of the facility and whose duties must include, but not be limited to: a) controlling the reception, storage and removal of waste; b) maintaining the facility; c) controlling all employees working in the facility; and d) supervising all persons entering the facility. NOTE: For the purposes of this condition, the Landfill Site Based Management Plan required under E6 specifies when the landfill unit is "operating".

    page 38Waste
  109. E17

    Notwithstanding any condition of this approval, the following waste materials are not permitted or allowed to be deposited in the landfill unit: a) liquid or semi liquid waste other than liquid or semiliquid waste which has been produced in carrying out the environmentally relevant activity identified as Waste Disposal; b) hot ash; c) material that is smouldering or aflame; d) material containing a substance which is corrosive, reactive or toxic (other than materials containing a toxic substance from domestic premises) unless this material is to be deposited into a dedicated monocell approved in writing by the administering authority; e) all radioactive wastes, unless otherwise approved under the Radiation Safety Act 1999 or contaminated soil; f) an explosive; and g) ammunition, other than ammunition that no longer contains explosives, pyrotechnics or propellants apart from trace residues that are no longer capable of supporting combustion or an explosive reaction. Waste Storage

    page 38Waste, Land and soil
  110. E18

    A designated area or storage containers must be set aside for the laydown and segregation of wastes.

    page 38Waste
  111. E19

    An effective fire break must be provided and maintained around all waste laydown areas.

    page 38Waste
  112. E20

    All reasonable and practicable fire prevention measures must be implemented, including removal of grass and other materials within a 1Om radius of all waste laydown areas.

    page 38Waste
  113. E21

    Waste (excluding vegetation) must not be burned or allowed to be burned on the mining lease unless by approval of the administering authority.

    page 38Waste, Biodiversity
  114. E22

    Waste batteries must be stored: a) in a bunded and roofed area; or b) palletised and plastic wrapped. Waste - General

    page 38Waste
  115. E23

    Waste that is removed from the site must be taken to a facility that is lawfully able to accept the waste under the Environmental Protection Act 1994. 38 P~ Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

    page 38Waste
  116. E24

    A record of all wastes removed from site must be kept detailing the following information: a) date of pickup of waste; b) description of waste; c) quantity of waste; d) origin of the waste; and e) destination of the waste.

    page 39Waste, Monitoring and reporting
  117. E25

    All regulated waste removed from the site must be removed by a person who holds a current approval to transport such waste under the provisions of the Environmental Protection Act 1994.

    page 39Waste
  118. E26

    Each container of regulated waste must be marked to identify the waste contained therein. Schedule F: Land Topsoil

    page 39Waste, Land and soil
  119. F1

    Topsoil must be strategically stripped ahead of mining in accordance with a Topsoil Management Plan.

    page 39Land and soil
  120. F2

    Topsoil and subsoils must be managed to ensure stability and minimise the release contaminants.

    page 39Land and soil
  121. F3

    A topsoil inventory which identifies the topsoil requirements for the Alpha Coal Mine project and availability of suitable topsoil on site must be detailed in the Plan of Operations. Preventing contaminant release to land

    page 39Land and soil
  122. F4

    Contaminants must not be released to land in any manner which constitutes nuisance, material or serious environmental harm. NOTE: Where the release of contaminants to land is undertaken in accordance with a condition of this environmental authority, the release of contaminants is not considered to contravene condition F4.

  123. F5

    The environmental authority holder must take all practicable actions necessary to secure loads prior to transporting materials off site to minimise emissions or spillage of any material from vehicles or other transport infrastructure. Chemicals and flammable or combustible liquids

  124. F6

    All flammable and combustible liquids must be contained within an on-site containment system and controlled in a manner that prevents nuisance, material or serious environmental harm and maintained in accordance with the current edition of AS 1940- Storage and Handling of Flammable and Combustible Liquids.

  125. F7

    Spillage of all flammable and combustible liquids must be controlled in a manner that prevents nuisance, material or serious environmental harm.

  126. F8

    All chemicals must be contained within an on-site containment system and controlled in a manner that prevents nuisance, material or serious environmental harm and maintained in accordance with the current version of the relevant Australian Standard.

  127. F9

    Spillage of all chemicals must be controlled in a manner that prevents nuisance, material of serious environmental harm.

  128. F10

    All explosives, corrosive substances, toxic substances, gases and dangerous goods must be stored and . handled in accordance with the relevant Australian Standard. A _) Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310

  129. F11

    All chemicals and flammable or combustible liquids stored on site that have the potential to cause environmental harm must be stored in or serviced by an effective containment system that is impervious to the materials stored and managed to prevent the release of liquids to waters or land. Where no relevant Australian Standard is available, the following must be applied: a) storage tanks must be bunded so that the capacity and construction of the bund is sufficient to contain at least 11 0% of a single storage tank or 100% of the largest storage tank plus 10% of the second largest storage tank in multiple storage areas; and b) drum storages must be bunded so that the capacity and construction of the bund is sufficient to contain at least 25% of the maximum design storage volume within the bund. Spill Kit

  130. F12

    An appropriate spill kit, personal protective equipment and relevant operator instructions/emergency procedure guides for the management of wastes, chemicals and flammable and combustible liquids associated with the activity must be kept at the site.

    page 40Waste
  131. F13

    Anyone operating with wastes, chemicals or flammable and combustible liquids under this approval must be trained in the use of the spill kit. Mining Waste

    page 40Waste
  132. F14

    A Mining Waste Management Plan must be developed by an appropriately qualified and suitable person and implemented prior to the commencement of mining activities other than mineral development maintenance activities.

    page 40Waste
  133. F15

    The Mining Waste Management Plan must include: a) characterisation programs to ensure that all mining waste is progressively characterised prior to disposal for net acid producing potential, salinity and the following contaminants: Iron (Fe), Aluminium (AI), Copper (Cu), Magnesium (Mg), Manganese (Mn), Calcium (Ca), Sodium (Na) and Sulphate (S04); b) characterisation programs to ensure that the physical properties of the mining waste is progressively characterised during disposal; c) the process for the quantification of availability or leachability of metals from the mining waste; d) the process for the identification and quantification of Potentially Acid Forming mining waste; e) management actions for mining waste that has been identified as having a high availability or leachability of metals in accordance with condition F15c; f) management actions for mining waste that has been defined as Potentially Acid Forming, including a review of the potential impacts on rehabilitation; g) where the acid producing potential of mining waste material has not been conclusively determined, geochemical kinetic testing to indicate oxidation rates, potential reaction products and effectiveness of control strategies; h) identification of environmental impacts and potential environmental impacts; i) control measures for routine operations to minimise likelihood of environmental harm; j) the keeping of records of mining waste emplacements to indicate locations and characteristics of mining waste; k) a mining waste emplacement area operational plan in accordance with condition F21; I) contingency plans and emergency procedures for non-routine situations; and m) a program for monitoring and review of the effectiveness of the mining waste management plan. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

    page 40Rehabilitation, Waste, Monitoring and reporting
  134. F16

    The Mining Waste Management Plan must be reviewed each calendar year and a report prepared by an appropriately qualified person. The report must: a) assess the plan against the requirements under condition F15; b) include recommended actions to ensure actual and potential environmental impacts are effectively managed for the coming year; and c) identify any amendments made to the Mining Waste Management Plan following the review.

    page 41Waste, Monitoring and reporting
  135. F17

    The holder of this environmental authority must attach to the review report required by condition F16, a written response to the report and recommended actions, detailing the actions taken or to be taken by the environmental authority holder on stated dates: a) to ensure compliance with this environmental authority; and b) to prevent a recurrence of any non-compliance issues identified.

    page 41Monitoring and reporting
  136. F18

    The review report required by condition F16 and the written response to the review report required by condition F17 must be submitted to the administering authority with the subsequent annual return under the signature of the appointed signatory for the annual return.

    page 41Monitoring and reporting
  137. F19

    A copy of the Mining Waste Management Plan must be provided to the administering authority on request.

    page 41Waste
  138. F20

    The mining waste emplacement areas shall be designed to prevent environmental harm arising from contaminants being released to the environment.

    page 41Waste
  139. F21

    An operational plan must be developed and implemented prior to commencement of mining activities and maintained for the mining waste emplacement areas. The operational plan must include but not be limited to: a) description of landform development stages of the mining waste emplacement areas; b) placement technique for mining waste and course reject waste from the coal handling and processing plant; c) identification of areas that are, or are proposed, to contain Potentially Acid Forming mining waste em placements; d) identification of areas that are, or are proposed, to contain coarse rejects within mining waste em placements; e) identification of areas that are, or are proposed, to contain tailings within mining waste emplacements; f) demonstration of how operations of the mining waste emplacement areas are consistent with the accepted design plan for the facility; and g) decommissioning and rehabilitation strategies for the mining waste emplacement areas that demonstrate consistency with the conditions of this environmental authority.

    page 41Rehabilitation, Waste
  140. F22

    The mining waste disposed of within the open pit must be designed to ensure all seepage from beneath the mining waste emplacement areas is directed towards the open pit prior to decommissioning and rehabilitation. Coal Handling and Preparation Plant Waste

    page 41Rehabilitation, Waste
  141. F23

    A Coal Handling and Preparation Plant Waste Management Plan must be developed by an appropriately qualified and suitable person and implemented prior to the commencement of mining activities other than mineral development maintenance activities. 41 DEPARlMENT OF ENVIRONMENT AND HERITAGE PR~ Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310

    page 41Waste
  142. F24

    The Coal Handling and Preparation Plant Waste Management Plan must include at a minimum: a) programs for progressive characterisation of tailings and coarse reject waste prior to disposal for net acid producing potential and the following contaminants: Iron (Fe), Aluminium (AI), Copper (Cu), Magnesium (Mg), Manganese (Mn), Calcium (Ca), Sodium (Na) and Sulphate (S04); b) identification of environmental issues and potential environmental impacts from the CHPP waste; c) control measures for routine operations to minimise the likelihood of environmental harm; d) contingency plans and emergency procedures for non-routine situations; e) a program for monitoring and review of the effectiveness of the Coal Handling and Preparation Plant Waste Management Plan. f) the process for the quantification of availability or leachability of metals from the tailings; g) placement strategies of tailings material within the Tailings Storage Facility; h) the progressive 3D survey of all tailings disposal locations within the mining waste emplacement areas; i) placement strategies of coarse reject waste in the mining waste emplacement area to enable successful rehabilitation outcomes in accordance with conditions of this environmental authority; j) the keeping of records of disposal to indicate locations and characteristics of coarse reject waste disposed of within mining waste emplacement areas.

    page 42Rehabilitation, Waste, Monitoring and reporting
  143. F25

    The Coal Handling and Preparation Plant Waste Management Plan must be reviewed each calendar year and a report prepared by an appropriately qualified person. The report must: a) assess the plan against the requirements under condition F24; b) include recommended actions to ensure actual and potential environmental impacts are effectively managed for the coming year; and c) identify any amendments made to the water management plan following the review.

    page 42Waste, Monitoring and reporting
  144. F26

    The holder of this environmental authority must attach to the review report required by condition F25, a written response to the report and recommended actions, detailing the actions taken or to be taken by the environmental authority holder on stated dates: a) to ensure compliance with this environmental authority; and b) to prevent a recurrence of any non-compliance issues identified.

    page 42Monitoring and reporting
  145. F27

    The review report required by condition F25 and the written response to the review report required by condition F26 must be submitted to the administering authority with the subsequent annual return under the signature of the appointed signatory for the annual return.

    page 42Monitoring and reporting
  146. F28

    A copy of the Coal Handling and Preparation Plant Waste Management Plan must be provided to the administering authority on request.

    page 42Waste
  147. F29

    The disposal of all PAF coarse reject waste, identified by condition F24, must be encapsulated with NAF mining waste and disposed in a manner such that the coarse reject waste will not cause significant harm to the environment for the foreseeable future.

    page 42Waste
  148. F30

    All tailings must be disposed of within an authorised Tailings Storage Facility.

    page 42Waste
  149. F31

    The coarse reject waste encapsulated within mining waste emplacement areas situated within the open pit must be designed to ensure all seepage from beneath the waste rock emplacement areas is directed towards the open pit prior to decommissioning and rehabilitation. ) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 42 Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN101017310 Future CHPP Waste Disposal

    page 42Rehabilitation, Waste
  150. F32

    The holder of the environmental authority must complete an investigation into the technical and economic viability of future Coal Handling and Preparation Plant waste by an appropriately qualified person and submitted to the administering authority by 2 September 2018.

    page 43Waste
  151. F33

    The investigation under condition F32 must: a) provide how the environmental authority holder will manage Coal Handling and Preparation Plant waste beyond 2 September 2019; b) the investigation under condition F32 must, at a minimum, include: i. a justification for the proposed management actions for Coal Handling and Preparation Plant waste, including an outline of waste management strategies that were not considered to be feasible; ii. an identification of the environmental impacts the future management of Coal Handling and Preparation Plant waste may have; iii. an identification of any mitigation measures that would be required to be implemented for future management of Coal Handling and Preparation Plant waste; and iv. an identification of any proposed amendments to the environmental authority that would be required to authorise the future management of Coal Handling and Preparation Plant waste. Rehabilitation landform criteria

    page 43Rehabilitation, Waste
  152. F34

    Land disturbed by mining must be rehabilitated in accordance with Appendix 1: Rehabilitation Requirements.

    page 43Rehabilitation
  153. F35

    All areas significantly disturbed by mining activities must be rehabilitated to a stable landform with a self-sustaining vegetation cover in accordance with Table 26: Final/and use and rehabilitation approval schedule, Table 27: Landform design criteria and Figure 5: Final Landform Rehabilitation. NOTE: The proposed final landform depicted in Figure 5: Final Landform Rehabilitation may change following the Wildlife Corridor Strategy completion in accordance with condition F47 and F48.

    page 43Rehabilitation, Biodiversity
  154. F36

    Self-sustaining vegetation, as per Appendix 1: Rehabilitation Requirements, must be consistent with the reference sites identified in Table 28: Reference Sites. Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310 Table 26: Final land use and rehabilitation approval schedule Domains Pits and Mine Waste Tailings Infrastructure Remainder of Pits Mine Waste Storage Mining Lease Area Facility Approximate surface area (ha) 1,887 I 14,613 2,237 2,016 43,937 Pre-mine land use Combination of low intensity_cattle razin!:l and bushland Post-mine land use ! Combination of Low intensity Voids to Low intensity Combination of low equilibrate with I I low Intensity cattle grazing cattle grazing intensity cattle 1 water over time cattle grazing grazing and I and bushland I i for storage and I I bushland I stock watering. Post-mine land capability Voids - Class V Land Suitability (Low lntensi~ Grazing) I classification All other areas- Class Ill or IV1 I I Projective cover range(%) Not applicable >70% vegetative >70% I > 70% vegetative Consistent with cover is present vegetative cover is present existing vegetation (or 50% ifrocks, cover is (or 50% if rocks, I as these areas are logs or other logs or other present (or going to have features of cover 50% if rocks , features of cover minimal are present), logs or other are present), I disturbance. : features of cover are l I present), as per A Land Capabt.l.tty .. for Agrtcultural Purposes (J. Rosser, G.L. Swartz, N.M. Dawson and H.S. I 1974) Classtftcatton Bnggs, Domains Table 27: Landform design criteria Approximate Surface Area (ha) Target Slope Range (degrees) 16,447 1. Pits and Mine Void- Pit 1 Final void batter slopes will be designed and excavated

    page 43Rehabilitation, Waste, Biodiversity
  155. F36

    A rehabilitation management plan must be developed by an appropriately qualified person and implemented prior to the commencement of mining activities other than mineral development maintenance activities. Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310

    page 45Rehabilitation
  156. F37

    The rehabilitation management plan must: a) provide for the effective management of actual and potential environmental impacts and for the rehabilitation of significantly disturbed land resulting from the mining activities carried out under this environmental authority; b) be developed in accordance with the administering authorities Guideline- Rehabilitation requirements for mining projects and must include at least the following components: i. finalisation of rehabilitation objectives, rehabilitation indicators and completion criteria for inclusion in Appendix 1: Rehabilitation Requirements; ii. measures to ensure the rehabilitation objectives defined in Appendix 1: Rehabilitation Requirements are met; iii. a justification of the rehabilitation indicators defined in Appendix 1: Rehabilitation Requirements, including how the relationship between the indicator and the objective has been established; iv. a justification that the completion criteria defined in Appendix 1: Rehabilitation Requirements will determine if the rehabilitation objectives have been met and are suitable to ensure the post mine land use identified in Table 26: Final/and use and rehabilitation approval schedule; v. monitoring of reference sites identified in Table 28: Reference Sites inclusive of statistical design; vi. rehabilitation methods applied to each domain; vii. landform design criteria including: - end of mine design, consistent with Table 27: Landform design criteria; and - the proposed mosaic of vegetation communities representing the reference points identified in Table 28: Reference Sites; viii. a justification of how landform design will be consistent with the surrounding topography; ix. a justification of how the landform design criteria identified within Table 27: Landform design criteria are suitable to ensure the post mine land use identified in Table 26: Final/and use and rehabilitation approval schedule; x. schematic representation of final landform inclusive of: - drainage design and features; - slope designs; - cover design; - erosion controls proposed on reformed land; xi. explain planned native vegetation rehabilitation areas and wildlife corridors in accordance with condition F47; xii. rehabilitation monitoring and maintenance requirements to be applied to all areas of disturbance, including - how the rehabilitation indicators defined in Appendix 1: Rehabilitation Requirements are to be measured; - how the results of monitoring of indicators defined in Appendix 1: Rehabilitation

    page 46Rehabilitation, Land and soil, Biodiversity, Monitoring and reporting
  157. F38

    The rehabilitation management plan must be reviewed each calendar year and a report prepared by an appropriately qualified person. The report must: a} assess the plan against the requirements under condition F37; b) include recommended actions to ensure actual and potential environmental impacts and areas of significantly disturbed land are effectively managed for the coming year; and c) identify any amendments made to the rehabilitation management plan.

    page 47Rehabilitation, Monitoring and reporting
  158. F39

    The holder of this environmental authority must attached to the review report required by condition F38, a written response to the report and recommended actions, detailing the actions taken or to be taken by the environmental authority holder on stated dates: a) to ensure compliance with this environmental authority; and b) to prevent a recurrence of any non-compliance issues identified.

    page 47Monitoring and reporting
  159. F40

    The review report required by condition F38 and the written response to the review report required by condition F37 must be submitted to the administering authority with the subsequent annual return under the signature of the appointed signatory for the annual return.

    page 47Monitoring and reporting
  160. F41

    A copy of the rehabilitation management plan must be provided to the administering authority on request.

    page 47Rehabilitation
  161. F42

    The rehabilitation management plan must be submitted to the administering authority prior to the commencement of mining activities other than mineral development maintenance activities.

    page 47Rehabilitation
  162. F43

    Rehabilitation objectives, indicators and completion criteria developed as per condition F37(b}(i} and as per Appendix 1: Rehabilitation Requirements must be finalised based on the rehabilitation management plan required under condition F36 and submitted to the administering authority prior to the commencement of mining activities other than mineral development maintenance activities. Rehabilitation Monitoring Program

    page 47Rehabilitation, Monitoring and reporting
  163. F44

    Once rehabilitation has commenced, the holder of the environmental authority must conduct a rehabilitation monitoring program on a yearly basis, which must include sufficient spatial and temporal replication to enable statistically valid conclusions as established under the rehabilitation management plan .

    page 47Rehabilitation, Monitoring and reporting
  164. F45

    The rehabilitation monitoring program must be consistent with the rehabilitation management plan required under condition F37 and be developed and implemented by a person possessing appropriate qualifications and experience in the field of rehabilitation management, nominated by the environmental authority holder. 47 PR~ Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310

    page 47Rehabilitation, Monitoring and reporting
  165. F46

    The rehabilitation monitoring program must be included in the Plan of Operations and updated with each subsequent Plan of Operations, describing: a) how the rehabilitation objectives as defined in Appendix 1: Rehabilitation Requirements will be achieved; and b) verification of rehabilitation success as per the rehabilitation management plan required under condition F37. Wildlife Corridor Investigation

    page 48Rehabilitation, Monitoring and reporting
  166. F47

    A Wildlife Corridor Strategy must be developed by an appropriately qualified person and submitted to the administering authority by 2 September 2019.

  167. F48

    The Wildlife Corridor Strategy must: a) provide how the environmental authority holder will successfully reinstate sufficient wildlife corridor(s) (minimum one wildlife corridor) across pits 1 to 6 to facilitate the interaction and movement of native fauna species east-west; b) The Wildlife Corridor Strategy must, at a minimum, include: i. details of the fauna species dependent on vegetation and ecosystems which existed prior to the mining project's development in the area of pits 1 to 6 for migration and/or habitat; ii. a discussion on the temporary, or permanent, impacts likely to be experienced by migrating fauna species dependent on vegetation or ecosystems in the area of pits 1 to 6 as a result of mining activities; iii. details of wildlife corridors installed, or to be implemented during the mine's operation along the northern and southern creek diversions, to mitigate the impacts and effects on fauna species dependent on the area of pits 1 to 6 for migration or habitat; iv. a plan to revegetate the proposed corridor(s) with local native vegetation similar in composition to that which existed prior to the mining project's development; v. a discussion of the proposed wildlife corridor's ability to re-establish and support landscape, habitat, ecological and evolutionary connectivity; vi. detailed information to support the proposed width of the corridor(s), such as: - the length to width ratio; - the maintenance of functionality of the east-west linkage throughout the mining operation( through staged mining and staged rehabilitation); and - the maintenance of landform and acceptable slope and stability; vii. include rehabilitation objectives, indicators and success criteria specific to reinstatement of the wildlife corridor(s) in terms of ecosystem function , structure and composition for inclusion in Appendix 1: Rehabilitation Requirements; viii. the timing by which the proposed wildlife corridor(s) is to be reinstated and monitoring required to confirm its successful reinstatement.

    page 48Rehabilitation, Biodiversity, Monitoring and reporting
  168. F49

    Upon the administering authority's consideration and acceptance of the submitted Wildlife Corridor Strategy, the environmental authority holder must revise the Rehabilitation Management Plan required by condition F47 to include details of the wildlife corridor and detail the completion criteria for the areas to be rehabilitated to wildlife corridor(s). Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: MIN101017310

    page 48Rehabilitation
  169. F50

    Rehabilitation objectives, indicators and success criteria specific to the reinstatement of the wildlife corridor(s} as per Appendix 1: Rehabilitation Requirements must be finalised based on the: a} Wildlife Corridor Strategy required under condition F47; and b) any comments made by the administering authority with regards to the submitted Wildlife Corridor Strategy; c) and submitted to the administering authority by 2 September 2020. Residual Void

    page 49Rehabilitation
  170. F51

    The holder of this environmental authority must complete an investigation into residual voids and submit a report to the administering authority by 2 September 2019. The investigation must include: a} a study of options available for minimising final void area and volume; b) a void hydrology study, addressing the long-term water balance in the voids, connections to groundwater resources and water quality parameters in the long term; c) a study of the measures to protect the residual voids, uncompacted overburden and workings from the probable maximum flood (PMF} level; d) a pit wall stability study, considering the effects for long-term erosion and weathering of the pit wall and the effects of significant hydrological events; and e) a study of void capability to support native flora and fauna.

    page 49Groundwater, Land and soil, Biodiversity, Monitoring and reporting
  171. F52

    Residual voids must not cause any serious environmental harm to land, surface waters or any recognised groundwater aquifer, other than the environmental harm constituted by the existence of the residual void itself and subject to any other condition of this environmental authority.

    page 49Groundwater, Surface water
  172. F53

    At completion of decommissioning and rehabilitation, the residual void must be protected from probable maximum floods (PMFs} from nearby watercourses such that the protection is sustainable for the foreseeable future. Post Closure Management Plan

    page 49Rehabilitation, Surface water
  173. F54

    A Post Closure Management Plan for the site must be developed and submitted to the administering authority at least 18 months prior to the final coal processing on site and implemented for a nominal period of: a} at least 30 years following final coal processing on site; or b) a shorter period if the site is proven to be geotechnically and geochemically stable and it can be demonstrated to the satisfaction of the administering authority that no release of contaminants from the site will result in environmental harm. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: MIN1 01017310

  174. F55

    The Post Closure Management Plan must include the following elements: a) operation and maintenance of: i. wastewater collection and reticulation systems; ii. wastewater treatment systems; iii. the groundwater monitoring network; iv. final cover systems of spoil dumps; and v. vegetative cover; and b) monitoring of: i. surface water quality; ii. groundwater quality; iii. seepage rates; iv. erosion rates; v. the integrity and stability all slopes, ramps and voids; and vi. the health and resilience of native vegetation cover. Infrastructure

    page 50Groundwater, Surface water, Land and soil, Biodiversity, Monitoring and reporting
  175. F56

    All infrastructure, constructed by or for the environmental authority holder during the licensed activities including water storage structures, must be removed from the site prior to surrender, except where agreed in writing by the post mining land owner I holder. NOTE: This is not applicable where the landowner I holder is also the environmental authority holder. Exploration

  176. F57

    Mining Activities undertaken in Domain 4, identified in Table 1: Mining Domains and Figure 1: Mining Domains must not include bulk sampling or costeaning.

  177. F58

    The holder of the environmental authority must not drill, excavate or clear vegetation for exploration activities: a) in standing waters, wetlands or lakes; or b) on the sloped banks or within 3m of the top of the bank of 5m of the toe of the bank of any watercourse; or c) within, or on the levee banks of the normal flow channel of any watercourse. NOTE: To provide clarity, geotechnical drilling associated with the design of creek diversions and associated levees is not subject to this condition. Such works will be undertaken in accordance with the latest version of the Guideline - activities in a watercourse, lake or spring associated with mining operations. Non-artesian Drill Holes

    page 50Surface water, Regulated structures, Biodiversity
  178. F59

    The holder of the environmental authority must decommission and rehabilitate all non-artesian exploration drill holes, apart from those to be converted to a monitoring bore or a water bore, but no later than 3 months after the hole was drilled.

    page 50Rehabilitation, Groundwater, Monitoring and reporting
  179. F60

    The holder of the environmental authority must isolate sub-artesian water aquifers where a drill hole intersects more than one water bearing strata in accordance with the 'Minimum Construction Requirements for Water Bores in Australia' (Australian Government, February 2012) or latest edition.

    page 50Groundwater
  180. F61

    Non-artesian exploration drill holes to be changed to water bores must be converted within 3 months of the exploration drill hole being drilled. NOTE: Water Bores are licensed under the Water Act 2000. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310

    page 50Groundwater
  181. F62

    The holder of the environmental authority must convert all non-artesian exploration drill holes required for ongoing monitoring and evaluation purposes to monitoring bores: a) within 3 months of the exploration drill hole being drilled; and b) in accordance with the 'Minimum Construction Requirements for Water Bores in Australia' (Australian Government, February 2012) or latest edition.

    page 51Groundwater, Monitoring and reporting
  182. F63

    The location of each non-artesian exploration drill hole to be converted to a monitoring bore must be included within the Plan of Operations. Monitoring Bores

    page 51Groundwater, Monitoring and reporting
  183. F64

    Groundwater monitoring bores must be constructed in accordance with methods prescribed in the Minimum Construction Requirements for Water Bores in Australia' -3rd Edition (LWBC), or equivalent.

    page 51Groundwater, Monitoring and reporting
  184. F65

    The holder of this environmental authority must decommission and rehabilitate all monitoring bores in accordance with the Minimum Construction Requirements for Water Bores in Australia' (Australian Government, February 2012) or latest edition. Mineral Development Licence 285

    page 51Rehabilitation, Groundwater, Monitoring and reporting
  185. F66

    All outstanding rehabilitation on the area of the superseded Mineral Development Licence 285, previously approved under Environmental Authority MIN100746508 must be rehabilitated in accordance with this Environmental Authority. ) 51 Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN101017310 Schedule FX: Biodiversity Biodiversity Offset Plan

    page 51Rehabilitation, Biodiversity
  186. FX1

    A Biodiversity Offset Plan must be developed by an Appropriately Qualified Person. NOTE: Where there is inconsistency between the conditions of this environmental authority and conditions contained within Part D of Appendix 2 of the Coordinator-Generals Evaluation Report on the environmental impact statement- Alpha Coal Project dated May 2012, the Coordinator-Generals' conditions prevail.

    page 52Biodiversity, Monitoring and reporting
  187. FX2

    The Biodiversity Offset Plan must: a) identify each proposed stage of the project that may impact State Significant Biodiversity Values; b) provide for how potential impacts to State Significant Biodiversity Values will be assessed in accordance with the Queensland Biodiversity Offset Policy or an alternative approach approved by the administering authority; and c) include a detailed description of how the Biodiversity Offset Plan aligns with the requirements for offsets imposed on the holder under the Environmental Protection and Biodiversity Act 1999 (Cth). NOTE: The holder may apply to change the Biodiversity Offset Plan at any time, by submitting a new Biodiversity Offset Plan or an amendment to the plan to the administering authority for approval.

    page 52Biodiversity
  188. FX3

    The Biodiversity Offset Plan must be submitted to the administering authority and approved prior to the commencement of Mining Activities, other than Minor Early Works and Mineral Development Maintenance Activities. Assessment of State Significant Biodiversity Values

    page 52Biodiversity
  189. FX4

    In accordance with the Biodiversity Offset Plan, an assessment for each stage of the project identified in the plan must be undertaken by an Appropriately Qualified Person to identify the presence, type, and extent of any State Significant Biodiversity Values, including an Ecological Equivalence Assessment for those areas to be disturbed. NOTE: commencement of a stage of mining includes undertaking any disturbance associated with Mining Activities.

    page 52Biodiversity
  190. FX5

    The assessment required under condition FX4 for Stages 1 and 2 of the project (as identified in the EPBC Act Report, June 2012) must be submitted together to the administering authority at least 2 months prior to the commencement of Mining Activities, other than Minor Early Works and Mineral Development Maintenance Activities, for the relevant stage. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN101017310 Biodiversity Offset Strategy

    page 52Biodiversity, Monitoring and reporting
  191. FX6

    Where the assessment required by condition FX4 identifies that the proposed Mining Activities for a stage of the project will potentially impact on a State Significant Biodiversity Value, the holder of the environmental authority must develop a Biodiversity Offset Strategy for the proposed stage of mining. NOTE: The holder may apply to change the Biodiversity Offset Strategy for a mining stage, by submitting a new Biodiversity Offset Strategy or amendment to the strategy to the administering authority for approval.

    page 53Biodiversity
  192. FX7

    The Biodiversity Offset Strategy for the proposed stage of mining must: a) quantify the offset requirements for that stage of mining and include a detailed description of the surveyed locations of State Significant Biodiversity Values, having regard to the assessment conducted under condition FX4; b) if the holder of the environmental authority proposes to offset impacts to State Significant Biodiversity Values through: 1. a Legally Secured offset, identify the land within the Galilee Basin bioregions (including the land on which the relevant mining activity is carried out) or on other land in the State which may have the relevant State Significant Biodiversity Values and identify the proposed process by which that land will be investigated (including Ecological Equivalence Assessment) and Legally Secured; and/or 2. an offset payment: i. Indicate any commitment to make an offset payment in accordance with the Queensland Biodiversity Offset Policy or an alternative approach approved by the administering authority, including the amount(s) and timing of that payment; and/or ii. indicate the level of offset delivery for which an offset payment(s) may be considered; and/or 3. an offset transfer, indicate the level of offset delivery for which an offset transfer may be considered; and c) include a proposal that the ecological equivalence assessment of the impacted area and offsets area be undertaken in accordance with the Queensland Biodiversity Offset Policy or an alternative approach approved by the administering authority.

    page 53Biodiversity
  193. FX8

    The Biodiversity Offset Strategy required under condition FX6 must: (a) be submitted to the administering authority for approval no more than 6 months after the commencement of Mining Activities, other than Minor Early Works and Mineral Development Maintenance Activities, for the stage; and Offsets Delivery

    page 53Biodiversity
  194. FX9

    The holder must provide a Legally Secured offset for any land identified in condition FX7 in accordance with the Queensland Biodiversity Offset Policy, or an alternative approach approved by the administering authority, within 3 years of submitting the relevant Biodiversity Offset Strategy.

    page 53Biodiversity
  195. FX10

    The holder must provide any offset payment(s) identified in condition FX7 in accordance with the Queensland Biodiversity Offset Policy or an alternative approach approved by the administering authority: (a) in accordance with any commitment given in the Biodiversity Offset Strategy; and (b) within 3 years of submitting the relevant Biodiversity Offset Strategy.

    page 53Biodiversity
  196. FX11

    The holder must enter into an agreement with the administering authority to provide any offset transfer identified in condition FX7 in accordance with the Queensland Biodiversity Offset Policy or an alternative approach approved by the administering authority within 3 years of submitting the relevant Biodiversity Offset Strategy. Legally Secured Offsets (Direct Offsets) for land owned by Holder

    page 53Biodiversity
  197. FX12

    The holder must develop an Offset Area Management Plan for the land it owns that is Legally Secured under FX11 in the fonnat specified by the administering authority.

    page 53Biodiversity
  198. FX13

    The Offset Area Management Plan required under condition FX 12 must contain the following information: a) management and environmental objectives and outcomes, performance criteria and monitoring requirements; }"-" Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310 b) an analysis of the risks to achieve the objectives and outcomes; c) any restrictions imposed on the use of the offset area, including the management/control of weeds, cattle and site access; d) the activities that will be undertaken to achieve the objectives and outcomes, including the management/control of weeds, site access, erosion and sediment and fire management; e) a map that shows spatially the areas subject to the Offset Area Management Plan; and f) a reporting programme.

    page 53Land and soil, Biodiversity, Monitoring and reporting
  199. FX14

    The Offset Area Management Plans must be submitted to the Administering Authority with 3 months of the land being Legally Secured under condition FX9.

    page 54Biodiversity
  200. FX15

    Land Legally Secured under FX9 must be managed in accordance with the Offset Area Management Plan as approved by the administering authority.

    page 54Biodiversity
  201. FX16

    Land Legally Secured under FX9 must be managed in accordance with the approved Offset Area Management Plan for each stage for a period of 30 years unless otherwise approved.

    page 54Biodiversity
  202. FX17

    Offset Transfers The holder of the environmental authority must comply with the requirements of any agreement under condition FX11. 54 Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: Environmental Authority: MIN101017310 Schedule G: Regulated Structures

    page 54Regulated structures, Biodiversity
  203. G1

    The hazard category of any structure must be assessed by a suitably qualified and experienced person: a) in accordance with the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams; and b) in any of the following situations: i. prior to the design and construction of the structure; or ii. prior to any change in its purpose or the nature of its stored contents; and iii. in accordance with the Manual for assessing Hazard Categories and Hydraulic Performance of Dams.

    page 55Regulated structures
  204. G2

    A hazard assessment report and certification must be prepared for any structure assessed and the report may include a hazard assessment for more than one structure.

    page 55Monitoring and reporting
  205. G3

    The holder must, on receipt of a hazard assessment report and certification, provide to the administering authority one paper copy and one electronic copy of the hazard assessment report and certification.

    page 55Monitoring and reporting
  206. G4

    Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams.

    page 55Regulated structures
  207. G5

    The holder must take reasonable and practical measures so that each dam associated with the mining activity is designed, constructed, operated and maintained in accordance with accepted engineering standards and is fit for the purpose for which it is intended.

    page 55Regulated structures
  208. G6

    All regulated structures must be designed by, and constructed under the supervision of, a suitably qualified and experienced person in accordance with the requirements of the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams.

    page 55Regulated structures
  209. G7

    Construction of a regulated structure is prohibited unless the holder has: a) submitted a hazard category assessment report and certification to the administering authority; b) commissioned a suitably qualified and experienced person to prepare a design plan for the structure; and c) received the certification from a suitably qualified and experienced person for the design and design plan and the associated operating procedures in compliance with the relevant condition of this authority.

    page 55Regulated structures, Monitoring and reporting
  210. G8

    Certification must be provided by the suitably qualified and experienced person who oversees the preparation of the design plan, in the form set out in the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310

    page 55Regulated structures
  211. G9

    Regulated structures must: a) be designed and constructed in accordance with and conform to the requirements of the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams; b) be designed and constructed with due consideration given to ensuring that the design integrity would not be compromised on account of: i. floodwaters from entering the regulated dam from any watercourse or drainage line; and ii. wall failure due to erosion by floodwaters arising from any watercourse or drainage line.

    page 56Surface water, Regulated structures, Land and soil
  212. G10

    The design plan for a regulated structure must include, but is not limited to: a) certification that the design plan: i. is in accordance with the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams, including subsidiary certifications if necessary; and ii. addresses the requirements in G10(b) to (h) b) A design report which provides: i. a description of all the documents which constitute the design plan; ii. a statement of: a. the applicable standards including engineering criteria, industry guidelines, relevant legislation and regulatory documents, relied upon in preparing the design plan; and b. all relevant facts and data used in preparing the design plan, including any efforts made to obtain necessary facts and data, and any limitations or assumptions to facts and data used in preparing the design plan; c. the hazard category of the regulated structure; and d. setting out the reasoning of the suitably qualified and experienced person who has certified the design plan, as to how the design plan provides the necessary required performance; iii. documentation of hydrological analyses and estimates required to determine all elements of the design including volumes and flow capacities; iv. detailed criteria for the design, operation, maintenance and decommissioning of the regulated structure, including any assumptions; v. design, specification and operational rules for any related structures and systems used to prevent failure scenarios; c) Drawings showing the lines and dimensions, and locations of built structures and land forms associated with the regulated structure; d) Consideration of the interaction of the pit design with the levee or regulated dam design; e) An operational plan that includes: i. normal operating procedures and rules (including clear documentation and definition of process inputs in the DSA allowance); ii. contingency and emergency action plans including operating procedures designed to avoid and/or minimise environmental impacts including threats to human life resulting from any overtopping or loss of structural integrity of the regulated structure; f) A plan for the decommissioning and rehabilitation of the regulated structure at the end of its operational life; g) Details of reports on investigations and studies done in support of the design plan; h) Any other matter required by the suitably qualified and experienced person. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310

    page 56Rehabilitation, Regulated structures, Subsidence, Monitoring and reporting
  213. G11

    Certification by the suitably qualified and experienced person who supervises the construction must be submitted to the administering authority on the completion of construction of the regulated structure, and state that: a) the 'as constructed' drawings and specifications meet the original intent of the design plan for that regulated structure; b) construction of the regulated structure is in accordance with the design plan;

    page 57Regulated structures
  214. G12

    Where a regulated dam is to be managed as part of an integrated containment system and the DSA volume is to be shared across the integrated containment system, the design and operating rules for the system as a whole must be documented in a system design plan that is certified by a suitably qualified and experienced person.

    page 57Regulated structures
  215. G13

    The system design plan must contain: a) the design plans, and b) the 'as constructed' plans, and c) the operational rules for each individual regulated dam that forms part of the integrated system , and d) the standards of serviceability and accessibility of water transfer equipment or structures, and e) the operational rules for the system as a whole. Operation of a regulated structure

    page 57Regulated structures
  216. G14

    Operation of a regulated structure is prohibited unless: a) the holder has submitted to the administering authority: i. one paper copy and one electronic copy of the design plan and certification of the 'design plan' in accordance with condition G7, and ii. a set of 'as constructed' drawings and specifications, and iii. certification of those 'as constructed drawings and specifications' in accordance with condition G8, and iv. where the regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, a copy of the certified system design plan. b) the requirements of this authority relating to the construction of the regulated structure have been met; and c) Relevant details for the dam have been included in Table 29: Location of Regulated Structures and Table 30: Basic Details of Regulated Dams of this authority.

    page 57Regulated structures
  217. G15

    Each regulated structure must be maintained and operated in a manner that is consistent with the current design plan, the current operational plan, and the associated certified 'as constructed' drawings for the duration of its operational life until decommissioned and rehabilitated.

    page 57Rehabilitation, Regulated structures
  218. G16

    The holder must take reasonable and practicable control measures to prevent the causing of harm to persons, livestock or wildlife through the construction and operation of a regulated structure. Reasonable and practicable control measures may include, but are not limited to: a) the secure use of fencing, bunding or screening; and b) escape arrangements for trapped livestock and fauna. Mandatory reporting level

    page 57Regulated structures, Biodiversity, Monitoring and reporting
  219. G17

    The Mandatory Reporting Level (the MRL) must be marked on a regulated dam in such a way that during routine inspections of that dam, it is clearly observable.

    page 57Regulated structures, Monitoring and reporting
  220. G18

    The holder must, as soon as practical and within forty-eight hours of becoming aware, notify the administering authority when the level of the contents of a regulated dam reaches the Mandatory Reporting Level. f Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN101017310

    page 57Regulated structures, Monitoring and reporting
  221. G19

    The holder must, immediately on becoming aware that the Mandatory Reporting Level has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated dam. Annual inspection report

    page 58Regulated structures, Monitoring and reporting
  222. G20

    Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person.

    page 58Regulated structures
  223. G21

    At each annual inspection, the condition and adequacy of all components of the regulated structure must be assessed: a) against the most recent hazard assessment report and design plan (or system design plan); b) against recommendations contained in previous annual inspections reports; c) against recognised dam safety deficiency indicators; d) for changes in circumstances potentially leading to a change in hazard category; e) for conformance with the conditions of this authority; f) for conformance with the 'as constructed' drawings; g) for the adequacy of the available storage in each regulated dam, based on an actual observation or observations taken after 31 May each year but prior to 1 November of that year, of accumulated sediment, state of the containment barrier and the level of liquids in the dam (or network of linked containment systems); h) for evidence of conformance with the current operational plan.

    page 58Regulated structures, Land and soil, Monitoring and reporting
  224. G22

    A suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and including recommended actions to ensure the integrity of the regulated structure.

    page 58Regulated structures, Monitoring and reporting
  225. G23

    The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams.

    page 58Regulated structures, Monitoring and reporting
  226. G24

    The holder must: a) upon receipt of the annual inspection report, consider the report and its recommendations and take action to ensure that the regulated structure will safely perform its intended function; and b) within twenty business days of receipt of the annual inspection report, notify the administering authority in writing, of the recommendations of the inspection report and the actions being taken to ensure the integrity of each regulated structure.

    page 58Regulated structures, Monitoring and reporting
  227. G25

    A copy of the annual inspection report must be provided to the administering authority upon request and within ten business days of receiving a request from the administering authority under this condition. Design storage allowance

    page 58Monitoring and reporting
  228. G26

    On 1 November of each year, storage capacity must be available in each regulated dam (or network of linked containment systems with a shared DSA volume), to meet the Design Storage Allowance (DSA) volume for the dam (or network of linked containment systems).

    page 58Regulated structures
  229. G27

    The holder must, as soon as possible and within forty-eight hours of becoming aware that the regulated dam (or network of linked containment systems) will not have the available storage to meet the Design Storage Areas volume on 1 November of any year, notify the administering authority. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310

    page 58Regulated structures, Monitoring and reporting
  230. G28

    The holder must, immediately on becoming aware that a regulated dam (or network of linked containment systems) will not have the available storage to meet the Design Storage Area volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated dam or linked containment systems. Performance review

    page 59Regulated structures
  231. G29

    The holder must assess the performance of each regulated dam or linked containment system over the preceding November to May period based on actual observations of the available storage in each regulated dam or linked containment system taken prior to 1 July of each year.

    page 59Regulated structures
  232. G30

    The holder must take action to modify its water management or linked containment system so as to ensure that the regulated dam or linked containment system will perform in accordance with the requirements of this authority, for the subsequent November to May period. NOTE: Action may include seeking the necessary approvals for physical modification of a regulated dam. Transfer arrangements

    page 59Regulated structures
  233. G31

    The holder must provide a copy of any reports, documentation and certifications prepared under this authority, including but not limited to any Register of Regulated Structures, hazard assessment, design plan and other supporting documentation, to a new holder and the administering authority on transfer of this authority. Decommissioning and rehabilitation

    page 59Rehabilitation, Regulated structures, Monitoring and reporting
  234. G32

    Prior to the cessation of the environmentally relevant activity, each regulated structure must be decommissioned such that: a) ongoing environmental harm is minimised by the regulated structure: i. becoming a safe site for humans and animals at the completion of rehabilitation; and ii. becoming a stable landform, that no longer contains flowable substances and minimises erosion impacts; and iii. not allowing for acid mine drainage; and iv. being approved or authorised under relevant legislation for a beneficial use; and v. being a void authorised by the administering authority to remain after decommissioning; and b) the regulated structure is compliant with all other relevant rehabilitation requirements of this authority. Regulated structures location and performance

    page 59Rehabilitation, Regulated structures, Land and soil
  235. G33

    Each regulated structure named in Column 1, Table 29: Location of Regulated Structures must be wholly located within the control points noted in columns 2 and 3 of Table 29: Location of Regulated Structures, below, for that structure. Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: Environmental Authority: MIN101017310 Table 29: Location of Regulated Structures Column 1 Column 2 Column 3 Column4 Name of Regulated Structure1 Latitude2 Longitude2 Levees only Alpha Bulk Sample Test Pit (GDA94) (GDA94) Unique Location ID3 Site Water Control Pond 446066 7431127 N/A 446295 7431241 446241 7431797 446029 7430823 Alpha Bulk Sample Test Pit 446047 7430780 N/A 446282 7430752 446241 7430300 446029 7430326 Alpha Bulk Sample Test Pit 447112 7431158 Control Point 1 Flood Protection Levee 447082 7430892 Control Point 2 446758 7430931 Control Point 3 Tailings Storage Facility 446744 7430794 Control Point 4 Tailings Storage Decant Dam 446564 7430669 Control Point 5 446534 7430574 Control Point 6 446587 7430441 Control Point 7 446553 7430361 Control Point 8 446409 7430298 Control Point 9 446350 7430239 Control Point 10 446325 7430165 Control Point 11 446217 7430194 Control Point 12 446229 7430275 Control Point 13 445962 7430305 Control Point 14 446058 7431130 Control Point 15 446293 7231254 Control Point 16 453281 7423761 N/A 453700 7428263 452625 7430578 N/A 451407 7429219 451069 7422290 452337 7420777 451079 7427316 450779 7427331 450850 7428779 451149 7428764

    page 59Regulated structures, Waste
  236. G34

    Each regulated dam named in column 1 of Table 29:Location of Regulated Structures, must be consistent with the details noted in columns 2 through to and including 7 of Table 30: Basic Details of Regulated Dams, below, for that dam . Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: Environmental Authority: MIN101017310 Table 30: Basic Details of Regulated Dams Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Column 7 Name of Regulated dam Hazard Surface area Max. Max. depth of Spillway Use of dam- Alpha Bulk Sample Test Pit Category of dam at volume of dam at Level Site Water Control Pond Storage of Significant spillway (ha) dam at spillway (m) (mAHD) storm/flood water Alpha Bulk Sample Test Pit spillway contaminated by Significant 9.12 6 308 Tailings Storage Facility .(ML) the activities Tailings Storage Decant Dam High TBA - Residual bulk High 250 sample pit void, Environmental Dam 1 Significant TBA TBA within the footprint Environmental Dam 2 Significant TBA - Max depth of TBA of future mining Environmental Dam 3 Significant Environmental Dam 4 Significant TBA void TBA operations Environmental Dam 5 Significant Tailings Disposal Environmental Dam 6 Significant TBA 20000 TBA TBA Tailings Decant Environmental Dam 7 Significant 1000 TBA Environmental Dam 8 Significant TBA TBA and Process Environmental Dam 9 Significant 400 TBA WaterRetum Significant TBA TBA Capture MIA Sediment Dam 1A Significant 700 TBA runoff and supply Sediment Dam 1B Significant TBA TBA Sediment Dam 2A Significant 1000 TBA for reuse Sediment Dam 28 Significant TBA TBA Capture CHPP Sediment Dam 3A Significant 1000 TBA runoff and supply Sediment Dam 3B Significant TBA TBA Sediment Dam 4A Significant 1000 TBA for reuse Sediment Dam 4B Significant TBA TBA Pit water Sediment Dam 5A Significant 1000 TBA containment and Sediment Dam 58 Significant TBA TBA supply for reuse Sediment Dam 6A Significant 1000 TBA Pit water Sediment Dam 68 TBA TBA containment and TBA 900 TBA TBA supply for reuse 64 TBA TBA Pit water TBA 1000 TBA TBA containment and TBA TBA supply for reuse TBA 500 TBA TBA Pit water TBA 700 TBA TBA containment and TBA 700 TBA TBA supply for reuse TBA 600 TBA TBA Pit water TBA 600 TBA TBA containment and TBA 700 TBA TBA supply for reuse TBA 800 TBA TBA Capture ROM 300 TBA runoff and supply 600 TBA for reuse 600 TBA Capture ROM 700 TBA runoff and supply 700 TBA for reuse

    page 63Regulated structures, Waste, Land and soil
  237. G35

    Each regulated dam named in column 1 of Table 29: Location of Regulated Structures, must meet the hydraulic performance criteria noted in columns 2 through to and including 4 of Table 31: Hydraulic Performance of Regulated Dams, below, for that dam. --------------~J 65 Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310 Table 31: Hydraulic Performance of Regulated Dams Column 1 Column 2 Column 3 Column4 Name of Regulated dam Spillway Capacity AEP Design Storage Allowance Mandatory Reporting Level Alpha Bulk Sample Test Pit AEP AEP Site Water Control Pond 1:1000 AEP 1:1000 AEP 1:20 AEP 72 hr rainfall Alpha Bulk Sample Test Pit Tailings Storage Facility - - - Water Balance Tailings Storage Decant Dam 1:10000 AEP Water Balance 1:100 AEP 72 hr rainfall 1:10000 AEP Environmental Dam 1 1:100 AEP 72 hr rainfall Environmental Dam 2 1:1000 AEP 20yr 3 months Environmental Dam 3 1:10 AEP 72 hr rainfall Environmental Dam 4 1:1000 AEP 20yr 3 months Environmental Dam 5 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Environmental Dam 6 1:1000 AEP 20yr 3 months 1:10 AEP 72 hr rainfall Environmental Dam 7 1:10 AEP 72 hr rainfall Environmental Dam 8 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Environmental Dam 9 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall 1:1000 AEP 20yr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 1A 1:10 AEP 72 hr rainfall Sediment Dam 18 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 2A 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 28 1:1000 AEP 20yr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 3A 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 38 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 4A 1:1000 AEP 20yr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 48 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 5A 1:1000 AEP 20yr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 58 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 6A 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall Sediment Dam 68 1:1000 AEP 20yr 3 months 1:10 AEP 72 hr rainfall Brine Storage Dam 1:1000 AEP 20yr 3 months 1:10 AEP 72 hr rainfall 1:1000 AEP 20vr 3 months 1:10 AEP 72 hr rainfall 1:1000 AEP 20vr 3 months 1:100 AEP 72 hr rainfall 1:1000 AEP Water Balance

    page 65Regulated structures, Waste, Land and soil, Monitoring and reporting
  238. G36

    Each regulated levee named in column 1 of Table 29: Location of Regulated Structures, must be consistent with the details noted in columns 2 through to and including 6 of Table 32: Basic Details of Regulated Levees, below, for that levee. ------------------~) Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310 Table 32: Basic Details of Regulated Levees Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Name of Regulated Levee DesignAEP Alpha Bulk Sample Test Pit 1:1000 AEP Design Flood Minimum Schedule D Table Use of levee Level1 Levee 1 Location ID1 Flood Protection Levee 1:3000 AEP (mAHD) Level1 Lagoon Creek Levee 1:3000 AEP (mAHD) 1:3000 AEP Sandy Creek Southern Levee (Pit 1:3000 AEP 309.8 310 Control Point 1 Operational Protection) 1:3000 AEP Control Point 2 Flood Protection Sandy Creek Northern Levee (Off-Lease Protection) Control Point 3 of Pit and Pond Spring Creek Northern Levee (Pit Control Point 4 Protection) Control Point 5 Spring Creek Southern Levee (Off-Lease Protection) Control Point 6 67 Control Point 7 Control Point 8 Control Point 9 Control Point 10 Control Point 11 Control Point 12 Control Point 13 Control Point 14 Control Point 15 Control Point 16 303.158 303.658 Ch 23835 Provides 3000yr 303.28 303.78 Ch 22960 ARI flood 303.801 304.301 Ch 21395 immunity to pits 306.179 306.679 Ch 19346 and mining 307.075 307.575 Ch 18275 infrastructure 312.15 312 .65 Ch 10930 313.007 313.507 Ch 9455 315.005 315.505 Ch 5750

    page 66Regulated structures
  239. H1

    The daily operation of the wastewater treatment plant must be carried out by a person(s) with appropriate experience and/or qualifications to ensure the effective operation of that treatment system.

  240. H2

    Pipelines and fittings associated with the effluent irrigation system must be clearly identified. Lockable valves or removable handles must be fitted to all release pipelines situated in public access areas.

  241. H3

    Treated effluent from the sewage treatment plant must only be discharged from the authorised discharge points, as specified in Table 33: Effluent discharge locations and discharged to the areas shown in Table 35: Effluent irrigation locations, in compliance with the limits stated in Table 34: Effluent release limits and the conditions of this authority. Table 33: Effluent Discharge Locations Authorised Discharge Point Location Eastlng (GDA94) Northing (GDA94) Exploration Camp Sewage Treatment Plant 449964 7436955 l Exploration Camp Effluent Discharge Holding Tank 1 449999 7436957 Exploration Camp Sewage Treatment Plant 449989 7437064 I Point 1 Holding Tank 2 450046 7437048 Exploration Camp Sewage Treatment Plant 451754 7437629 i Exploration Camp Effluent Discharge Holding Tank 3 Exploration Camp Sewage Treatment Plant Point2 Holding Tank 4 Construction and Operations Camp Sewage Exploration Camp Effluent Discharge Treatment Plant Effluent Discharge Point 1 Point 3 Exploration Camp Effluent Discharge Point4 Construction and Operations Camp Effluent Discharge Point 1 --------------------~J Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310 Quality characteristics Table 34: Effluent Release Limits Median Maximum 5 day BioloQical oxyQen demand (mQ/L) Release limits - 20 Suspended solids (mg/L) Minimum - Thermotolerant coliforms (Cfu/1 OOmL') 30 Total phosphorus_{mg/L) - 10 Total nitrogen (mg/L) - Electrical Conductivity (IJS/cm) - - pH - 15 - 1600 30 - - - - - 8 .5 6.5 Table 35: Effluent Irrigation Area Authorised Discharge Point Effluent Irrigation Location Northing (GDA94) Easting (GDA94) Exploration Camp Effluent Discharge Point Exploration Camp Effluent Irrigation 449917 7437070 1 Area 1 449877 7437081 449884 7437101 Exploration Camp Effluent Discharge Point Exploration Camp Effluent Irrigation 449919 7437085 2 Area 2 449984 7437052 449954 7437060

  242. H4

    Subject to condition H3, releases of effluent must not have any properties nor contain any organisms or other contaminants in concentrations that are capable of causing environmental harm .

  243. H5

    Treated effluent must not be used for dust suppression.

  244. H6

    Treated effluent must not be released from the site to any waters or the bed and banks of any waters.

  245. H7

    Water or storm water contaminated by sewage treatment activities must not be released to any waters or the bed and banks of any waters. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310 Land Disposal HS The holder must develop and implement an Irrigation Management Plan which adequately addresses the following: a) efficiency of application; b) control of sodicity in the soil; c) minimisation of degradation of soil structure; d) control of build ups of nutrients and heavy metals in the soil and subsoil from effluent and other sources; e) preventing impacts on the groundwater resource through infiltration; f) preventing subterranean flows of effluent to waters; g) method of application; and, h) health and safety in relation to effluent handling and irrigation.

    page 69Groundwater, Land and soil
  246. H9

    The irrigation of effluent must be carried out in accordance with the Irrigation Management Plan , such that: a) there is no surface ponding of effluent; b) soil erosion and soil structure damage is avoided; c) percolation of effluent beyond the plant root zone is minimised; d) the accumulation of nutrients and heavy metals in the soil and subsoil is minimised; and, e) the quality of groundwater is not adversely affected .

    page 70Groundwater, Land and soil
  247. H10

    Notices must be prominently displayed on areas undergoing effluent irrigation, warning the public that the area is irrigated with effluent and not to use or drink the effluent. These notices must be maintained in a visible and legible condition.

  248. H11

    The daily volume of contaminants released to land must be determined or estimated by an appropriate method, (such as a flow meter), and records kept of such determinations and estimates.

    page 70Monitoring and reporting
  249. H12

    When conditions prevent the irrigation of treated effluent to land (such as during or following rain events), the contaminants must be directed to a wet weather storage or alternative measures must be taken to store or lawfully dispose of effluent (such as tanking off site or transfer to another treatment plant).

  250. H13

    A record of the removal of treated effluent from site must be kept detailing the following information: a) date of pickup of treated effluent; b) volume of treated effluent removed from the site; c) destination of the treated effluent; and d) the transporter. Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit1 Number: Environmental Authority: MIN101017310

    page 70Monitoring and reporting
  251. H14

    The responsibility for disposal of treated effluent by a third party must only be given or transferred in accordance with a written agreement (the third party agreement) that: a) contains a commitment from the third party to dispose of or use the effluent in such a way as to prevent environmental harm or public health incidents and specifically makes the third party aware of the General Environmental Duty (GED) under section 319 of the Environmental Protection Act 1994, environmental sustainability of any effluent disposal, and the protection of environmental values of waters; b) requires the giving and transferring of treated effluent to cease where the holder of this environmental authority is notified or otherwise becomes aware that the third party's use of effluent is causing or threatens to cause unlawful environmental harm or is posing a human health risk, and the third party does not rectify the situation upon written request; and c) requires the third party to have implemented an Irrigation Management Plan that satisfies the requirements of condition H8. Effluent Monitoring

    page 71Monitoring and reporting
  252. H15

    Monitoring at all effluent discharge points must be undertaken for the parameters specified in Table 36: Effluent Monitoring Parameters on a monthly basis. Records of the monitoring program must be kept for a period offive years. Table 36: Effluent Monitoring Parameters Quality characteristics Units 5 day Biological oxygen demand mg/L Suspended solids mg/L Thermotolerant coliforms cfu/100mL Total phosphorus mg/L Total nitrogen mg/L Electrical Conductivity !JS/cm pH pH units

    page 71Monitoring and reporting
  253. H16

    The following information must be recorded in relation to all effluent sampling: a) the date on which the sample was taken; b) the time at which the sample was taken; c) the monitoring point at which the sample was taken; d) the measured or estimated daily flow of effluent at the time of sampling; and e) the results of all monitoring. Schedule 1: Water Treatment 11 The daily operation of the water treatment plant must be carried out by a person(s) with appropriate experience and/or qualifications to ensure its effective operation. 12 Brine and any contaminated water generated from the water treatment plant must only be released from the authorised discharge points specified in Table 37: Brine Water Management Infrastructure to the water management infrastructure specified in Table 37: Brine Water Management Infrastructure. Table 37: Brine Water Management Infrastructure I Authorised Discharge Point Northing (GDA94) Eastln_g_lGDA94) Water Management Infrastructure I Brine Discharg_e Point 1 450921 7427971 Temporary Brine Dam I Brine Discharge Point 2 450921 7427971 Decant Dam 13 Disposal of brine and any contaminated water to the Temporary Brine Dam must cease once the Decant Dam is operational. Environmental Authority (Mining Lease) Non Code Compliant Level 1 Mining Project Permit1 Number: Environmental Authority: MIN1 01017310 14 The hazard category of the Temporary Brine Dam must be determined by a suitably qualified and experienced person, prior to its construction and at least once every two years thereafter. 15 On cessation of operation of the Temporary Brine Dam, that dam must be maintained so as to avoid unlawful environmental harm until that dam is decommissioned. 16 The Temporary Brine Dam must be decommissioned within 12 months of the cessation of operation of the Temporary Brine Dam such that it: a) either: i. becomes a stable landform, that no longer contains flowable substances, or ii. is approved or authorised under relevant legislation for a beneficial use, or iii. is a void authorised by the administering authority to remain after decommissioning; and c) is compliant with the rehabilitation requirements of this environmental authority. Schedule: Community

    page 71Rehabilitation, Regulated structures, Monitoring and reporting
  254. F36

    - Vegetation types and density are comparable with the relevant.reference site identified in Table 28: Reference Sites for locations identified within the Rehabilitation Management Plan reguired under condition F36. Foliage cover Minimum of 70% vegetation cover is present (or 50% if rocks, longs or other features of cover are preserill:_No bare surfaces >20% m2 in area or >1 0 m in length down sl~~.:..___ Foliage cover is comparable with the relevant reference site identified in Table 28: Reference Sites for locations identified within the Rehabilitation Management Plan required under condition F36. Leaf litter, humus, depth of Evidence as recorded in the Rehabilitation Report that nutrient cycling is occurring and the growing medium presence of leaf litter is assistino in limitino erosion of the soil/spoil surface. Leaf litter, humus, depth of growing medium comparable with the relevant reference site identified in Table 28: Reference Sites for locations identified within the Rehabilitation Management Plan reguired under condition F36. Very low probability of Geotechnical studies Evidence in the rehabilitation report that appropriate risk assessment has been urideitaken rock falls with serious environmental Past record of rock falls and control measures put in place. consequences Designed and constructed in Evidence in the rehabilitation report that appropriate control measures are -in place t_o___ The diversions and run accordance with the Queensland off drainage lines mirror Government Natural Resources prevent recurrence. natural stream functions and Mines, Central West Water Management and Use Regional Documentation in the -rehabilitation report how the creek diversions have changed-overftie- Guideline: Watercourse Diversions - Central Queensland Mining course of the Project and that they are stable at closure and are likely to remain that way Industry, (2008) into the foreseeable future. Steam bank erosion rates Evidence in the rehabilitation report that all-cree-k-diversions are stable at clOsure and are likely to remain that way into the foreseeable futur-e-.-- -- ------ - --<-~-- Environmental Authority (Mining Lease) Non Code Compliant Level1 Mining Project Permit 1 Number: Environmental Authority: MIN1 01017310 Mine Domain Rehabilitation Goal Rehabilitation Indicators Completion Criteria Sustainable land use Objectives 1. Chemical properties (e.g. pH, Certification in the Rehabilitation Report that the topsoil chemical properties stipulated in Pits and Mine Waste Soil properties support salinity, nutrients, trace elements) the site Rehabilitation Management Plan are being met in the rehabilitation areas. (Includes Spoil the desired landuse of topsoil and in soil profiles Emplacement Areas, support the proposed veg_etation Certification in the Rehabilitation Report that the topsoil depths and PAWC stipulated in the Final Voids and Creek Physical properties (e.g. depth of site Rehabilitation Management Plan are being met in the rehabilitation areas. Diversions) top soil, plant available water